Nuclear Power Corporation Of India Limited Tender

... More
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Nuclear Power Corporation Of India Limited - NPCIL Tender

Works
Paints and Enamels
Eprocure
Opening Date28 Mar 2025
Closing Date17 Apr 2025
Tender Amount₹ 2,84,05,460 
Notes
Download

AI Insights

Class Of Bidder
... View More
Class-I, Class-II Local Supplier
Bid Capacity
... View More
Bid Capacity = (A x N x 2) – B
Technical Capacity
... View More
The required prior work experience for the bidder is as follows: * The bidder should have completed at least two similar works, each of value not less than 50% of the estimated cost put to tender. * Alternatively, the bidder should have completed one similar work of value not less than 80% of the estimated cost put to tender. The value of similar work completed meeting the criteria of 80%/50%/40% of estimated cost put to tender should be provided.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Using SUNLIGHT - RUSTOMASTIC / ATUL - EPOGAURD for Floors, walls, ceilings etc.

-

-

-

... More
One coat

400

-

-

... More
Two coats

400

-

-

... More
Using ASIAN-APCODUR CF 641, CF 641-CS / BERGER - PROTECTOMASTIC / ICI - AKZONOBEL- INTERGARD 1054 AMERLOCK for Pipes, structures, platforms, supports, equipments, panels, ceiling, walls, dado etc.

-

-

-

... More
One coat

5000

-

-

... More
Two coats

6500

-

-

... More
Using SUNLIGHT - RUSTOMASTIC / ATUL - EPOGAURD for Pipes, structures, platforms, supports, equipments, panels, ceiling, walls, dado etc.

-

-

-

... More
One coat

1200

-

-

... More
Two coats

1000

-

-

... More
Supplying and applying 02 ( two) coats of Acrylic Emulsion paint to give an even shade of approved brand and shade from Berger Paints Bison Super Emulsion/Asian Paints Tractor Emulsion / Nerolac Acrylic Emulsion / ICI Maxilite Acrylic Emulsion over on all internal surfaces of walls / ceilings in rooms of buildings at all heights. Item includes preparing the surface by removing complete loose paints from existing surfaces by scrappers /electrical driven angle grinder machines and rectified those areas by applying primer and readymade acrylic putty compatible to paint as suggested by manufacture to make levelled surface before applying emulsion paint, filled the cracks and making good damaged & rough surfaces to smooth, minor repairs, sealing of cracks with readymade Acrylic crack free putty from paint manufacturer. Item includes cost of paints, brushes, acrylic putty, wire brushes, sand papers masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures and cleaning of area after completion of work. Work is to be carried out as directed by the Engineer in charge.

10000

-

-

... More
Supplying and applying Synthetic Enamel Paint at all elevations from Asian paints - (Premium Gloss enamel) / Berger paint (Hi Gloss Enamel) / Nerolac (Synthetic enamel Hi Gloss) paints over existing painted steel/metal /wooden/RCC/ Plastered surfaces etc. Item includes cost of paints, brushes, compatible putty, crack repairing, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures and cleaning of area after completion of work Work is to be carried out as per specification and as directed by the Engineer in charge.

-

-

-

... More
Single coat

8500

-

-

... More
Two coat

7000

-

-

... More
Supplying and painting the existing painted or unpainted surfaces with 02 (two) coats of approved Heat Resistant paint (Applied paint shall withstand against 600 degree Centigrade temperature) at all heights from Berger Paints / Asian Paints / Nerolack as directed by Engineer. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

400

-

-

... More
Supplying and painting the existing painted or unpainted surfaces with Aluminium paint of approved brand and shade from ASIAN / BERGER / SHALIMAR / ICI DULUX / JOHNSON on metal surfaces, fence, ducts, cable trays etc. at all heights. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

-

-

-

... More
One Coat

5000

-

-

... More
Two Coats

2000

-

-

... More
Supplying and painting of existing painted or unpainted surface of any water retaining old / new surfaces with 01 (one) coat of high build two components coal tar epoxy paint at all heights of approved brand from Sunlight Paints / Berger Paints / Asian Paints PPG / Nerolack Paints / ICI Dulux Paints as directed by engineer. Mixing of paint with thinner shall strictly be as per manufacturer's specification.Item includes cost of paints, thinner, brushes, stirer machines for mixing paint, crack repairing, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

1000

-

-

... More
Nomenclature painting work is to be carried out at any height by using alphabetic/numerals/symbol etc. up to a letter height of 1/2" to 6" by skilled painter including cost of synthetic enamel paint, brush, thinner, preparation of surfaces, removing dust, erection & removal of scaffolding at all elevation, etc. complete all as directed by Engineer. NOTE:- 1. One word/number/symbol will be measured in "Each nos."

300000

-

-

... More
Supplying and applying 01 (one) coat of synthetic enamel paint from Asian paints - (Premium Gloss enamel) / Berger paints (Hi Gloss Enamel) / Nerolac (Synthetic enamel Hi Gloss) paints etc. and shade over Existing painted or New surface of pipes and fittings etc. at all heights. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures. and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge. Note:- 1. No extra payment for valves etc. 2. Total running meter of pipe length painted will be measured and paid

-

-

-

... More
Pipe Diameter 150mm and upto 300mm

1000

-

-

... More
Pipe Diameter above 40mm and below 150mm.

3500

-

-

... More
Pipe Diameter 40mm and below

4500

-

-

... More
Supplying and applying exterior acrylic primer at all heights of approved shade from Asian / Berger / Nerolac over new / old surfaces as directed by the Engineer. Item includes preparing the surface by removing of all loose paints, dirt and dusts, cleaning of surface, filling / sealing of cracks up to 3mm by crack seal / putty as specified by paint manufacturer, making good the damaged & rough surfaces smooth, minor repairs, other major cracks sealing with Birla white cement / JK white cement crack free putty, cement slurry / cement mortar, cleaning of doors, windows, ventilators, glasses etc. after completion of work. Item includes cost of paints, brushes, wire brushes, sand papers, cleaning accessories, labour, tools and tackles, transportation, loading, unloading of materials at KAPS plant site,erection & removal of steel scaffolding, personnel safety of all workers with required PPE accessories etc., complete as directed by the Engineer in charge.

15000

-

-

... More
Supplying and applying 02 (two) coats of exterior emulsion paint of approved shade from Asian Paints make Apex ultima / Berger make Weather shield / Nerolac make Excel Mica Marble on new / old surfaces at all heights as directed by the Engineer. Generally Dark shade will be 20 % and Light shade will be 80%. Item includes preparing the surface by removing of all loose paints, dirt and dusts, cleaning of surface, filling / sealing of cracks up to 3mm by crack seal / putty as specified by paint manufacturer, making good the damaged & rough surfaces smooth, minor repairs, other major cracks sealing with Birla white cement / JK white cement crack free putty, cement slurry / cement mortar, cleaning of doors, windows, ventilators, glasses etc. after completion of work. Item includes cost of paints, brushes, wire brushes, sand papers, cleaning accessories, labour, tools and tackles, transportation, loading, unloading of materials at KAPS plant site,erection & removal of steel scaffolding, personnel safety of all workers with required PPE accessories etc., complete as directed by the Engineer in charge.

15000

-

-

... More
Supplying and applying 01(one) coat of Metal primer (Red oxide) at all heights from Asian paints / Berger paints / Nerolac paints over existing painted steel/metal surfaces etc. Item includes cost of metal primer, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

7000

-

-

... More
Providing and applying Repair materials at all elevation from Asian paints / Sika/ Fosroc/ Choksey / Pidilite for repairs of RCC members like beams, columns, slab and gutter etc. at all elevation. Item included cost of materials, labours, erection and removal of scaffolding, transportation, tools and tackles etc. Complete as per manufacturers specification and directed by Engineer-in-charge.

-

-

-

... More
Polymer modified Repair Mortar

300

-

-

... More
Micro-concrete

300

-

-

... More
Crack seal

200

-

-

... More
Preparing surface by Grinding Machine at all elevation having dust collecting arrangement (support of vacuum cleaner) so as to have proper binding of putty / primer to be applied including cleaning the surface with water if required etc. complete. Item including cost of grinder, blades, labour, erection and removal of scaffolding, transportation, tools and tackles etc. Complete as per directed by Engineer-in-charge.

900

-

-

... More
Supplying and painting 02 (two) coats of Chlorinated Rubber paint of approved brand and shade from Asian Paints / Sunlight Paints / Berger Paints on old / new steel structures, piping etc. at all elevation. Item includes cost of paints, brushes, stirer machines for mixing paint, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals. and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

7000

-

-

... More
Supplying and painting 02 (two) coats of Duco paint on old / new pipe structures, piping etc. at all elevations. Item includes cost of paints, thinner, brushes, spray machine, stirer machines for mixing paint, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

450

-

-

... More
Supplying and painting 02 (two) coats of PU Polish of approved brand and shade from Asian Paints / Berger Paints / Nerolac paints on wood or other furnishing items etc. as directed by Engineer. Item includes cost of paints, thinner, brushes, spray machine, stirer machines for mixing paint, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

200

-

-

... More
Part: B - Active Area Buildings. Supplying and applying of High build epoxy paint which is of two pack epoxy coating system comprising of compound A & B (i.e. Resin and Hardener) of approved brand and shade as per following sub items on Active Zone Buildings wherever high build epoxy paint is applicable at all elevations within plant site etc. Item includes cost of paints, brushes, compatible putty, stirer machines for mixing paint, crack repairing, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge. Using ASIAN-APCODUR CF 641, CF 641-CS / BERGER - PROTECTOMASTIC / ICI - AKZONOBEL- INTERGARD 1054 AMERLOCK for Floors, walls, ceilings etc.

-

-

-

... More
One coat

10000

-

-

... More
Two coats

7000

-

-

... More
Using SUNLIGHT - RUSTOMASTIC / ATUL - EPOGAURD for Floors, walls, ceilings etc.

-

-

-

... More
One coat

500

-

-

... More
Two coats

200

-

-

... More
Using ASIAN-APCODUR CF 641, CF 641-CS / BERGER - PROTECTOMASTIC / ICI - AKZONOBEL- INTERGARD 1054 AMERLOCK for Pipes, structures, platforms, supports, equipments, panels, ceiling, walls, dado etc.

-

-

-

... More
One coat

5000

-

-

... More
Two coats

2000

-

-

... More
Using SUNLIGHT - RUSTOMASTIC / ATUL - EPOGAURD for Pipes, structures, platforms, supports, equipments, panels, ceiling, walls, dado etc.

-

-

-

... More
One coat

2000

-

-

... More
Two coats

1000

-

-

... More
Supplying and applying 02 ( two) coats of Acrylic Emulsion paint to give an even shade of approved brand and shade from Berger Paints Bison Super Emulsion/Asian Paints Tractor Emulsion / Nerolac Acrylic Emulsion / ICI Maxilite Acrylic Emulsion over on all internal surfaces of walls / ceilings in rooms of buildings at all heights. Item includes preparing the surface by removing complete loose paints from existing surfaces by scrappers /electrical driven angle grinder machines and rectified those areas by applying primer and readymade acrylic putty compatible to paint as suggested by manufacture to make levelled surface before applying emulsion paint, filled the cracks and making good damaged & rough surfaces to smooth, minor repairs, sealing of cracks with readymade Acrylic crack free putty from paint manufacturer. Item includes cost of paints, brushes, acrylic putty, wire brushes, sand papers masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures and cleaning of area after completion of work. Work is to be carried out as directed by the Engineer in charge.

5500

-

-

... More
Supplying and applying Synthetic Enamel Paint at all elevations from Asian paints - (Premium Gloss enamel) / Berger paint (Hi Gloss Enamel) / Nerolac (Synthetic enamel Hi Gloss) paints over existing painted steel/metal /wooden/RCC/ Plastered surfaces etc. Item includes cost of paints, brushes, compatible putty, crack repairing, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnitures. and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

-

-

-

... More
Single coat

5000

-

-

... More
Two coat

1500

-

-

... More
Supplying and painting the existing painted or unpainted surfaces with 02 (two) coats of approved Heat Resistant paint (Applied paint shall withstand against 600 degree Centigrade temperature) at all heights from Berger Paints / Asian Paints / Nerolack as directed by Engineer. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals and cleaning after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

90

-

-

... More
Supplying and painting the existing painted or unpainted surfaces with Aluminium paint of approved brand and shade from ASIAN / BERGER / SHALIMAR / ICI DULUX / JOHNSON on metal surfaces, fence, ducts, cable trays etc. at all heights. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

-

-

-

... More
One Coat

1500

-

-

... More
Two Coats

1000

-

-

... More
Supplying and painting of existing painted or unpainted surface of any water retaining old / new surfaces with 01 (one) coat of high build two components coal tar epoxy paint at all heights of approved brand from Sunlight Paints / Berger Paints / Asian Paints PPG / Nerolack Paints / ICI Dulux Paints as directed by engineer. Mixing of paint with thinner shall strictly be as per manufacturer's specification.Item includes cost of paints, thinner, brushes, stirer machines for mixing paint, crack repairing, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

100

-

-

... More
Nomenclature painting work is to be carried out at any height by using alphabetic/numerals/symbol etc. up to a letter height of 1/2" to 6" by skilled painter including cost of synthetic enamel paint, brush, thinner, preparation of surfaces, removing dust, erection & removal of scaffolding at all elevation, etc. complete all as directed by Engineer. NOTE:- 1. One word/number/symbol will be measured in "Each nos."

100000

-

-

... More
Supplying and applying 01 (one) coat of synthetic enamel paint from Asian paints - (Premium Gloss enamel) / Berger paints (Hi Gloss Enamel) / Nerolac (Synthetic enamel Hi Gloss) paints etc. and shade over Existing painted or New surface of pipes and fittings etc. at all heights. Item includes cost of paints, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personals, shifting & replacing (after completion of painting work) in position all types of office furnituresand cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge. Note:- 1. No extra payment for valves etc. 2. Total running meter of pipe length painted will be measured and paid

-

-

-

... More
Pipe Diameter 150mm and upto 300mm

1000

-

-

... More
Pipe Diameter above 40mm and below 150mm.

1500

-

-

... More
Pipe Diameter 40mm and below

2000

-

-

... More
Supplying and applying exterior acrylic primer at all heights of approved shade from Asian / Berger / Nerolac over new / old surfaces as directed by the Engineer. Item includes preparing the surface by removing of all loose paints, dirt and dusts, cleaning of surface, filling / sealing of cracks up to 3mm by crack seal / putty as specified by paint manufacturer, making good the damaged & rough surfaces smooth, minor repairs, other major cracks sealing with Birla white cement / JK white cement crack free putty, cement slurry / cement mortar, cleaning of doors, windows, ventilators, glasses etc. after completion of work. Item includes cost of paints, brushes, wire brushes, sand papers, cleaning accessories, labour, tools and tackles, transportation, loading, unloading of materials at KAPS plant site,erection & removal of steel scaffolding, personnel safety of all workers with required PPE accessories etc., complete as directed by the Engineer in charge.

450

-

-

... More
Supplying and applying 02 (two) coats of exterior emulsion paint of approved shade from Asian Paints make Apex ultima / Berger make Weather shield / Nerolac make Excel Mica Marble on new / old surfaces at all heights as directed by the Engineer. Generally Dark shade will be 20 % and Light shade will be 80%. Item includes preparing the surface by removing of all loose paints, dirt and dusts, cleaning of surface, filling / sealing of cracks up to 3mm by crack seal / putty as specified by paint manufacturer, making good the damaged & rough surfaces smooth, minor repairs, other major cracks sealing with Birla white cement / JK white cement crack free putty, cement slurry / cement mortar, cleaning of doors, windows, ventilators, glasses etc. after completion of work. Item includes cost of paints, brushes, wire brushes, sand papers, cleaning accessories, labour, tools and tackles, transportation, loading, unloading of materials at KAPS plant site,erection & removal of steel scaffolding, personnel safety of all workers with required PPE accessories etc., complete as directed by the Engineer in charge.

450

-

-

... More
Supplying and applying 01(one) coat of Metal primer (Red oxide) at all heights from Asian paints / Berger paints / Nerolac paints over existing painted steel/metal surfaces etc. Item includes cost of metal primer, brushes, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work Work is to be carried out as per specification and as directed by the Engineer in charge.

900

-

-

... More
Providing and applying Repair materials at all elevation from Asian paints / Sika/ Fosroc/ Choksey / Pidilite for repairs of RCC members like beams, columns, slab and gutter etc. at all elevation. Item included cost of materials, labours, erection and removal of scaffolding, transportation, tools and tackles etc. Complete as per manufacturers specification and directed by Engineer-in-charge.

-

-

-

... More
Polymer modified Repair Mortar

180

-

-

... More
Micro-concrete

180

-

-

... More
Crack seal

90

-

-

... More
Preparing surface by Grinding Machine at all elevation having dust collecting arrangement (support of vacuum cleaner) so as to have proper binding of putty / primer to be applied including cleaning the surface with water if required etc. complete. Item including cost of grinder, blades, labour, erection and removal of scaffolding, transportation, tools and tackles etc. Complete as per directed by Engineer-in-charge.

450

-

-

... More
Supplying and painting 02 (two) coats of Chlorinated Rubber paint of approved brand and shade from Asian Paints / Sunlight Paints / Berger Paints on old / new steel structures, piping etc. at all elevation. Item includes cost of paints, brushes, stirer machines for mixing paint, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work. Work is to be carried out as per specification and as directed by the Engineer in charge.

180

-

-

... More
Supplying and painting 02 (two) coats of Duco paint on old / new pipe structures, piping etc. at all elevations. Item includes cost of paints, thinner, brushes, spray machine, stirer machines for mixing paint, preparation of surfaces by removing dirt, dust, grease, oil etc. with the help of scrappers, wire brushes / electrical driven angle grinder machines / sand papers (preparing of surface such that proper bonding of fresh coat will be achieved which will avoid bubble formation), masking tapes / paper tapes (used in painting work for avoiding extra unwanted areas), labours, tools and tackles, erection & removal of steel scaffolding, safety accessories for personnel and cleaning of area after completion of work Work is to be carried out as per specification and as directed by the Engineer in charge.

90

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.