Central Ground Water Board Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 1,32,68,580Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CGWB_743836_3Bid Award Id
ViewTender No
NIET No. 10/2022-23/MMS-ITender Authority
Central Ground Water Board ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
CONSTRUCTION OF PIEZOMETERS 1004 NOS IN SOFT ROCK/ HARD ROCK AND SUPPLY, INSTALLATION, COMMISSIONING OF DWLRS AND TELEMETRY, ESTABLISHMENT OF DATA ACQUISITION SYSTEM and ITS MAINTENANCE FOR REAL TIME GROUND WATER LEVEL MONITORING
BOQ Items
... More
Using 250 mm (10') RR Bit for 100 mm(4”) assembly pipe (for 50m depth Pzs)
1870
-
-
... More
Supply and Installation of ERW casing pipe conforming to Table 3 of latest version of IS: 4270-2001 of diameter and thickness given below
-
-
-
... More
100mm (4”) Nominal Bore thickness 5.4mm
1122
-
-
... More
Supply and installation of LCG V- wire screen conforming to latest version of IS: 8110-2000 of dimension given below
-
-
-
... More
100mm (4”) Normal Size thickness 7mm with slot opening size 1.0 mm
612
-
-
... More
Supply and shrouding 01 pea gravel confirming to Latest version of IS: 4097-1967
-
-
-
... More
Particle size range 2.00 mm to 4.5 mm for 1.0 mm and 0.75 mm slot opening
67
-
-
... More
Chemical analysis of water samples for 15 parameters pH, EC, TH, TDS, Ca, Mg, Na, K, CO3, HCO3, SO4, NO3, Cl, F & Fe in NABL accredited labs and submission of reports
34
-
-
... More
chemical analysis of water samples for Heavy metals _Arsenic & Uranium in NABL accredited labs and submission of reports
34
-
-
... More
Deployments by Air Compressor of adequate capacity for minimum 5 hours till discharge water is clear and free of sand including collection of water samples from PZ. Collection of Water samples asper prescribed format mentioned below.
34
-
-
... More
Construction of Cement concrete platform 0.7*0.7*0.6 m (0.3 m above ground level) using concrete mix of 1:2:4 around the pipe welded minimum 6 ns of anchoring plate asper drawing
34
-
-
... More
Supply and installation of display board asper drawing
34
-
-
... More
Supply and installation of protection box along with brass lock (7lever hardened) and three keys for each lock asper drawing
34
-
-
... More
Preparation and submission of basic data report per site in triplicate along with logging graphs, data sheets, analysis sheet,logging graphs , chemical analysis report from NABL lab, site location map and approachability with land marks, photographs and videos of activities of drilling, assembly lowering, gravel measurement and gravel packing, well development using compressor and well water discharge, water sample collection during compressor development, well discharge with discharge measurement via V-Notch, well site with display board well cap, protection box activity for each Pz site, etc.The soft copy should be submitted.Summary of wells details in xls format (as per proforma given by CGWB) including details of dia and depth housing pipe, assembly pipe, screen pipe, static water level, TDS, aquifer parameters, safe discharge,gravel packing depth and thickness, Litholog etc should be also submitted.
34
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements