Haryana State Roads And Bridges Development Corporation Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana State Roads And Bridges Development Corporation Limited - HSRDC Tender

Works
Pipes and Pipe Related Activities
Eprocure
Opening Date13 May 2021
Closing Date8 Jun 2021
Tender Amount₹ 18,38,26,723 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 32,68,000
  • Document Cost

    ₹ 20,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying reinforced cement concrete M-35 grade with minimum cement content of 422 Kg. per Cum for construction of pile caps concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2100 of MoRT&H Specifications 5th revision 2013. (A) The scope of work in the items include: (1) The cost of all initial layout and setting out work including identification of existing services, if any. (2) The cost of all pumping/bailing out of water, including its labour, mateiral and equipments. (3) The cost of providing centering and shuttering including its erection, dismantling and removal of formwork including all leads and lifts with all required tools and plants to the required line and level. (4) The cost of providing and mixing all ingredients (except reinforcement steel) including admixtures etc. with batching plant, transportation, placement, finishing and curing of concrete. (5) The cost of maintenance and protection of existing services, if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of pile cap work shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same as assessed by the Engineer-in-charge shall be reimbursable. (6) The cost of installation of any fixture into the pile cap (cost of fixture to be paid separately) (7) The cost of barricading and all safety requirements as specified elsewhere in the tender doCument. (8) The cost of testing of all the materials, involved in the execution of items as per QAP. (9) The cost of all incidental labour, materials, equipment and works required to execute the job as per directions of engineer-in-charge. (B) Mode of measurement: (1) Measurements shall be made for the finished volume of reinforced cement concrete restricted to volume as per approved drawing (excluding cost of reinforcement steel only). Quantity of concrete of piles, which has gone into the pile caps shall be deducted. Reinforcement shall be measured & paid separately

1156

-

1

... More
Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing in Foundation. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. as per clause No. 1600 of MORT&H specification 2013 / Latest edition for road and bridges works.

248

-

1

... More
SUBSTRUCTURE- Piers, Abutments, Pier caps, abutment Caps, Bearing Pedestals and Bearings Providing and laying reinforced cement concrete M-35 grade with minimum cement contents of 422 Kg. per Cum for construction of abutment, return wall, wing wall, retaining wall, pier, pier cap, dirt wall etc. (sub structure) using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2200 of MoRT&H Specifications 5th revision 2013. (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, reaction & removal of staging, scaffolding and form liner etc, for abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. as stated in other parts of the tender document. (2) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge (3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender doCuments. (5) Installation of any fixtures into abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. (cost of fixtures in any, to be paid separately. (6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (7) The cost of testing all materials involved in the execution of the item as per QAP. (8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc. (B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately.

510

-

1

... More
Providing and laying reinforced cement concrete M-40 grade with minimum cement contents 0f 430Kg. per Cum for construction of bearing Pedestal, beams, slabs and PSC Girder (Super structure) using ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete excluding the cost of reinforcement steel complete as per clause No. 1000/ 1500/ 1700/ 2300 of MoRT&H Specifications 5th revision 2013. (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for bearing pedestal, beam, slab, PSC Girder etc.and other works as stated in other parts of the tender doCument. (2) The cost of casting of bearing pedestal, beam, slab, PSC Girder etc.. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge. (3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender doCuments. (5) Installation of any fixtures into bearing pedestal, beam, slab, PSC Girder etc. (cost of fixtures in any, to be paid separately. (6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (7) The cost of testing all materials involved in the execution of the item as per QAP. (8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc. (B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately.

14

-

1

... More
Supplying; fitting & fixing in position true to line and level POT / PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined with in a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be as per IRC: 83 Part-III and as per clause no. 2000 and 2200 of MORT&H specification-2013.The bearing shall be of Sanfield/METCO.(MORT&H 2000 & 2200) Free Bearing

6480

-

1

... More
Pin Bearing

1080

-

1

... More
Longitudinal and Transversely Guided Bearing (A) The scope of work of this item includes (1) The cost of design and submission of bearing design & drawings for approval to Engineer-in-charge. (2) The cost of testing of bearings as per IRC 83 (3) The coefficient of friction between PTFE and SS Plate shall be taken as 5% for designing the bearings. The range of total movement of guide and free bearing shall be 30mm. The bearings shall be pre-set in the factory as specified in the approved drawing. (4) The cost of placement of various types of bearings or its components in position during casting of pier, pier cap etc. as per detailed specifications / instructions attached, including grouting of the holes and ready mix grout underside of base plate with approved quality of non shrink cementatious grout is included in the scope of the item. (5) The cost of all materials, labour, equipments, tools and plants, machinery required for execution of works (6) The cost of cleaning of blocks, placing and grouting anchor bolts in position after proper leveling and pre-setting. (7) The cost of maintenance of bearings during construction and maintenance period. (8) The cost of supervision by bearing manufacture(s) during installation. (9) The cost of testing of all the material involved in the execution of item as per QAP. (10) The load test and other tests on completed bearings as specified by MoRT&H as acceptance criteria.

2160

-

1

... More
Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing in Sub Structure. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. as per clause No. 1600 of MORT&H specification 2013 / Latest edition for road and bridges works (MORT&H 1600).

112

-

1

... More
SUPER STRUCTURE High tensile steel wires/strands 12.7mm dia, 7 ply, low relaxation including cost of sheathing pipe Anchorage, bearing plate, Wedges, Master Grip, Strand Coupler etc, including all other necessary accessories for stressing, stressing operations and grouting complete in all respect as per drawing and technical specification as per clause No. 1800 of MoRT&H specification-2013.

39.6

-

1

... More
(A) PSC GIRDER M-45 Furnishing and placing as per drawing prestressed cement concrete in superstructure as per drawing and technical specifications as per clause No. 1000/ 1500/ 1700/ 2300 of MoRT&H Specifications 5th revision 2013. The scope of work in the item includes. (1) The cost of initial layout ensuring correct levels. (2) The cost of design of the job mix. (3) The cost of providing and mixing all ingredients including admixtures etc. with batching plant, transportation, placement, compaction, steam curing and finishing etc., which shall also involve preparation of surface, placing in position with anchorages as per specification and the direction of the Engineer-in-charge, complete job. (4) The item includes the cost of disposal of all spoils and to keep the work area neat and tidy during the work and there after. (5) The item includes the cost of barricading and all safety measures including management of traffic as desired by the Engineer-in-charge and as specified elsewhere in the tender doCument. (6) The item includes the cost of foundation preparation, making casting bed to take care of loads and settlements. (7) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (8) The cost of testing all materials involved in the execution of the item as per QAP. (9) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc. (B) Mode of Measurement: (1) Measurement shall be made for the volume of finished concrete only and will be restricted to the quantities as per the dimensions shown in the approved drawings. The reinforcement steel shall be measured & paid separately. (C.) As per site feasibility, contractor may choose by launching with Heavy capacity Cranes or cast in situ method for PSC girders as per directions of Engineer-in-charge. Both methods are deemed to be included in the quoted rates. A Longitudinal Girders

843

-

1

... More
End cross girders & intermediate cross girders

218

-

1

... More
Deck Slab

637.5

-

1

... More
Steel reinforcement: Supply, cutting, bending, fixing in position steel reinforcement of any diameter, TMT Fe-500 grade) as per relevant BIS specification and drawing in super structure works. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, overlaps, labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600of MORT&H Specification for road and bridges works (Vth revision)/ 2013 latest edition. (MORT&H 1600).

238

-

1

... More
Providing laying and fixing in position reinforced cement concrete Crash Barrier at the edges of the road, approaches to bridge structure and medians, constructed with M-40 grade concrete (including TMT reinforcement steel), including centering shuttering and form work etc. conforming to IRC:21 and dowel bars 25mm dia, 450mm long at expansion joints filled with pre-moulded asphalt filler board keyed to the structure on which it is built and installed as design given in the enclosure to MOST Circular No. RW/NH-33022/1/94-DO III dt. 24th June 1994 and at locations directed by the Engineer as per clause No. 811 of MORT&H specification-2013.

617

-

1

... More
Providing and fixing G.I. Hand Rail 65 mm dia over the crash barrier consisting of MS base plate, embedded fastener and nuts. MS vertical plates and pipes etc, as shown in the drawings and as per specifications and painting the same with 3 or more coats of paints. All the railing components as mentioned above to be hot dip galvanized with a zinc coating of at least 175 gm/sqm. Item to include all incidental works required to complete the work as per the directions of the Engineer-in-charge as per MORT&H specification-2013.

617

-

1

... More
Providing and installing single strip seal expansion joints of SANFIELD/ METCO/MAGEBA with a total allowable maximum movement 80mm as per Clause 2606 of MORTH specifications for Road and Bridge Works (5th Revision) 2013 supplemented with manufacturer’s recommendations. Entire installation is to be carried out strictly in the presence of manufacturer's representative only, at all times. The seal of the expansion joint shall be such as not to permit any dust collection at all times. A) The scope of work in the item includes: 1)Cost of all materials, labours, equipment and other incidental charges for execution of this item. Supervision during installation by the manufacturer is also included. 3)Item to include necessary provision and filling of recess for the expansion joints at no extra cost .4)The item includes the cost of testing of all the materials involved in the execution of the item as per QAP and testing of completed and installed joints as per the acceptance criteria of MORTH. B) Mode of Measurement : 1) The expansion joints shall be measured in running meters. The length payable is the actual length provided at site including vertical parts of kerbs / crash barriers, footpath etc. (MORT&H 2606).

122

-

1

... More
Providing and applying Bituminous tack coat with bitumen VG:10 using minimum 2.5 kg per 10 sqm area on granular/bituminous surface complete in all respect including cost of bitumen VG:10 as per Clause No. 503 on MoRT&H Specification 5th revision of 2013. Instruction will be issued from time to time regarding bitumen will be followed strictly.

2857

-

1

... More
Providing and laying 50mm thick Stone Matrix Asphalt with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 6.5 per cent of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor MoRT&H control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause no. 507 complete in all respect.

143

-

1

... More
Drainage spouts 100 dia G.I. pipe complete as per drawing and technical specification as per clause 2705 of MoRT&H specification (A) The scope of work in the item includes: (1) The providing, placing, joining and fixing the drainage pipes with all necessary pitting, tools and tackles etc., complete as per the approved drawing. (2) The cost of works to make taping all points to be leak proof, tested etc. including all couplers, materials, manpower and tool and tackle etc. complete as per the direction of Engineer-in-charge. (B) Mode of Measurement: (1) The measurement shall be made in number for the drainage port supplied and installed at site. The payment for the pipes will be made in running meters. The quantity will be restricted to the length as shown in the approved drawings.

120

-

1

... More
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 Cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/ Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulou8sly followed. The minimum thickness specified is exclusive of surface of glass beads. The method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note- Before start of work the contractor shall give material batch nos, manufacturing date of the material to be used.

306

-

1

... More
Providing and laying plain cement concrete M15 (aggregate 20mm nominal size) under the approach slab. The rate shall include the cost of all labour, material etc complete job as per clause No. 1000/ 1500/ 1700 of MoRT&H Specifications -2013 including bailing out water to keep the area dry as per instruction of Engineer in charge complete in all respect.

9

-

1

... More
Providing and fixing in position 20mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm covered with sealant complete as per drawing and technical specification.

15

-

1

... More
Reinforced cement concrete (M-35) with minimum cement content 422 kg per Cum of concrete in approach slab including reinforcement and formwork complete in all respect as per drawing and technical specification as per clause 1500, 1600, 1700 & 2704 of MoRT&Hspecification-2013

16

-

1

... More
Steel reinforcement: Supply, cutting, bending, fixing in position steel reinforcement of any diameter, TMT Fe-500 grade) as per relevant BIS specification and drawing in super structure works. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, overlaps, labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600of MORT&H Specification for road and bridges works (Vth revision)/ 2013 latest edition. (MORT&H 1600).

2

-

1

... More
Painting two coats after filling the surface with Birla Putty and painting the surface with synthetic enamel paint in all shades on concrete surfaces as per clause 803 of MoRT&H specification.

2842

-

1

... More
RETAINING WALL IN SOLID FILL PORTION Earthwork in excavation of foundation of structure as per drawing and technical specification, including setting on construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material MORT&H No. 12.1 (B)).

3629

-

1

... More
Providing and laying of Plain Cement Concrete M-15 with minimum cement content of 275 kg per Cum of concrete for levelling course 100 mm thick below the pile cap.as per clause 1100 and 1700 of MoRT&H specification.

279

-

1

... More
Reinforced cement concrete (M-35) with minimum cement content of 422 kg per Cum of concrete in abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. complete as per drawing and technical specifications as per clause 1500, 1700 & 2200 of MoRT&H specification.

2323

-

1

... More
Steel reinforcement: Supply, cutting, bending, fixing in position steel reinforcement of any diameter, TMT Fe-500 grade) as per relevant BIS specification and drawing in super structure works. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, overlaps, labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600of MORT&H Specification for road and bridges works (Vth revision)/ 2013 latest edition. (MORT&H 1600).

349

-

1

... More
Providing and laying of filter media with granular materials / stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification as per clause 710.1.4 of IRC:78 and 2200 of MoRT&H specification.

1209

-

1

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.

932

-

1

... More
Road Work in Retaining Wall Portion: Dismantling of reinforcement cement concrete with cleaning and straightening and cutting of bars if required (existing side drain) and existing structures like culverts, bridges, retaining walls, and other structure (HSR 8.6 e)

30

-

1

... More
Scarifying Existing Granular road surface to a depth of 300 mm and disposal of scarified material within all lifts and leads upto 1000 metres.

684

-

1

... More
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately).

1038

-

1

... More
Milling of distress bituminous layer upto 50mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the material near the central recycling plant or reclaiming to bring to required as per specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects.Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item.

160

-

1

... More
Earth work in embankment, sub grade, earthen shoulder including Lay Byes, junctions, parking with approved material obtained from Borrow pits (Minimum CBR value 8% for sub grade only) with all lead and lifts and laying in 20 cm layer and compaction including dressing of banks and side slopes to given levels and templates after breaking of clods, also including cost of watering and rolling including compensation of earth. The successive layer of earth should not be provided until and unless layer under construction is thoroughly compacted. The complete rate quoted by the contractor shall take into account all allowances for labour, hardness, wetness and all kinds of carriage, loading & unloading, total lead and lift of soil involved to the entire satisfaction of Engineer - in -charge conforming fully to specification No. 305 of MORT&H including subsequent and corrigenda issued from time to time. The compaction of work shall be achieved 97% of MDD. The top level of Sub grade should be minimum 1.00 mtr. above the adjoining field / ground levels. The rate should include excavation of road way and using the excavated soil in embankment to ensure that every where 500mm sub grade is prepared afresh with new borrow area soil having minimum CBR value 8% Adjoining field ground levels shall be mean of levels taken in every 250m length at a longitudinal distance of 25 m both sides and 50 m distance from center line of the road longitudinal profile based on above parameters shall be approved and finalized by Engineer-in-charge before GSB is started on earth work. Ensuring that average top of sub grade for whole length shall be 1.20m above adjoining ground level as defined above. Bidders are accordingly advised to inspect the site. The finished road surface will be with 2 meter earthen berms on both side with 1.5 : 1 (B : H) slope for all carriage way road as per attached X-sections. Note:- The above said embankment item inclusive of the following (i) Fly ash /Pond ash ( confirming to table 1 of IRC : SP : 58-2001) of coal or lignite burning Thermal Plants as waste martial obtained from any Thermal Power Station including spreading and compaction in layers as defined in IRC : SP : 58-2001 (ii) Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground fetching of sods and watering (MORT&H Clause 307). (NS) (iii) If soil of CBR 8% is not available then the agency will do appropriate stabilization as per IRC – SP-89-2010 as approved by Engineer and nothing extra shall be paid on this account and it will be incidental to work. No earth work will be allowed from PWD land. Vertiber Grass will be planted and maintained upto DLP on side slopes of embankment which will be incidental to work.

8324.75

-

1

... More
Construction of granular sub-base 125mm thick by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Grading-III

360

-

1

... More
Construction of granular sub-base 125mm thick by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Grading-VI

360

-

1

... More
Providing, laying, spreading and compacting graded stone aggregate 250mm thick in two layer 125mm each WET MIX MACADAM specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per clause 406 of MoRT&H specification.

722

-

1

... More
Providing and applying Primer Coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per clause 502 of MoRT&H specification.

2885

-

1

... More
Providing and applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MoRT&H specification.

5770

-

1

... More
Providing and laying 115mm thick DENSE GRADED BITUMINOUS MACADAM (in two layer 65+50mm) with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher wit sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause 507 complete in all respect.

332

-

1

... More
Providing and laying 50 mm compacted thickness of Bituminous Concrete (BC) in one layer with 80-100 THP batch type batch type Hot Mix Plant with bituminous binder VG-40 5.2% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory or with pneumatic tyred roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.2% as per job mix formula no extra payment will be made. Extra bituminous required will be considered as incidental to work.

145

-

1

... More
Provision of an reinforced cement concrete crash barrier at the edges of the road approaches to bridge structures and medians, constructed with M-40 grade concrete with minimum cement content 430 kg per Cum of concrete filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular no. RW/NH-33022/194-DO III dated 24th June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified. as per clause 1000, 1500, 1700, 2100 of MoRT&H specification. (Including reinforcement and form work).

570

-

1

... More
Providing and fixing hand rail over the crash barrier kerb consisting of MS base plate, embedded fasterner and nuts, MS vertical plates and pipes etc. as shown in the drawings and as per specifications and painting the same with 3 or more coats of paints. All the railing components as mentioned above to be hot dip galvanised with a zinc coating of at least 175 gm/sqm. Item to include all incidental works required to complete the work as directed by the Engineer-in-charge (N.S)

570

-

1

... More
SERVICE ROAD / SLIP ROAD Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 as per clause 305 of MoRT&H specification.

1572

-

1

... More
Construction of Granular Sub-Base 150mm thick by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 grade-III

1179

-

1

... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)

1179

-

1

... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per Cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )

1965

-

1

... More
Construction of Cement Concrete Kerb with top and bottom width 115 and 165 mm respectively, 400 mm high in M20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408

1226

-

1

... More
INTERLOCKING CONCRETE BLOCK PAVEMENT BETWEEN KERB Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

510

-

1

... More
Construction of Granular Sub-Base 150mm thick by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.

381

-

1

... More
Providing and lying 80 mm thick ISI mark interlocking paver Blocks confirming to IS 15658:2006 / IRC SP 63-2004 of all shapes and colours in design mix cement M-35 over a bed of 25 mm thick fine sand complete in all respect as per (HSR item no. 10.159)

2540

-

1

... More
RAIN WATER HARVESTING Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

236

-

1

... More
Plain cement concrete (M-15) in open foundation complete as per drawing and technical specification as per clause 1500, 1700 & 2100 of MoRT&H specification .

7

-

1

... More
Reinforced cement concrete (M-35) with minimum cement content 422 kg per Cum of concrete in open foundation complete as per drawing and technical specification as per clause 1500, 1700 & 2100 of MoRT&H specification.

66

-

1

... More
Brick Masonry work in cement mortar 1:3 in foundation conplete excluding pointing and plastering, as per drwaing and technical specifications .

2

-

1

... More
Boring for hand-pump in clay, fitting strainer and pipe (b) above 75 mm dia bore, but not exceeding 100 mm dia (i) from 0 to 15 meter (HSR 26.10 (b) (i))

16

-

1

... More
Boring for hand-pump in clay, fitting strainer and pipe (b) above 75 mm dia bore, but not exceeding 100 mm dia (i) exceeding 15 meters, but upto 30 meters (HSR 26.10 (b) (ii))

10

-

1

... More
Providing & fixing PVC Rain water pipe 6 kg. pressure of ISI mark (b) 150 mm dia PVC pipe 6 kg. pressure, Supreme, phinolex, Prince (HSR 13.89 b)

13

-

1

... More
Providing & fixing PVC sloted pipe ISI mark. 150 mm dia Supreme, phinolex, Prince etc (NS)

2

-

1

... More
Providing 150mm dia cowl over 150mm dia PVC pipe at the top (N.S)

57

-

1

... More
Providing and placing in horizontal layers filtering media screened, washed and cleaned as described below (HSR 28.50) Top layer: Filter media coarse sand 1.5 mm to 2 mm

10

-

1

... More
Second layer: Filter media fine graded 2 mm to 4 mm

10

-

1

... More
Third layer : Filter media course gravel 4 mm to 8 mm

10

-

1

... More
Fourth layer : Filter media boulders 50 mm to 75 mm

27

-

1

... More
Providing and fixing SFRC manhole covers and frames markd with IS: 12592 including setting the same to correct lines and levels in 1:2 cement sand mortar over manhole including carriage loading, unloading stacking, handling, re-handling etc. complete in all respect to the satisfaction of engineer-in-charge. Type: Extra heavy duty set (MD-10) 560 mm clear opening. (As per HSR 29.94)

2

-

1

... More
Supplying, fitting and placing Fe-500 D TMT bar reinforcement in super-structure complete as per drawing and technical specifications as per clause 1600 of MoRT&H specification.

4

-

1

... More
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES Providing and applying 2 coats of water based acrylic exterior paint (like Wheather Shield, Apex or equivalent) to concrete surface / Retaining wall/ RE Wall Panels etc. including two coats of cement primer after cleaning the surface of dirt, dust, oil, grease, efflorescence, as per clause 800.

11450

-

1

... More
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)

800

-

1

... More
Providing & fixing road side delinator of height 1200 mm made of M. S. tube size 100 x 80 mm having thickness 1.2mm of height 900 mm and balance 300 mm of M. S. angle 25 x 25 x 3 mm. Having micro prismatic retro-reflective panel conforming to IRC : 67-2012 type 4 HIP and of size 80mm x 150mm on both sides as per clause No. 800 of MORT&H. Complete delineator processed by heat treatment process to makes it resistant to all weather effects fixed in C.C. 1:2:4 block size of 300 x 300 x 450 mm as clause No. 806 of MORT&H specification 5th revision 2013)

15

-

1

... More
Providing and fixing of shoulder mounted sign boards of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC: 67-2012 type IV HIP specification fixed on 3mm thick Aluminum composite panels as base board with pressure-sensitive adhesive having 0.5mm thick Aluminum on both sides supported on Mild steel pipe post 80mm NB medium class 4mm thick embedded M-20 grade concrete foundation of size 450mmx450mmx600mm, complete as per drawings, Technical specifications and as directed by Engineer-in-Charge. a) 600mm Circular

6

-

1

... More
600mm Equilateral Triangle

20

-

1

... More
600mm high Octagon

4

-

1

... More
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (450 mm X 450 mm X 600 mm) / (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. a) Size 900mmx600mm

2

-

1

... More
Size 1200mm x 900mm

2

-

1

... More
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (450 mm X 450 mm X 600 mm) / (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. a) Size 900mmx600mm

2

-

1

... More
Size 1200mm x 900mm

2

-

1

... More
Providing & erecting OVERHEAD SIGNS including gantry using non-metallic micro prismatic retro reflective sheet conforming to IRC: 67 - 2012 Type IV specification fixed on 4mm thick Aluminum Composite Panels as base board with pressure-sensitive adhesive having 0.5 mm thick Aluminum on both sides supported by M. S. Pipe Structure complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including construction of R. C. C. foundation for providing of M. S Tubular structure for cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Cantilever Over head Sign gantry. (T-Type) Size- 5000mm x 1500mm retro reflective both side (complete including foundation + framed pipe structure + Retro reflective board)

2

-

1

... More
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides. (of reputed make such as Array Dennison/3M)

8

-

1

... More
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect

2

-

1

... More
Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6 mm at an angle of 450 to the direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post firmly embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed faces, all complete as per approved design and drawings) .

300

-

1

... More
Providing & fixing retro-reflective light bollards 1500 mm high as per site requirements, using non-metallic micro prismatic rectro reflective sheets conforming to IRC : 67-2012 type 4, HIP specification fixed on 3 mm thick aluminum composite material sheet as base having 0.5 mm thick aluminum on both sides having circular board of size 450mm dia, sheeting of blue back ground and white arrow. The order board will be of size 600 mm x 400 mm made up of high intensity retro-reflective sheeting type 4 fixed over aluminum composite panel sheet 3 mm thick both of the boards fixed on 80 mm NB dia 16 gauge M.S. pipe duly printed. The board to be fixed in CC 1:2:4 block of size 300x300x450mm

4

-

1

... More
Providing and fixing chevron boards as per standard size mentioned in IRC-67/relevant IRC/IS code as per MoRT&H specifications complete in all respect to the satisfaction of engineer-in-charge.

60

-

1

... More
Providing & fixing small two way median markers as per standard size mentioned in IRC-67/relevant IRC/IS code as per MoRT&H specifications complete in all respect to the satisfaction of engineer-in-charge.

300

-

1

... More
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- a) i) Bituminous Material @ 80% of 159.54 Cum = 127.63 Cum @ Rs. 1500 Cum.

128

-

1

... More
ii)  Granular material @ 80% of 683.76 Cum = 547 Cum @ Rs. 715.90 P. Cum. Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.

547

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.