Bharat Sanchar Nigam Limited Tender
If you want to inquire about any e-tender the Haryana government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Haryana tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Haryana etender you're looking for. Read further to learn how to search and bid for etender Haryana.
Costs
EMD
₹ 25,140Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_203300_1Bid Award Id
ViewTender No
13/EE/BSNL/CD/AB/2024-25Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..
43
-
-
... More
Sub-Head : Finishing 12 mm cement plaster of mix :
-
-
-
... More
1:4 (1 cement: 4 fine sand)
266
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
New work (Two or more coat applied @ 1.67 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 ltr/10sqm)
266
-
-
... More
Painting (one or more coats) on rain water, soil, waste and vent pipes and fittings with synthetic enamel paint of approved brand and manufacture and required colour on old work :
-
-
-
... More
75 mm diameter pipes .
120
-
-
... More
100 mm diameter pipes .
150
-
-
... More
150 mm diameter pipes .
90
-
-
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
-
-
-
... More
One or more coats on old work.
1130
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
2590
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface) [Note : The Item is excluding of the double scaffolding system which will be paid in basic item of double scaffolding system of Sub Head : Conservation of Heritage Buildings)
1082
-
-
... More
Sub-Head : Repairs to Buildings Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge.
-
-
-
... More
With cement mortar 1:4 (1 cement : 4 fine sand).
14
-
-
... More
Renewing glass panes, with putty and nails wherever necessary including racking out the old putty:
-
-
-
... More
Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm).
12
-
-
... More
Renewal of old putty of glass panes (length) .
229
-
-
... More
Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank, including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba, all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account)
9000
-
-
... More
Grouting with cement mortar 1:3 (1 cement : 3 fine sand) mixed with water proofing chemical of pidilite, Dr. Fixit or equivalent in required proportion for flat tile bricks on top of mud phaska as per direction of E-in-Charge :
1135
-
-
... More
Sub-Head : Dismantling and Demolishing Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
6
-
-
... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
216
-
-
... More
Sub-Head : Conservation of Heritage Buildings Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter.
-
-
-
... More
The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.
-
-
-
... More
Note :- (1) The elevational area of the scaffolding shall be measured for payment purpose.
-
-
-
... More
(2) The payment will be made once only for execution of all items for such works.
911
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements