If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.

Central Ground Water Board - CGWB Tender

Goods
Consultancy Services
Eprocure
Opening Date7 Jul 2021
Closing Date12 Aug 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Dwlr Installation And Supply Of Data 600 Nos. For West Zone

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply, Installation and commissioning of DWLRs and data supply from 600 observation wells.
BOQ for Supply, Installation and commissioning of DWLRs and data supply from 600 observation wells.
TENDER DOCUMENT for Supply, Installation and commissioning of DWLRs and data supply from 600 observation wells.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
IT hardware which includes required static, IP, router, switch, firewall system & A3 size color printer. Delivery Date: 3 months from the date of signing of contract.

1

-

-

... More
42" LED Display system as per technical specifications. Delivery Date: 3 months from date of signing of contract.

1

-

-

... More
High Speed Interned Connection (minimum 8 mbps upload and 8 mbps download) for five years. Delivery Date: 3 months from the date of signing of contract.

1

-

-

... More
GSM & GPRS data receiving system with all ancillary equipment as per technical specifications. Delivery Date: 3 months from date of signing of contract.

1

-

-

... More
Installation, Testing and Commissioning of Digital Water Level Recorders (DWLRs) (in the presence of CWGB) with non-vented hydrostatic pressure type sensor and barometric pressure correction for individual station with desired measurement range and standard sensor cable along with junction boxes and 5 meter signal cable to be installed at depth as per list and necessary accessories with battery operated data logger and telemetry System based on GSM & GPRS as per the technical specifications to be installed at designated locations as per list. Note: For Validation of data, Physical measurement shall be cross checked with the data generate from DWLR. Timeline: 9 months from the date of signing of contract.

600

-

-

... More
Installation, Testing and Commissioning of Server along with monitor, Computer node (Workstation) and 3 KVA online UPS as per technical specifications . Timeline: 4 months from the date of signing of contract.

1

-

-

... More
Installation, testing & commissioning of IT hardware which includes required static IP, router, switch, firewall system & A3 Size Color Printer. Timeline: 4 months from the date of signing of contract.

1

-

-

... More
Installation, testing & commissioning of 42" LED Display system as per technical specifications. Timeline: 4 months from the date of signing of contract.

1

-

-

... More
Installation, testing & commissioning & charges of High Speed Internet Connection (minimum 8 mpbs upload and 8 mbps download) for 5 years. Timeline: 4 months from the date of signing of contract.

1

-

-

... More
Installation, testing & commissioning GSM & GPRS data receiving system with all ancillary equipment as per technical specifications. Timeline: 6 months from date of signing of contract.

1

-

-

... More
Five Years Operation & Maintenance and Comprehensive Warranty for DWLRs with Telemetry system along with accessories, installed at designated locations and Data Centre equipment as specified in schedule of requirement after final acceptance and upgradation of all software associated with DWLR systems. This includes replacement of batteries as & when required, replacement of spares/parts/equipments/consumables, periodic inspections, repairing/service charges, the cost of Communication using GSM & GPRS SIM and other related charges. Minimum One Service Engineer shall be placed at National Data Center & one in each Region for Operation of DWLR system with Telemetry. Note: Continuous activity for five years after successful commissioning and final acceptance certificate of DWLR

600

-

-

... More
Comprehensive AMC for 600 DWLR with telemetry System along with all accessories, installed at designated locations and Data Center equipments as specified in schedule of requirement after 5 years warranty period. This includes the replacement of batteries as and when required, replacement after 5 years warranty period. This includes the replacement of batteries as and when required, replacement of spares/parts/equipments/consumables, periodic inspections, repairing/service charges, the cost of communication using GSM & GPRS, SIM and High Speed Internet charges and other related charges. Note: Continuous activity for One year after five years O&M and warranty period i.e., 1st year of AMC

600

-

-

... More
Comprehensive AMC for 600 DWLR with telemetry System along with all accessories, installed at designated locations and Data Center equipments as specified in schedule of requirement after 5 years warranty period. This includes the replacement of batteries as and when required, replacement after 5 years warranty period. This includes the replacement of batteries as and when required, replacement of spares/parts/equipments/consumables, periodic inspections, repairing/service charges, the cost of communication using GSM & GPRS, SIM and High Speed Internet charges and other related charges. Note: Continuous activity for One year after five years O&M and warranty period and 1 year i.e., 2nd year of AMC

600

-

-

... More
Training of the purchaser's personnel at the supplier's Plant and/or/onsite in assembly, startup, operation, maintenance and/or repair of DWLR with telemetry and relevant software and supplied goods. Course topics will include sensor calibration, data logger configuration, data downloading, data retrieval, collection, Trouble shooting, processing maintenance requirements and procedure for equipment configuration, installation, site testing and commissioning including training kit containing course material in soft and hard copies as per technical specification. Note: Continuous activity as per table in Schedule of Requirement.

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.