Haryana State Federation Of Cooperative Sugar Mills Limited Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HBC_420440_1Tender No
TENDER FOR THE MEETING 10-01-2025Tender Authority
Haryana State Federation Of Cooperative Sugar Mills Limited ViewPurchaser Address
-Website
http://etenders.hry.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Concrete and RCC Work G DESIGN MIX CONCRETE Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge.
All works up to plinth level.
40 X 1.7 X 0.20 = 13.6 CUM
40 X 2 X 1.82 X 0.15 = 21.84 CUM
2 X ½ X40 X 0.10 X 0.10 = 0.4 CUM
36
-
-
... More
Concrete and RCC Work G DESIGN MIX CONCRETE Extra for providing richer mixes up to plinth and at all floor levels..
Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum)
40 X 1.7 X 0.20 = 13.6 CUM
40 X 2 X 1.82 X 0.15 = 21.84 CUM
2 X ½ X40 X 0.10 X 0.10 = 0.4 CUM
36
-
-
... More
Concrete and RCC Work J STEEL REINFORCEMENT Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. 12 MM TMT bar 400 X 2 X 1.87=1496 Mtr
400 X 2 X 2 X 2.27 = 3632 Mt Total = 5128 Mtr Weight calculation per mtr = 0.89 kg Total weight 12 MM TMT= 4564 Kg
10 MM TMT bar 2 X 16 X 40 = 1280 Mtr
2 X 2 X 19 X 40 = 3040 Mtr Total = 4320 Mtr
Weight Calculation per mtr= 0.62 Kg
Total weight 10 MM TMT=2678 Kg
Overlap 10 MM 2 X 16 X 4 X 1.2 =154 Mtr.
2 X 2 X 19 X 4 X 1.2 =365 Mtr
63 X 1.5 = 95 Mtr Total = 614 Mtr
Weight Calculation per mtr= 0.62 Kg Total = 381 Kg
Total TMT bar weight = 7623 Kg
Haunch steel 10% extra to be total steel = 8385 kg
8385
-
-
... More
Works NA Clearing and Grubbing Land . Compaction
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications
16
-
-
... More
Works NA Clearing and Grubbing Land . Compaction
Extra for rolling to specifications
16
-
-
... More
Concrete and RCC Work I CENTRING AND SHUTTERING (FORM WORK) Centering and shuttering including strutting, propping etc. and
removal of form for.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
320
-
-
... More
Concrete and RCC Work I CENTRING AND SHUTTERING (FORM WORK) Centering and shuttering including strutting, propping etc. and
removal of form for Suspended floors, roofs, landings, balconies and access platform
50
-
-
... More
Finishing Works NA EXTERIOR FINISHING WALL AND ROOF SURFACES Finishing walls with water proofing cement paint of required
shade :
New work (Two or more coats applied @ 3.84 kg/10 sqm)
2 X 40 X 1.82 = 145.6 sqm
40 X 1.37 = 54.8 sqm
Total = 204 sqm
204
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%