Haryana Power Generation Corporation Limited Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Haryana Power Generation Corporation Limited - HPGCL Tender

Works
Transportation and Logistics
Eprocure
Opening Date20 Feb 2024
Closing DateCancelled
Tender Amount₹ 52,03,653 
Notes
Download

Costs

  • EMD

    ₹ 1,22,806
  • Document Cost

    ₹ 1,180
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Overhauling of the main reducer, including replacement of coupling halves, bearings, seals, gears, shafts or any other worn out/damaged components if required and normalization.

3

-

-

... More
Replacement of main reducer with new/repaired & serviced reducer and normalization.

2

-

-

... More
Replacement of Aux. reducer and its cleaning, servicing complete work and normalization.

2

-

-

... More
Checking and replacement of mill drive system i.e. Auxiliary motor to Pinion including opening, servicing and refixing of couplings complete work and normalization.

3

-

-

... More
Inspection of support bearing including cleaning of internals & oil spray nozzles, checking of bearing clearance & shell lift and replacement of window gaskets, if required and normalization.

4

-

-

... More
Replacement/opening, repairing & refixing of support bearing liner including shifting the cradle inside the mill and lifting the shell for liner replacement, checking & adjustment of bearing clearances and shell lift and normalization.

3

-

-

... More
Alignment of driving pinion with main reducer, main reducer with main motor and main motor with Auxiliary reducer.

3

-

-

... More
Replacement/dismantlement, complete servicing & assembly of screw conveyor assembly including opening & refixing hot air box, replacement/repair of drive bars & protecting sleeves and screw conveyor alignment, replacement, removal & refixing of bearing housing, replacement of half wear sleeves and felt seals. Adjustment of bearing housing for getting equal clearance in rewelding. Checking & adjustment of clearance of screw conveyor flange with conveyor body. Replacement/repair of hot air tube/body liners of screw conveyor assembly and locking & straightening of ribbon at coal inlet end and normalization.

3

-

-

... More
Replacement of screw conveyor ribbon(complete) including vertical positioning of the screw conveyor assembly and alignment of new ribbon with other ribbons, cutting and removal of old ribbon and chain links and welding on new ribbon, locking & straightening of ribbon at coal inlet end and final adjustment of ;chain links for getting proper running clearances in the trunion tube & normalization.

3

-

-

... More
Replacement/repositioning of liner plates of mill shell including perfect site cleaning, grinding of liners sides, tightening of liner bolts after 50% and 100% ball charging, readjustment of shell liners for shell balancing and normalization.

100

-

-

... More
Removal of balls from mill shell: a) Segregation of balls of more than 20mm dia and filling & sealing in the drums(per drum)

160

-

-

... More
b) Segregation of balls of less than 20mm dia and filling & sealing in drums and transporting to scrap yard (per drum)

60

-

-

... More
Initial Ball charging to mill including transportation of balls from stores (while mills are under capital shutdown or after complete segregation of grinding media) per ton.

180

-

-

... More
Replacement/readjustment of girth gear seal air belt including perfect cleaning of sealing surface, seal counter flange, and the existing belt(for adjustment purpose) and providing proper stiffeners, air tightness check and normalization.

3

-

-

... More
Replacement/readjustment of trunion seal air gasket including perfect cleaning of sealing surface, seal counter flange and providing proper stiffeners, air tightness & normalization.

4

-

-

... More
Replacement/Dismantlement, repair and reassembly of classifier outlet gates body and plate including replacement of seals, brass bushing and any other worn out component if any & normalization.

3

-

-

... More
Replacement of ceramic tiles to reduce wear out of classifier outlet gates and normalization.

3

-

-

... More
Replacement/removing, repair & refixing of transit pieces and T pieces including all cutting & welding work and normalization.

3

-

-

... More
Replacement/removing & refixing of purge air expansion joint and purge air duct and all cutting & welding and normalization.

3

-

-

... More
Replacement/removing & refixing of mill outlet elbow including replacement of spool pieces at its outlet pipe and normalization.

12

-

-

... More
Replacement/removing & refixing of orifices in the PF Pipe line and normalization.

1

-

-

... More
Replacement/removing & refixing of Rockwell coupling including replacement of coupling gaskets and normalization.

20

-

-

... More
Putting patch by welding for attending coal leakage at any point, Length, width & thickness of patch piece about 300X250X12.5mm.

150

-

-

... More
Replacement of rubber gaskets of victaulic coupling & normalization.

30

-

-

... More
Replacement of long ceramic bend and normalization.

5

-

-

... More
Replacement of short ceramic bend and normalization.

5

-

-

... More
Replacement/removing & refixing of PF Pipe of 22” dia up to length of 2 Mtr. In the fuel pipe lines & normalization.

5

-

-

... More
Replacement of PF pipe of dia 22” of length more than 2 Mtrs. & up to 5 Mtrs. Long in the fuel pipe line and normalization.

5

-

-

... More
Replacement of centre feed pipe cone(Raw Coal Chute) at the Gravimetric feeder outlet and normalization.

2

-

-

... More
Clearing of chocking of one PF Pipe from classifier outlet to Furnace and normalization.

3

-

-

... More
Clearing of chocking of centre feed pipe from Gravimetric feeder out to mill inlet(either end) and normalization.

4

-

-

... More
Complete Dismantlement, servicing & assembly of Ball feeding gate, burner outlet gate, feeder inlet gate & outlet gate including replacement of any damaged/worn out component if any and normalization.

6

-

-

... More
Servicing & adjustment of damper including replacement of any component, if required, and normalization a) Hot air damper

3

-

-

... More
Servicing & adjustment of damper including replacement of any component, if required, and normalization b) Cold air damper

3

-

-

... More
Servicing & adjustment of damper including replacement of any component, if required, and normalization c) Mixed air damper

6

-

-

... More
Servicing & adjustment of damper including replacement of any component, if required, and normalization d) By pass air damper

6

-

-

... More
Servicing & adjustment of damper including replacement of any component, if required, and normalization e) Purge air damper.

12

-

-

... More
Replacement/opening & refixing of feeder belt including dismantlement and assembly of all relevant components and belt tracking and normalization.

8

-

-

... More
Servicing/Replacement of Dyno Drive System of R.C. Feeders & normalization. It includes replacement of worn out/damaged mechanical parts.

3

-

-

... More
Servicing / Replacement of Main Drive Gear Box & normalization .It includes replacement of worn out/damaged components.

3

-

-

... More
Supply of following manpower for the works on Boiler Area other than above stipulated works with required T & P:- a) Skilled labour

50

-

-

... More
Supply of following manpower for the works on Boiler Area other than above stipulated works with required T & P:-( b) Unskilled labour

50

-

-

... More
Note: 1. Overall total rates for complete 2 years ( Part A +Part B) of the NIT will be considered for basis of allotment of the work. The complete work shall be allotted to overall single lowest bidder.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.