Forest Department Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Forest Department - GoH Tender

Works
Civil And Construction
Eprocure
Opening Date14 Jan 2021
Closing Date20 Jan 2021
Tender Amount₹ 2,08,800 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 4,180
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
D.P.C. 40 mm thick on walls cement conc. 1:2:4 using 20 mm nominal size stone aggregate with 20 coats of not bitumen 1.65/-kg Per Sqm.

3.37

649

35.05

... More
First class brick work laid in cement stone dust mortar1 :5 in first story upto 4 Mtr. Above plinth level

8.06

26268

434.55

... More
Cement Conc. 1:2:4 with stone aggregate 20 mm nominal size for R.C.C. work for walls

0.36

1289

551.2

... More
Cement Conc. 1:2:4 with stone aggregate 20 mm nominal size for R.C.C. work for slab

1.87

5436

447.25

... More
Providing and fixing vitrified tiles of size 600X600 mm of approved make in flooring laid in any pattern as specified over base of 20mm thick cement coarse sand martar 1:3 and jointed with white cement slurry mixed with pigment to match the shade to tiles.

9.51

7471

924.3

... More
Providing and fixing vitrified tiles of size 600X600 mm of approved make in skirting/dadao laid in any pattern as specified over base of 12mm thick cement coarse sand martar 1:3 and jointed with white cement slurry mixed with pigment to match the shade to tiles.

24.29

19197

929.8

... More
Base course floor 100 mm thick

-

-

-

... More
thick 1:8:16 brick ballast

9.51

2459

36.95

... More
12 mm thick cement plaster 1:5 on walls

102.78

7153

11.6

... More
Khaprail tiles fitting and fixing on steel truss.

15.57

37368

400

... More
Cold twisted deformed bar for R.C.C. works, where not included in the comp. rate of R.C.C. including bending & placing in position comp.

2.3

13709

917.05

... More
Wrought Iron and mild steel grill frame door and window complete fixed in position

0.94

6329

1040.35

... More
Finishing wall with exteriaor decorative cement based paints such as snow cem on new work

51.58

1308

7.25

... More
Distempering with wash able oil bound distemper two coats on new work.

51.2

1630

9.1

... More
Applying priming coat and two coats painting door and window comp ara with roof

12

392

9.35

... More
Toal

-

153721

-

... More
Add 20% Electricity, water supply & Sewer charges

-

30744

-

... More
Total

-

184465

-

... More
Add 3 % Contingency

-

5534

-

... More
Total

-

189999

-

... More
Add 10% Contractor profit

-

19000

-

... More
Total

-

208999

-

... More
Or Say

-

209000

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.