Gurugram Metropolitan Development Authority Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 59,54,340Document Cost
₹ 1,180Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRY_378950_1Bid Award Id
ViewTender No
20247C26A3C9 6A30 42DF BA8D E2C835C00B53720001Tender Authority
Gurugram Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://haryana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications updated
519750
-
-
... More
Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORTandH specifications
12993.75
-
-
... More
Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications updated
10395
-
-
... More
`Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /
base course on well prepared surface and compacting with vibratory roller to achieve the
desired density as per technical clause 406 of MORTandH specifications
8859.38
-
-
... More
Credit of kerbstone (70% of total length) (the amount computed by the rates quoted against recovery itmes will not be included in the total amount rather it will be deducted while calculating financial statement of the agency, kerbstones obtained from dismantling of existing median, islands has been calculated taking assumption that 70% of existing kerbstone will be retreived and can be reused. The reserve rates are minimum rates to be used as base for quoting purchase rate by he agency. No rates below reserve price will be considered for all purpose, in case the agency quotes lesser than reserve price, the price quited against the recovery of existing kerbstones shall have minimum reserve price of Rs. 1988/- per cum).
555.66
-
-
... More
Recovery Item- Credit of unusable material received from Milling of BC i.e. 70% of obtained material. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road. However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / milling and if material after milling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price. The price qouted against the recovery material shall have minimum reserve price of 1533.51/- per cum).
330.75
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements