Haryana Power Generation Corporation Limited Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Haryana Power Generation Corporation Limited - HPGCL Tender
Machinery and Tools
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 May 2024
Closing Date6 Jul 2024
Tender Amount₹ 83,31,797
Costs
EMD
₹ 1,96,630Document Cost
₹ 1,180Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HBC_372102_1Bid Award Id
ViewTender No
2024F5E62D6D 250B 417A B974 DD603000F239711PGCTender Authority
Haryana Power Generation Corporation Limited ViewPurchaser Address
-Website
http://www.hpgcl.org.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Replacement of Hydraulic coupling of ID Fans with new one or repaired one. (Completition Period 40 Hrs.)
3
-
-
Servicing of hydro coupling including dismantlement & assembly at Workshop (Completition Period 40 Hrs.)
3
-
-
Replacement of shaft & Impeller assembly of ID Fan including dismantlement of fan casing, actuator assembly & CCW coolers etc. if required( covering replacement of DE & NDE Bearings) (Completition Period 40 Hrs.)
1
-
-
Replacement of DE Bearing of ID/PA Fans (Completition Period 36 Hrs.)
2
-
-
Replacement of NDE Bearing of ID/PA Fans (Completition Period 36 Hrs.)
2
-
-
Replacement of Cylindrical roller Bearings(02 Nos.) and Annular thrust ball bearing(01 No.) of FD Fans(Axial Flow Fan) (Completition Period 48 Hrs.)
1
-
-
Replacement of Blade shaft Bearings of FD Fans(Axial Flow Fan) (Completition Period 48 Hrs.)
1
-
-
Replacement of bearings (DE/NDE) of seal air Fans after dismantlement of bearing housing and assembly thereof. (Completition Period 40 Hrs.)
1
-
-
Electro Static Precipitator Water washing of ESP's Fields (Completition Period 08 Hrs.)
6
-
-
Servicing of HFO wagon unloading pump including inspection & replacement of mechanical seal, bearings, screw shafts etc. (Completition Period 48 Hrs.)
2
-
-
Servicing of LDO tanker unloading pump/ LDO & HFO transfer pump including inspection & replacement of mechanical seal, bearings, screw shafts etc. (Completition Period 48 Hrs.)
2
-
-
Replacement of cartridge of HFO / LDO pressurizing pump including replacement of mechanical seal, bearings, if required, including alignment and normalization. (Completition Period 24Hrs.)
2
-
-
Replacement of mechanical seals of HFO/LDO unloading pump/ transfer/pressurizing pump (Completition Period 12 Hrs.)
3
-
-
Removal and installation of 1- phase & 3-phase exhaust fan TG Hall up to 3.8 KW
40
-
-
Complete Servicing of service T/F’s
54
-
-
Removal, reinstallation and Repair of street lights.
60
-
-
Complete servicing of LP’s / valve DB ‘s including changing of gaskets, repairing of door locks, complete painting and marking etc.(material is in scope of contractor )
20
-
-
Laying testing and termination of control cables PVC/XLPE armored/unarmored overhead cables.All sizes upto 10 core above 2.5 mm2
500
-
-
Laying testing and termination of control cables PVC/XLPE armored/unarmored overhead cables.All sizes above 10 core above 2.5 mm2
500
-
-
Laying testing and termination of control cables PVC/XLPE armored/unarmored underground cables.All sizes upto 10 core above 2.5 mm2
500
-
-
Laying testing and termination of control cables PVC/XLPE armored/unarmored underground cables.All sizes above 10 core above 2.5 mm2
500
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored overhead cables.2C/3C/4C upto 25mm2
1000
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored overhead cables.25 to 150mm2
500
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored overhead cables.150 to 300mm2
500
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored underground cables.2C/3C/4C upto 25mm2
1000
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored underground cables.25 to 300mm2
500
-
-
Laying testing and termination of Power cables PVC/XLPE armored/unarmored underground cables. 150 to 300mm2
500
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements