Gurugram Metropolitan Development Authority Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Gurugram Metropolitan Development Authority - GMDA Tender

Works
Civil And Construction
Energy, Oil and Gas
Civil Works Others
Eprocure
Opening Date15 Feb 2024
Closing Date1 Aug 2024
Tender Amount₹ 1,66,96,38,891 
Notes
Download

Costs

  • EMD

    ₹ 1,67,00,000
  • Document Cost

    ₹ 1,180
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Guarantee Energy Consumption for STP for Treatment Purpose. (Note: - Bidder is required to quote the Guaranteed Energy Consumption in kwh/MLD). The value quoted in Kwh/MLD will be multiplied with 365- Days x 11 Years X 7.35 - Power Unit Rate 100 - Flow,MLD) i.e., ( 365*11*7.35*100=2951025) to arrive total cost of guaranted energy consumption

2951025

-

-

... More
Land requirement for whole scope of work (Note: Bidder is required to quote the max. area of land in which whole scope of work can be accomodated. Land Cost, as per circle rate considered is INR 10,64,80,000.00 per acre. The maximum land quoted by bidder should not exceed 12 Acres.)

106480000

-

-

... More
Providing, laying, cutting, jointing, testing and commissioning of rising main of minimum 1200mm i/d DI K9 pipe including excavation for carrying pumped untreated effluent from MPS to STP and other allied works including OandM for 11years including 1 year DLP

300

-

-

... More
Providing lowering, cutting, jointing, testing and commissioning of 2000mm i/d RCC NP3 pipe with 2.5mm thick HDPE lining alongwith construction of manholes, dewatering and dismantling of existing road, if any and its reconstruction including OandM for 11years including 1 year DLP

150

-

-

... More
Design, construction of internal approach road of 4 mtr width with cement concrete M-30 Grade 250mm thickness over a base of 150mm thick wet mix macadam over 150mm granular sub base layer according to Morth Specification including OandM for 11 years including 1 year DLP

1200

-

-

... More
Design and Construction of CC pavement of minimum 2 mtr width to connect all units to internal roads with 100mm thickness PCC 1:1.5:3 over 100mm thick 1:3:6 alongwith provision of kerbs and channel with suitable opening of disposal of storm water runoff in front of buildings and electrical panel rooms including OandM of 11 years including 1 year DLP

800

-

-

... More
Design and Construction of storm water drain including OandM of 11 years including 1 year DLP

2000

-

-

... More
Landscaping and horticulture including OandM for 11 years including 1 year DLP

4000

-

-

... More
Supply and fixing of signages as per norms including OandM for 11 Years.

300

-

-

... More
Provision of Polyelectrolyte as per actual consumption.

336600

-

-

... More
Provision of Alum as per actual consumption

3136320

-

-

... More
Provision of Lime as per actual consumption

3298680

-

-

... More
Provision of Chlorine as per actual consumption.

1995840

-

-

... More
Provision of DWPE as per actual consumption

186120

-

-

... More
Note: 1. The bidder has to quote item 1 and item 3 in INR on Lump Sum basis exclusive of GST. 2. Bidder has to quote item no. 6 to 17 in INR on unit rate basis. The price quoted from Item No.6 to Item No. 17 will be paid as per actual work done/ consumption. The quoted rate shall be exclusive of GST. 3. For item 2, the bidder has to quote the guaranteed power consumption for the MPS in kwh for each MLD of raw water pumped (inclusive of power consumption for Pumping and associated infrastructure) and should abide to it during operation, any increase in power consumption during operation shall result in penalization and recovery beyond guaranteed power consumption from the running bills as per the clause 3.5.3 of PART -3 : Payment Schedule of Vol-IV of this bid document. No claim/relaxation on account of increase in power consumption due to any reason will be entertained by GMDA 4. For item 4, the bidder has to quote the guaranteed power consumption for treatment to achieve the desired result and should abide to it during operation, any increase in power consumption during operation shall result in penalization and recovery beyond guaranteed power consumption from the running bills as per the clause 3.5.3 of PART -3 : Payment Schedule of Vol-IV of this bid document. No claim/relaxation on account of increase in power consumption due to any reason will be entertained by GMDA 5. The item 5 of BoQ to be quoted by bidder (in acres) as the maximum land requirement for whole scope of work i.e. MPS, STP, CBG Plant and any other associated infrastructure. In case bidder consume more land than quoted during construction, the same shall result in penalisation & recovery beyond guaranted maximum land use quoted by bidder.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.