Haryana State Roads And Bridges Development Corporation Limited Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 10,21,000Document Cost
₹ 20,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HBC_442832_1Tender No
2025546C82AA 805A 4650 A452 B4CE5BAC4DAE1157RBDTender Authority
Haryana State Roads And Bridges Development Corporation Limited ViewPurchaser Address
-Website
http://etenders.hry.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stone consolidation-removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar 1:1:1 (1 Lime: 1 Surkhi 1: Coarse sand ) wherever necessary.
800.01
-
-
... More
Restoration of missing portion/patch repair with underpinning method by using bond stone techinque:
Random rubble masonry with hard stones in foundation and plinth including levelling with lime concete (1 lime: 1 Surkhi: 1 coarse sand) with 20mm stone aggregate upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)
750
-
-
... More
Consolidating the base area including cutting and filling, rammimg and watering complete to make the surface good for laying of concrete including appropriate slope required to safeguard the surface from rain water.
3050
-
-
... More
Providing and laying lime concrete with graded brick bats and 50% lime mortar 1:1:1 (1 Slaked lime : 1 Surkhi : 1 Coarse sand) rammed and finished with gur and belgiri treatment excluding cost of centring and shuttering.
(Thickness 100 mm)
3048
-
-
... More
40 mm thick (Aevrage) fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:1:1 (1 lime: 1 surkhi:1coarse sand) with joints finished flush.
3050
-
-
... More
30-40mm lime plaster in two coats with 20mm base coat in lime mortar 1:1:1 (1 lime : 1 Surkhi :1 Coarse Sand) and top coat in lime mortar 1:1:1 (1 lime : 1 Surkhi :1 Fine Sand).
4500
-
-
... More
Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi : 1 fine sand)
250
-
-
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
NOTE:- To be used for maintenance work judicially necessary deduction for scaffolding in the existing item to be done
1800
-
-
... More
Hiring of water tanker (4500 ltrs) during excution of work. Since the water is salty at site and its not useful for lime mortar work.
150
-
-
... More
Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry/plastered wall surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials and labours involved except scaffolding).
4500
-
-
... More
Provision for hiring (for 6 months) of special type of lime mortar mill (pan type) electrical/mechnical for thorough grinding and mixing of lime mortar and making lime putty as per site requirement including diesel and maintenance.
3
-
-
... More
Curing of Lime concrete/Lime plaster surface with water mixed with milk of lime, pulp of belgiri and jaggery water (Gur/sheera) to achive the required hardness.
63250
-
-
... More
Construction of tanks of different sizes for slaking of lime and making lime putty as per archaelogical specification: Brick Work with common burnt clay F.P.S (non modular ) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 ( 1 cement : 4 coarse sand)
13.38
-
-
... More
Providing, erecting, maintaining and removing temporary protective screens made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineer-in-charge. Wooven PVC cloth
1227.52
-
-
... More
Provisions for basic amenties at a suitable site that does not harm or obstruct the view of the heritage structure, as per preliminary project report for development of basic amenities in herirage sites and monumnets. It incldues an attendant room, washroom facilites, water point, ticket counter/ tourist information centre.
Note: The work must be carried out very carefully to ensure that it does not harm the heritage site. The aesthetics should align with heritage norms and the site’s character, and all materials must be heritage-compatible and design as per the site requirement. The entire process must be executed under the strict supervision of architect/archaeological engineer/archaeologist.
1
-
-
... More
Providing and supplying as per preliminary project report for development of basic amenities in herirage sites and monumnets, stone benches, signage, dustbins, designed to complement the aesthetics of the heritage structure and the site. The furniture should be made from durable, heritage-appropriate materials as per site requirements. Stone benches/table
Note: The entire process must be executed under the strict supervision of an architect, archaeological engineer, or archaeologist to ensure compliance with heritage conservation norms and site sensitivity.
15
-
-
... More
Providing and supplying as per preliminary project report for development of basic amenities in herirage sites and monumnets, stone benches, signage, dustbins, designed to complement the aesthetics of the heritage structure and the site. The furniture should be made from durable, heritage-appropriate materials as per site requirements. Informational Signage made with stone
Note: The entire process must be executed under the strict supervision of an architect, archaeological engineer, or archaeologist to ensure compliance with heritage conservation norms and site sensitivity.
2
-
-
... More
Providing and supplying as per preliminary project report for development of basic amenities in herirage sites and monumnets, stone benches, signage, dustbins, designed to complement the aesthetics of the heritage structure and the site. The furniture should be made from durable, heritage-appropriate materials as per site requirements. Dustbins matching with site/built fabric
Note: The entire process must be executed under the strict supervision of an architect, archaeological engineer, or archaeologist to ensure compliance with heritage conservation norms and site sensitivity.
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%