Faridabad Metropolitan Development Authority Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 1,29,140Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HRY_257610_1Bid Award Id
ViewTender No
2023B171BEEF 2485 4C31 96F8 C65F611558791851002Tender Authority
Faridabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://etenders.hry.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Pipe drain Size Dia. 900mm (Node F-I and Node:-W1(Gimkhana Club) to Node:- W)
The charges for removing of blockage plugging pipe, diversion through pumping,desilting and cleaning of RCC chocked master storm water drain line with high pressure jetting and high volume super sucker machine, opening of blocked storm water line , manholes, disposal of retained silt/malba to hazard free dumping ground at suitable location and disconnection of sewer inlets from drainage system. The work shall include mobilization of equipments, cost of sundries, T and P and safety devices, dewatering, cleaning and required plugging of manholes inluding cartage, loading and unloading of silt/sludge from the site, insurance of employee and labours and all over head charges etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. The payment will be released only after submission of all the record such as desilting of drain by CCTV Camera recording and satisfactory report of third party inspection team. (250 plus 272 = 522m)
522
-
-
Pipe drain Size Dia.1275mm (Node J-Sec-12 and 15 Dividing Road The charges for removing of blockage plugging pipe, diversion through pumping,desilting and cleaning of RCC chocked master storm water drain line with high pressure jetting and high volume super sucker machine, opening of blocked storm water line , manholes, disposal of retained silt/malba to hazard free dumping ground at suitable location and disconnection of sewer inlets from drainage system. The work shall include mobilization of equipments, cost of sundries, T and P and safety devices, dewatering, cleaning and required plugging of manholes inluding cartage, loading and unloading of silt/sludge from the site, insurance of employee and labours and all over head charges etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. The payment will be released only after submission of all the record such as desilting of drain by CCTV Camera recording and satisfactory report of third party inspection team.
540
-
-
Pipe drain Size Dia. 450mm (Node A-B)
The charges for removing of blockage plugging pipe, diversion through pumping,desilting and cleaning of RCC chocked master storm water drain line with high pressure jetting and high volume super sucker machine, opening of blocked storm water line , manholes, disposal of retained silt/malba to hazard free dumping ground at suitable location and disconnection of sewer inlets from drainage system. The work shall include mobilization of equipments, cost of sundries, T and P and safety devices, dewatering, cleaning and required plugging of manholes inluding cartage, loading and unloading of silt/sludge from the site, insurance of employee and labours and all over head charges etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. The payment will be released only after submission of all the record such as desilting of drain by CCTV Camera recording and satisfactory report of third party inspection team.
145
-
-
Pipe drain Size Dia.1000mm (Node I-J and Node:-W(Session Judje House) to Node:-J)
The charges for removing of blockage plugging pipe, diversion through pumping,desilting and cleaning of RCC chocked master storm water drain line with high pressure jetting and high volume super sucker machine, opening of blocked storm water line , manholes, disposal of retained silt/malba to hazard free dumping ground at suitable location and disconnection of sewer inlets from drainage system. The work shall include mobilization of equipments, cost of sundries, T and P and safety devices, dewatering, cleaning and required plugging of manholes inluding cartage, loading and unloading of silt/sludge from the site, insurance of employee and labours and all over head charges etc. complete as per direction and to the entire satisfaction of Engineer-in-Charge. The payment will be released only after submission of all the record such as desilting of drain by CCTV Camera recording and satisfactory report of third party inspection team. (560 plus 100 = 660m)
660
-
-
Providing CCTV survey by Pan Tilt Camera with Zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of Engineer-in-Charge. (Only for Desilting of drainage)
2257
-
-
Searching of manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engioneer-in-charge. (Only for Desilting of drainage)
50
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements