Haryana State Cooperative Supply And Marketing Federation Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana State Cooperative Supply And Marketing Federation Limited - HAFED Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Jul 2024
Closing Date18 Jul 2024
Tender Amount₹ 9,01,935 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 21,000
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 1,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of 33 ft wide road with main gate pillar from Hafed complex Murthal to CIPET PWD approach Road
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (in case of link roads earthwork to be done by villagers

-

-

-

... More
Water Bound Macadam Gr I 17.22.2 Water Bound Macadam Grading I with screening Type 'A'

101.43

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-1 0 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (63-45 mm)

-

-

-

... More
Water Bound Macadam Grading -II 17.23.2 Water Bound Macadam - II with Screening Type 'A' / Type B

202.86

-

-

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-1 0 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (53-22.4)

-

-

-

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 meters lead

4.74

-

-

... More
Demolishing brick work manually /by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer in charge

14.57

-

-

... More
Demolishing cement concrete manually /by mechanical means incuding disposal of material within 50 meters lead as per direction of Engineer -in -charge (for removing angle)

5

-

-

... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 5.7.4 From brick work in cement mortar

4196

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. Unit 4.12.1 All kinds of soil

3.76

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:8:16 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)

0.63

-

-

... More
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in:

1.65

-

-

... More
Brick work with common burnt clay non-modular bricks of class designation 7.5 in superstructure above plinth level up to floor 4 level in all shapes and sizes in: 7.22.2 Cement motar 1:6 ( 1 Cement : 6 Coarse sand)

3.72

-

-

... More
12 mm cement plaster of mix :

21.46

-

-

... More
Finishing walls with Premium Acrylic Smooth Exterior paint with Silicon additives of required shade :11.96.1 New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied

21.46

-

-

... More
Providing and applying two coats white cement based putty of approved brand and manufacture ,over plastered surface and grinding the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material ,laboue charges ,scaffolding ,sundries etc complete

21.46

-

-

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 13.29.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

906

-

-

... More
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete to give an even shade

36.79

-

-

... More
Description

-

-

-

... More
Recovery of old good Brick

-4196.22

-

-

... More
Recovery of Brick Bats

-6

-

-

... More
Recovery of Old Steel-As per Item Sr. 5.37

-4.74

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.