Directorate Of Urban Local Bodies Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 46,220Document Cost
₹ 1,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRY_421672_1Tender No
2025EAE6199D D53C 48A0 8623 466EBC2A6CBA295ULBTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://https://ulbharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
HSR Item 3.1.2-By Mechanical Transport including loading, unloading and stacking 2. Earth
HSR Rate(Rs.) 93.00 5km
205.88
93
19146.38
... More
HSR Item 17.5.3-Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications
HSR Rate(Rs.) 8.00 Through Rate
2470.5
8
19764
... More
HSR Item 17.69.3-Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect.
HSR Rate(Rs.) 589.00 Through Rate
2470.5
589
1455124.5
... More
HSR Item 17.15.2-Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 2. Grading II material
HSR Rate(Rs.) 1169.00 Through Rate
370.58
1169
433202.18
... More
HSR Item 26.4.1-SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed
HSR Rate(Rs.) 291.00 Through Rate
332.61
291
96788.35
... More
HSR Item 6.1.1-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 4451.00 Through Rate
15.39
4451
68500.89
... More
HSR Item 13.27-Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
HSR Rate(Rs.) 80.00 Through Rate
200
80
16000
... More
HSR Item 5.53.1-Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 1. up to 600 mm dia
HSR Rate(Rs.) 95.00 Through Rate
50
95
4750
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%