Faridabad Metropolitan Development Authority Tender

If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Faridabad Metropolitan Development Authority - FMDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date14 Oct 2022
Closing Date16 Nov 2022
Tender Amount₹ 3,28,16,134 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
[11.7.1]20 mm cement plaster of mix : 1. 1:4 (1 cement: 4 fine sand) Through Rate

66.57

-

-

... More
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. Labour Rate

3500

-

-

... More
[11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. Through Rate

2385.39

-

-

... More
[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications Through Rate

212.64

-

-

... More
[17.20.2]Making 50 mm x 50 mm Furrows Making 50 mm x 50 mm furrows, 45 degree to the centre line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead as per technical clause 404 of MORT&H specifications 2. 50mm deep furrow cutting Through Rate

4425

-

-

... More
[17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications Through Rate

4545

-

-

... More
[17.37]Mastic Asphalt Providing and laying 25 mm/ 50 mm thick mastic asphalt wearing course with paving grade bitumen 85/25 or VG - 30/40 @ 10.2%, fine aggregates, course aggregates, lime filler @ 17.92% of total, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping at an approximate spacing of 10 cm centre to centre in both directions, pressed into surface when the temperature of surfaces is not less than 100C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 of MORT&H specifications (5th Revision, 2013) Through Rate

4545

-

-

... More
[17.69.3]Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. Through Rate

544

-

-

... More
[2.B0485] B0485. Epoxy paint Rate

1018

-

-

... More
[27.42.1]RCC Railing 1. Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion including reinforcement complete as per approved standard of MORT&H vide drawing no. SD/202 and MoRT&H specifications. 2703, 1500,1600 & 1700. Material Rate

930

-

-

... More
[27.42.2]RCC Railing 2. Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion including reinforcement complete as per approved standard plans of MORT&H vide drawing no. SD/202 and MoRT&H specifications.2703, 1500,1600 & 1700. Through Rate

160

-

-

... More
[27.44.2]Drainage Spouts complete as per drawing no. SD/205 and MoRTandH MoRTandH specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) 2. For fixing in position Through Rate

20

-

-

... More
[27.49]Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm and MORT&H specification 800. Through Rate

9928.4

-

-

... More
[27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. Through Rate

1279

-

-

... More
[28.16]Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken up to 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately). For the purpose of measurement the entire treated surface will be measured. Through Rate

873.5

-

-

... More
[3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. Rate

282.2

-

-

... More
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth 5km

163.2

-

-

... More
[31.14.2]Rebarring work with 10ml inject able mortar epoxy adhesive (Hybrid Urethane Methacrylate adhesive) or chemical compound of make as approved by Engineer-in-Charge complete in all respect including drilling and cost of all materials 0 0 0 2. 10 mm dia (hole size 14 mm.& hole depth up to 100 mm) 0 0 Through Rate

1000

-

-

... More
[31.14.3]Rebarring work with 10ml inject able mortar epoxy adhesive (Hybrid Urethane Methacrylate adhesive) or chemical compound of make as approved by Engineer-in-Charge complete in all respect including drilling and cost of all materials 0 0 0 3. 12mm dia (hole size 16mm.& hole depth up to 120 mm) 0 0 Through Rate

2000

-

-

... More
[31.9]Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. Through Rate

528

-

-

... More
[34.1.1]Cast in Situ Cement Concrete M20 Kerb Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer Through Rate

303

-

-

... More
[34.26]Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Through Rate

1218.02

-

-

... More
[34.34]Moulded Shank Road Stud Supplying and fixing of single mould twin shank reflective road studs made out of poly carbonate/ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values @ ASTM E 809 & ASTM D 4280. The detailed specifications and the product shall conform to ASTM D4280 and ASTM E 809. The raised pavement marker shall also meet all the testing conditions of ASTM D4280 like abrasion resistance and fixed to the road surface using the epoxy adhesive. Two cylinderical polymer shanks of not less than 20 mm diameter and not less than 30 mm length shall be moulded in the RPM body. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280. The marker shall withstand flexural strength of 909 kgf force in accordance with ASTM D4280. Marker lenses shall be moulded of Polycarbonate or methyl Methacrylate conforming to ASTM D788. The supplier shall provide a 2 years warranty for satisfactory field performance as per clause 804.7.3 of MORT&H 5th revision specifications. Through Rate

1211

-

-

... More
[34.36]Solar RPM/ Stud Providing and installation of solar cat eye produced from an engineered polymer selected for superior impact resistance and weather-ability. The top of the solar stud should be transparent for solar charging and light output in active mode. The base of the body shall be yellow or neutral white as approved by Engineer In-charge. The marker shall incorporate a solar panel (comprising of solar cells) for converting solar energy into electricity, a storage device for storing the energy, LEDs for illumination and a design for providing 360 degree smooth illumination. The Solar stud shall be round in shape for providing illumination in all directions. The solar stud shall also have high reflective polycarbonate/ methyl methecrylate lenses for conspicuity in passive mode and dual shanks for improved road presence. The solar studs are intended for application directly onto pavement surfaces and shall be applied with epoxy resin adhesives designed for use with raised pavement markers and as supplied by the marker manufacturer separately. The solar cat eye shall be of height: 65 ± 2 mm & Maximum Diameter: 136 ± 5 mm. The body of the solar cat eye shall be resistant to dust and water ingress as per IP 65 standards. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280. Through Rate

122

-

-

... More
[34.37]Road Delineators Providing and fixing of standard Metal Delineator as per IRC 79:2019 consisting of retro reflective area in white colour using Microprismatic retro reflective sheeting on each side conforming with IRC 67-2012 and meeting the coefficient of retro reflection values as per Class C table specification. The delineator shall be painted with only black colour powder coat of minimum 40 microns thickness, on top of retro reflective sheeting only in white colour shall be pasted on both sides. The structure shall have height not less than 800 mm above ground, width not less than 100 mm and shall extend not more than 300 mm below ground while being installed. The delineator shall have grooves across the length to make the reflective sheet vandal proof. The delineator is meant for application on gaps in median, traffic islands, dangerous bends, roundabouts, narrow bridges etc or as desired by site engineer. The product shall be provided with 3 year outdoor warranty report tested in India condition as per IRC 67: 2012 requirement. In case of soft ground, a proper foundation may be provided as per approved design. In case foundation is required to be provided, the items of excavation and foundation concrete are required to be measured and paid separately. Through Rate

338

-

-

... More
[35.15]Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concert laid over 12 mm thick mastic asphalt including disposal with all lift and lead up to 1000 m. Through Rate

13620

-

-

... More
[35.16]Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification Through Rate

180

-

-

... More
[35.17]Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Through Rate

2000

-

-

... More
[35.20]Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Through Rate

250

-

-

... More
[35.21]Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification Through Rate

480

-

-

... More
[35.24]Epoxy bonding of new concrete to old concrete Through Rate

2020.75

-

-

... More
[35.31]Replacement of Damaged Concrete Railing - Dismantling cost The rate for the provision of new railing may be adopted from the chapter on superstructure. Through Rate

1090

-

-

... More
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate

163.2

-

-

... More
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) Through Rate

141.3

-

-

... More
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar Through Rate

32.09

-

-

... More
[6.22.2.3]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.3. All works up to Plinth Level : M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) Through Rate

136.65

-

-

... More
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 3. Cold twisted bars Through Rate

800

-

-

... More
[6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). Through Rate

171.23

-

-

... More
[6.42]Precasting and placing in position 125 mm dia Bollards 600 mm high of required shape including providing M.S. Pipe Sleeve 50 mm dia 300 mm long in the Bollard and M.S. Pipes 40 mm dia and 450mm long with 150x150x6mm M.S. plate welded at bottom and embedded 150mm in cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size), including necessary excavation of size 250x250x450mm deep for the same in bitumen/concrete pavement at specified spacing. Through Rate

100

-

-

... More
[8.31]Providing and fixing facing extruded clay Tile (Glass Reinforced Clay Tiles (GRC)) any size any shade and design on wall with under layer of 12 mm thick cement plaster 1:3 and jointed with neat cement matched with pigment complete as per drawings, specifications and to the entire satisfaction of engineer- in- charge. Through Rate

2798

-

-

... More
General cleaning of drainage spouts complete including sealing with approved water proofing material area around the spout with al lifts and leads complete as per drawing and as per MORTandH Technical specifications 2705 and extending with 6 mt long GI 100 mm dia drainage discharge Gl light grade pipe

151

-

-

... More
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications

9075

-

-

... More
Providing and fixing perforated slabs (1600 x 600 x 150 mm).

175

-

-

... More
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen 85/25 or VG - 30/40 @ 10.2%, fine aggregates, course aggregates, lime filler @ 17.92% of total, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping at an approximate spacing of 10 cm centre to centre in both directions, pressed into surface when the temperature of surfaces is not less than 100C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 of MORTandH specifications (5th Revision, 2013).

4650

-

-

... More
Providing and laying 30 - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications

177

-

-

... More
Removal of defective concrete from pier column, cleaning the surface thoroughly, Exposing the reinforcement, applying anti corrosive paints, Putting additional reinforcement for Jacketing, centering, shuttering complete as per drawing and direction of engineer-In charge, putting temporary support to structure etc, applying the Jacketing polymer concrete or similar suitable mixture complete by mechanical means complete

228

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.