Directorate Of Urban Local Bodies Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 16,000Document Cost
₹ 1,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HRY_202290_1Bid Award Id
ViewTender No
MCG/EEH2/2021/43148Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://https://ulbharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering lead up to 50m and lift upto 1.5m. New HSR 2021 = HSR No.- 4.32)
136
-
1
... More
Disposal (by mechanical transport) Of Surplus material including loading, unloading etc. complete up to a lead of 2Km
- Earth by Mechanical Means (New HSR 2021 = HSR No.- 3.1.2)
120
-
1
... More
(HSR 6.22) = Providing and laying in position ready mixed plain cement concrete with cement content as per approved design mix and manufactured in fully automatic baching plant and transported to site of work in transit mixer for all leads,having continuous agitated of specified grade for plian cement concrete work,including pumping of RMC from transit mixer to site of laying and curing,excluding the cost of centering,shuttering and finishing,including cost of curing,admixtures in recommended proportions as per IS:9103 to accelerate/retard setting of concrete,improve workability without impairing strenght and durability as per direction of the Engineer-in Charge:
(HSR 6.22.1.2) = M-15 grade plain cement concrete (cement content considered @ 240Kg/cum) (HSR 2021 = HSR No.- 6.22.1.2)
8.4
-
1
... More
HSR 6.29.1 = Foundations, footings, bases of columns etc. for mass concrete. (HSR 2021 = HSR No.- 6.29.1)
2.16
-
1
... More
Suspended floors, roofs, landings, balconies and access platform. (NEW HSR 2021= HSR No.- 6.30.3)
46.12
-
1
... More
All work from plinth level upto floor V level (NEW HSR 2021= HSR No.- 6.25.2)
7
-
1
... More
Providing M-30 grade R.C.C instead of M-25grade R.C.C(note:cement content considered in M-30 is @340 kg/cum) (NEW HSR 2021= HSR No.- 6.26.1)
7
-
1
... More
Thermo mechanically treated bars (NEW HSR 2021= HSR No.- 6.33.6)
840
-
1
... More
Cement mortar 1:6 (1 cement: 6 coarse sand) (NEW HSR 2021= HSR No.- 7.20.2)
54
-
1
... More
Boulder (50mm to 200mm) (NEW HSR 2021= HSR No.- 23.5)
12
-
1
... More
Gravel (5 mm to 10 mm) (NEW HSR 2021= HSR No.- 23.6)
14.08
-
1
... More
Coarse Sand (exclusive of overhead and carriage etc) (NEW HSR 2021= HSR No.- Chapt.-2, B0036)
12
-
1
... More
Boring/drilling bore well of require dia far casing/ strainer pipe,
by suitable method prescribed in IS.2800 (part I), including
collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, up to 90 metre depth below ground level, (NEW HSR 2021= HSR No.- 33.6.1.1)
240
-
1
... More
Providing and fixing bail plug /bottom plug for 150mm dia to the bottom of the pipe assembly of tube well as per 15:2600 (part I) (NEW HSR 2021= HSR No.- 33.18)
4
-
1
... More
Supplying, assembling, lowering and fixing in vertical position inbore well, Unplasticised PVC medium well casing (CM) pipe of 150mm dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc_ all complete. for all depths, as per direction of Engineer -in-charge. (NEW HSR 2021= HSR No.- 33.8.2)
84
-
1
... More
Supplying, assembling, lowering and fixing in vertical position in bore well Unplasticised PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire &labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. (NEW HSR 2021= HSR No.- 33.9.2)
36
-
1
... More
Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe. removable as per requirement, all complete for bore well of:150mm dia. (NEW HSR 2021= HSR No.- 33.16)
4
-
1
... More
Providing and fixing M.S. clamp of 150 mm dia to the top of
casing/ housing pipe of tube well as per IS: 2600 (part I), including necessary bolts & nuts of required size complete.
including necessary bolts nuts, washers etc all complete (NEW HSR 2021= HSR No.- 33.17)
4
-
1
... More
Gravel packing in anular space around tube well assembly in accordance with IS-.4097, providing fine grade gravel (2- 5mm) to the full depth of the bore and also during development all complete as per direction of Engineer-in-charge. (NEW HSR 2021= HSR No.- 33.15)
20
-
1
... More
Development of tube well in accordance with IS : 2800-
1991 (part I) and IS: 11189-1985 , to establish maximum
rate of usable water yield without sand content (beyond
permissible limit), with required capacity air compressor,
running the compressor for required time(here it shall be 15 hrs ) till well is fully developed, measuring yield of well by 'Y' notch
method or any other approved method, measuring static
level & draw down etc. by step draw down method,
collecting water samples & getting tested in approved
laboratory, i/c
disinfection of tube well, all complete, including hire
&labour
charges of air compressor, tools & accessories etc., all as
per requirement and direction of Engineer-in-charge.
(NEW HSR 2021= HSR No.- 33.19)
80
-
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements