Directorate Of Urban Local Bodies Tender
... More
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 25,273Document Cost
₹ 1,000Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRY_427756_1Bid Award Id
ViewTender No
2025706D6296 E1FA 4E57 A4ED 4F863BF4DFF7313ULBTender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://https://ulbharyana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
72
68
4896
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
427.68
71
30365.28
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
221.76
138
30602.88
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
445.97
22
9811.34
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
445.97
54
24082.38
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
269
374
100606
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
123.52
364
44961.28
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
4
147
588
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
10
2027
20270
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
6000
7
42000
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
12
7319
87828
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
13
2844
36972
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
60
235
14100
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
25
268
6700
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
37
687
25419
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
10
2195
21950
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
78.91
83
6549.53
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
2.4
5969
14325.6
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
2.75
6113
16810.75
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
10.8
6149
66409.2
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
10.69
2199
23507.31
... More
[26.4.1]SITE CLEARANCE 1. Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50m and lift up to 1.5 m, disposed material to be neatly dressed [Through Rate]
1500
68
102000
... More
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
16.43
4128
67831.26
... More
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
39.23
4403
172746.95
... More
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
72
488
35136
... More
[9.57.3]Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 3. 150 mm diameter [Through Rate]
48.72
269
13105.68
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements