Directorate Of Urban Local Bodies Tender

... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Directorate Of Urban Local Bodies - DULB Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date29 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 24,60,759 
Notes
Download

Costs

  • EMD

    ₹ 49,980
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
HSR Item 21.53-Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar HSR Rate(Rs.) 160.00 Through Rate

210

160

33600

... More
HSR Item 21.55-Constructing standard drain type II drain complete consisting of concrete drain moulded and laid concrete foundation, rendered and smooth with 6mm thick rendering concrete to be of I :3:6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar HSR Rate(Rs.) 427.00 Through Rate

70

427

29890

... More
HSR Item 7.21.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) HSR Rate(Rs.) 3968.00 Through Rate

53.61

3968

212724.48

... More
HSR Item 17.69.2-Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. HSR Rate(Rs.) 655.00 Through Rate

1260

655

825300

... More
HSR Item 17.70-Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. HSR Rate(Rs.) 26.00 Through Rate

1680

26

43680

... More
HSR Item 17.6-Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. HSR Rate(Rs.) 184.00 Through Rate

756

184

139104

... More
HSR Item 13.28-Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. HSR Rate(Rs.) 75.00 Through Rate

700

75

52500

... More
HSR Item 3.1.18-By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. HSR Rate(Rs.) 202.00 Rate

179.4

202

36238.8

... More
HSR Item 10.7-Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 HSR Rate(Rs.) 216.00 Through Rate

96.6

216

20865.6

... More
HSR Item 6.14.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 3875.00 Through Rate

69.58

3875

269622.5

... More
HSR Item 5.23.2-Demolishing cement concrete manually/ bymechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) HSR Rate(Rs.) 1149.00 Through Rate

179.4

1149

206130.6

... More
HSR Item 6.33.3-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars HSR Rate(Rs.) 68.00 Through Rate

3500

68

238000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.