Haryana Power Generation Corporation Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana Power Generation Corporation Limited - HPGCL Tender

Works
Solid Waste Management
Eprocure
Opening Date11 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 21,65,324 
Notes
Download

Costs

  • EMD

    ₹ 51,200
  • Document Cost

    ₹ 1,180
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dearator: Dearator Floor, toilet at Dearator Floor etc ( NS) 1st year ( Item Frequency- Weekly)

52

-

-

... More
Firing floor: AB/CD/EF elevation, floor below AB elevation (for both passes) including area which leads to RAH & RAH platforms, APRDS area from unit-7 to center of unit-7&8, working floor area adjoining the APRDS (above TG floor) and APRDS toilet etc., Stairs from TG floor (near control room) to dearator floor and TG floor (near lift) to dearator floor(NS) 1st year ( Item Frequency-Daily)

365

-

-

... More
Area from Economizer middle to LTSH top of boiler (for both passes) including associated pipelines, beams, channels, etc. of that area (NS) 1st year ( Item Frequency- Twice a week)

104

-

-

... More
Platforms above ground floor and upto the platform below the floor leading to RC feeder (for both passes) (NS) 1st year ( Item Frequency- Twice a week)

104

-

-

... More
Area above LTSH top to top floor of boiler including pent house roof etc. (for both passes) (NS) 1st year ( Item Frequency- Weekly)

52

-

-

... More
Roof of ducts: RAH outlet to ESP inlet, cold and hot air ducts/pipes of PA/FD fans which leads to coal mills etc. including all floors of ID/FD/PA fans (NS) 1st year ( Item Frequency- Fornightly)

26

-

-

... More
Chimney: Cleaning of all elevations of Chimney of Unit-7 & 8.(NS) 1st year ( Item Frequency- Bimonthly)

6

-

-

... More
Lifting and disposal of Garbage / Ash leaked from boiler area by tractor trolley as per direction of EIC(NS) 1st year ( Item Frequency- As per site requirement)

180

-

-

... More
Ground Floor: Area from surface drain along road (East side) to Boiler Unit-7 (West side) up to the line joining the center of chimney and D.M. Storage tank provided between Unit-7&8 and area between back wall of service building unit -7 to main road of coal mill unit-7 (Excluding area J.T. 25) including cleaning of trenches of coal mills. Area from surface drain along road (East side) to Boiler Unit-7 (West side) up to the line joining the center of chimney between Unit-7&8 and area from ESP inlet to concrete/cemented area up to back trench (along the road, North side) of ID fans, ESP MCC room, ESP control room, ESP Transformers yard, ESP toilet, Ground floor of Chimney area for unit-7 including cleaning of trenches of ESP(NS) 2nd year ( Item Frequency- Daily)

365

-

-

... More
ESP: ESP Floors of all the passes at 4.50 meter Elevation, all the passes at 11.7 meter Elevation and ESP roofs at 25.65 meter Elevation (NS) 2nd year ( Item Frequency- Twice a week)

104

-

-

... More
Fuel Oil Pump house: Inside area of fuel oil pump house and concrete area in front of fuel oil pump house (NS) 2nd year ( Item Frequency- Daily)

365

-

-

... More
Dearator: Dearator Floor, toilet at Dearator Floor etc ( NS) 2nd year ( Item Frequency- Weekly)

52

-

-

... More
Firing floor: AB/CD/EF elevation, floor below AB elevation (for both passes) including area which leads to RAH & RAH platforms, APRDS area from unit-7 to center of unit-7&8, working floor area adjoining the APRDS (above TG floor) and APRDS toilet etc., Stairs from TG floor (near control room) to dearator floor and TG floor (near lift) to dearator floor(NS) 2nd year ( Item Frequency- Daily)

365

-

-

... More
Area from Economizer middle to LTSH top of boiler (for both passes) including associated pipelines, beams, channels, etc. of that area (NS) 2nd year( Item Frequency- Twice a week)

104

-

-

... More
Platforms above ground floor and upto the platform below the floor leading to RC feeder (for both passes) (NS) 2nd year ( Item Frequency- Twice a week)

104

-

-

... More
Area above LTSH top to top floor of boiler including pent house roof etc. (for both passes) (NS) 2nd year ( Item Frequency- Weekly)

52

-

-

... More
Roof of ducts: RAH outlet to ESP inlet, cold and hot air ducts/pipes of PA/FD fans which leads to coal mills etc. including all floors of ID/FD/PA fans (NS) 2nd year ( Item Frequency- Fornightly)

26

-

-

... More
Chimney: Cleaning of all elevations of Chimney of Unit-7 & 8.(NS) 2nd year ( Item Frequency- Bimonthly)

6

-

-

... More
Lifting and disposal of Garbage / Ash leaked from boiler area by tractor trolley as per direction of EIC(NS) 2nd year ( Item Frequency- As per site requirement)

180

-

-

... More
Ground Floor: Area from surface drain along road (West side) to Boiler Unit-8 (East side) up to the line joining the center of chimney and D.M. Storage tank provided between Unit-7&8 and area between back wall of service building, unit-8 to main road of coal mill unit-8 including cleaning of trenches of coal mills. Area from surface drain along road (West side) to Boiler Unit-8 (East side) up to the line joining the center of chimney between Unit-7&8 and area from ESP inlet to concrete/cemented area upto back trench (along the road, North side) of ID fans, ESP MCC room, ESP control room, ESP transformer yard, ESP toilet, Ground floor of Chimney area including cleaning of trenches including cleaning of trenches of ESP(NS) 1st year ( Item Frequency- Daily)

365

-

-

... More
ESP: ESP Floors of all the passes at 4.50 meter Elevation, all the passes at 11.7 meter Elevation and ESP roofs at 25.65 meter Elevation (NS) 1st year ( Item Frequency- Twice a week)

104

-

-

... More
Cemented/Concrete area between CW Pump House building and main road of Unit-8 (NS) 1st year ( Item Frequency- Daily)

365

-

-

... More
Dearator: Dearator Floor, etc ( NS) 1st year ( Item Frequency- Weekly)

52

-

-

... More
Firing floor: AB/CD/EF elevation, floor below AB elevation (for both passes) including area which leads to RAH & RAH platforms, APRDS area from unit-8 to center of unit 7 & 8, working floor area adjoining the APRDS (above TG floor) and APRDS toilet etc. of Unit-8, Stairs from TG floor (near control room) to dearator floor etc.(NS) 1st year ( Item Frequency- weekly)

365

-

-

... More
Area from Economizer middle to LTSH top of boiler (for both passes) including associated pipelines, beams, channels, etc. of that area (NS) 1st year ( Item Frequency- Twice a week)

104

-

-

... More
Platforms above ground floor and upto the platform below the floor leading to RC feeder (for both passes) (NS) 1st year ( Item Frequency- Twice a week)

104

-

-

... More
Area above LTSH top to top floor of boiler including pent house roof etc. (for both passes) (NS) 1st year ( Item Frequency- Weekly)

52

-

-

... More
Roof of ducts: RAH outlet to ESP inlet, cold and hot air ducts/pipes of PA/FD fans which leads to coal mills etc. including all floors of ID/FD/PA fans (NS) 1st year ( Item Frequency- Fornightly)

26

-

-

... More
Chimney: Cleaning of all elevations of Chimney of Unit-7 & 8.(NS) 1st year ( Item Frequency- Biomonthly)

6

-

-

... More
Lifting and disposal of Garbage / Ash leaked from boiler area by tractor trolley as per direction of EIC(NS) 1st year ( Item Frequency- As per site requirement)

180

-

-

... More
Ground Floor: Area from surface drain along road (West side) to Boiler Unit-8 (East side) up to the line joining the center of chimney and D.M. Storage tank provided between Unit-7&8 and area between back wall of service building, unit-8 to main road of coal mill unit-8 including cleaning of trenches of coal mills. Area from surface drain along road (West side) to Boiler Unit-8 (East side) up to the line joining the center of chimney between Unit-7&8 and area from ESP inlet to concrete/cemented area upto back trench (along the road, North side) of ID fans, ESP MCC room, ESP control room, ESP transformer yard, ESP toilet, Ground floor of Chimney area including cleaning of trenches including cleaning of trenches of ESP(NS) 2nd year ( Item Frequency- Daily)

365

-

-

... More
ESP: ESP Floors of all the passes at 4.50 meter Elevation, all the passes at 11.7 meter Elevation and ESP roofs at 25.65 meter Elevation (NS) 2nd year ( Item Frequency- Twice a week)

104

-

-

... More
Cemented/Concrete area between CW Pump House building and main road of Unit-8 (NS) 2nd year

365

-

-

... More
Dearator: Dearator Floor, etc ( NS) 2nd year ( Item Frequency- Weekly)

52

-

-

... More
Firing floor: AB/CD/EF elevation, floor below AB elevation (for both passes) including area which leads to RAH & RAH platforms, APRDS area from unit-8 to center of unit 7 & 8, working floor area adjoining the APRDS (above TG floor) and APRDS toilet etc. of Unit-8, Stairs from TG floor (near control room) to dearator floor etc.(NS) 2nd year ( Item Frequency- Daily)

365

-

-

... More
Area from Economizer middle to LTSH top of boiler (for both passes) including associated pipelines, beams, channels, etc. of that area (NS) 2nd year ( Item Frequency- Twice a week)

104

-

-

... More
Platforms above ground floor and upto the platform below the floor leading to RC feeder (for both passes) (NS) 2nd year ( Item Frequency- Twice a week)

104

-

-

... More
Area above LTSH top to top floor of boiler including pent house roof etc. (for both passes) (NS) 2nd year ( Item Frequency- Weekly)

52

-

-

... More
Roof of ducts: RAH outlet to ESP inlet, cold and hot air ducts/pipes of PA/FD fans which leads to coal mills etc. including all floors of ID/FD/PA fans (NS) 2nd year ( Item Frequency- Fornightly)

26

-

-

... More
Chimney: Cleaning of all elevations of Chimney of Unit-7 & 8.(NS) 2nd year ( Item Frequency- Bimonthly)

6

-

-

... More
Lifting and disposal of Garbage / Ash leaked from boiler area by tractor trolley as per direction of EIC(NS) 2nd year ( Item Frequency- As per site requirement)

180

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.