Haryana Power Generation Corporation Limited Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 1,39,741Document Cost
₹ 1,180Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HBC_416562_1Tender No
20246885E6F2 6ABA 4308 923B 8DD8A20F1373713PGCTender Authority
Haryana Power Generation Corporation Limited ViewPurchaser Address
-Website
http://www.hpgcl.org.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Part-B (1st year) (1.2) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 20.1 kW to 50 kW
8
-
-
... More
Part-B (1st year) (1.3) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 50.1 kW to 100 kW
12
-
-
... More
Part-B (1st year) (1.4) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 100.1 kW to 170 kW
16
-
-
... More
Part-B (1st year) (2.1) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 500 kW
4
-
-
... More
Part-B (1st year) (2.2) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 501 kW to 1000 kW
2
-
-
... More
Part-B (1st year) (2.3) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 1001 kW to 2000 kW
4
-
-
... More
Part-B (1st year) (2.4) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2001 kW to 2400 kW
2
-
-
... More
Part-B (1st year) (2.5) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2401 kW to 4600 kW
2
-
-
... More
Part-B (1st year) (3.1) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 500 kW
4
-
-
... More
Part-B (1st year) (3.2) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 501 kW to 1000 kW
2
-
-
... More
Part-B (1st year) (3.3) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 1001 kW to 2000 kW
4
-
-
... More
Part-B (1st year) (3.4) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2001 kW to 2400 kW
2
-
-
... More
Part-B (1st year) (3.5) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2401 kW to 4600 kW
2
-
-
... More
Part-B (1st year) (4.1) Replacement of bearing (bearing can be of DE or NDE or Both) of HT motor up to 500 KW
4
-
-
... More
Part-B (1st year) (4.2) Replacement of bearing (bearing can be of DE or NDE or Both) up to 501 KW to 1000 KW.
2
-
-
... More
Part-B (1st year) (4.3) Replacement of bearing (bearing can be of DE or NDE or Both) up to 1001 kW to 2000 kW.
4
-
-
... More
Part-B (1st year) (4.4) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2001 kW to 2400 kW.
2
-
-
... More
Part-B (1st year) (4.5) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2401 kW to 4600 kW.
2
-
-
... More
Part-B (1st year) (5.1) Shifting, Installation and commissioning of service transformer (Oil/Dry Type) of capacity above 200kVA to 2500kVA, from one site to other site within Plant (both side)
6
-
-
... More
Part-B (1st year) (5.2) Shifting, Installation and commissioning of ESP, HVR transformer from one site to other site within Plant including lowering down to ground floor and loading up to the plinth of transformer. (Both side)
5
-
-
... More
Part-B (1st year) (6.1) Dehydration/ filtration of oil in Service transformer
8
-
-
... More
Part-B (1st year) (6.2) Dehydration/ filtration of oil in HVR Transformer
14
-
-
... More
Part-B (1st year) (7.a.1) Laying of underground control cables 2.5 Sq mm up to 10 Cores (depth Max upto 3 feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable.
300
-
-
... More
Part-B (1st year) (7.a.2) Laying of underground of control cables 2.5 Sq mm above 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable
300
-
-
... More
Part-B (1st year) (7.b.1) Laying of underground of power cables 2C/3C/4C up to size 25mm2
300
-
-
... More
Part-B (1st year) (7.b.2) Laying of underground of power cables 2C/3C/4C size 25.1mm2 to 70mm2
300
-
-
... More
Part-B (1st year) (7.b.3) Laying of underground of power cables 2C/3C/4C size 95.1mm2 to 150mm2
300
-
-
... More
Part-B (1st year) (7.b.4) Laying of underground of power cables 2C/3C/4C size 150.1mm2 to 240mm2
300
-
-
... More
Part-B (1st year) (7.b.5) Laying of underground of power cables 2C/3C/4C above size 240mm2
300
-
-
... More
Part-B (1st year) (8.1) Laying of power cables in cable trench/overhead 1C/2C/3C/4C size above 95 mm2 to 240mm2
800
-
-
... More
Part-B (1st year) (8.2) Laying of power cables in cable trench/overhead 1C/2C/3C/4C above size 240mm2
300
-
-
... More
Part-B (1st year) (9) Painting of all Electrical equipments i.e. Motors, transformers, panels, cable structure etc. on basis of per square mtr. Enamel paint and consumables of reputed make will be in the scope of the contractor.
2500
-
-
... More
Part-B (1st year) (10.1) Supply of man power Skilled - A (unit as Mandays)
300
-
-
... More
Part-B (1st year) (10.2) Supply of man power Semi-skilled - A (unit as Mandays)
300
-
-
... More
Part-B (2nd year) (1.1) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 5.6 kW to 20 kW
20
-
-
... More
Part-B (2nd year) (1.2) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 20.1 kW to 50 kW
8
-
-
... More
Part-B (2nd year) (1.3) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 50.1 kW to 100 kW
12
-
-
... More
Part-B (2nd year) (1.4) Opening of foundation bolts including removal and installation of motor end coupling and shifting of new as well as damaged LT motor (within plant) both sides (To and Fro) for 100.1 kW to 170 kW
16
-
-
... More
Part-B (2nd year) (2.1) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 500 kW
4
-
-
... More
Part-B (2nd year) (2.2) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 501 kW to 1000 kW
2
-
-
... More
Part-B (2nd year) (2.3) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 1001 kW to 2000 kW
4
-
-
... More
Part-B (2nd year) (2.4) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2001 kW to 2400 kW
2
-
-
... More
Part-B (2nd year) (2.5) Local shifting (with in plant) of HT motor both side and placing it on its foundation/proper position (both side) and all other related works (hydra and truck for shifting of motor shall be arranged by the contractor) up to 2401 kW to 4600 kW
2
-
-
... More
Part-B (2nd year) (3.1) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 500 kW
4
-
-
... More
Part-B (2nd year) (3.2) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 501 kW to 1000 kW
2
-
-
... More
Part-B (2nd year) (3.3) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 1001 kW to 2000 kW
4
-
-
... More
Part-B (2nd year) (3.4) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2001 kW to 2400 kW
2
-
-
... More
Part-B (2nd year) (3.5) Removal and fitting of Coupling on HT Motors( Half portion fitted on HT motor Shaft) up to 2401 kW to 4600 kW
2
-
-
... More
Part-B (2nd year) (4.1) Replacement of bearing (bearing can be of DE or NDE or Both) of HT motor up to 500 KW.
4
-
-
... More
Part-B (2nd year) (4.2) Replacement of bearing (bearing can be of DE or NDE or Both) up to 501 KW to 1000 KW.
2
-
-
... More
Part-B (2nd year) (4.3) Replacement of bearing (bearing can be of DE or NDE or Both) up to 1001 kW to 2000 kW.
4
-
-
... More
Part-B (2nd year) (4.4) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2001 kW to 2400 kW
2
-
-
... More
Part-B (2nd year) (4.5) Replacement of bearing (bearing can be of DE or NDE or Both) up to 2401 kW to 4600 kW
2
-
-
... More
Part-B (2nd year) (5.1) Shifting, Installation and commissioning of service transformer (Oil/Dry Type) of capacity above 200kVA to 2500kVA, from one site to other site within Plant (both side)
6
-
-
... More
Part-B (2nd year) (5.2) Shifting, Installation and commissioning of ESP, HVR transformer from one site to other site within Plant including lowering down to ground floor and loading up to the plinth of transformer. (Both side)
5
-
-
... More
Part-B (2nd year) (6.1) Dehydration/ filtration of oil in Service transformer
8
-
-
... More
Part-B (2nd year) (6.2) Dehydration/ filtration of oil in HVR Transformer
14
-
-
... More
Part-B (2nd year) (7.a.1) Laying of underground control cables 2.5 Sq mm up to 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable.
300
-
-
... More
Part-B (2nd year) (7.a.2) Laying of underground of control cables 2.5 Sq mm above 10 Cores (depth Max upto 3feet) including excavation, covering the cable with bricks and sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cable
300
-
-
... More
Part-B (2nd year) (7.b.1) Laying of underground of power cables 2C/3C/4C up to size 25mm2
300
-
-
... More
Part-B (2nd year) (7.b.2) Laying of underground of power cables 2C/3C/4C size 25.1mm2 to 70mm2
300
-
-
... More
Part-B (2nd year) (7.b.3) Laying of underground of power cables 2C/3C/4C size 95.1mm2 to 150mm2
300
-
-
... More
Part-B (2nd year) (7.b.4) Laying of underground of power cables 2C/3C/4C size 150.1mm2 to 240mm2
300
-
-
... More
Part-B (2nd year) (7.b.5) Laying of underground of power cables 2C/3C/4C above size 240mm2
300
-
-
... More
Part-B (2nd year) (8.1) Laying of power cables in cable trench/overhead 1C/2C/3C/4C size above 95 mm2 to 240mm2
800
-
-
... More
Part-B (2nd year) (8.2) Laying of power cables in cable trench/overhead 1C/2C/3C/4C above size 240mm2
300
-
-
... More
Part-B (2nd year) (9) Painting of all Electrical equipments i.e. Motors, transformers, panels, cable structure etc. on basis of per square mtr. Enamel paint and consumables of reputed make will be in the scope of the contractor.
2500
-
-
... More
Part-B (2nd year) (10.1) Supply of man power Skilled - A (unit as Mandays)
300
-
-
... More
Part-B (2nd year) (10.2) Supply of man power Semi-skilled - A (unit as Mandays)
300
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%