National High Speed Rail Corporation Limited Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_NHSRC_106048_1Bid Award Id
ViewTender No
NHSRCL/BRC/2022/03Tender Authority
National High Speed Rail Corporation Limited ViewPurchaser Address
-Website
http://http://www.nhsrcl.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Drilling of hole in rail of any section and any UTS, manually with contractor's labours, tools & plants, consumables etc. for - (a) Hole of dia. 25mm and above
2056
-
292.58
Assembling complete BG Turnout including symmetrical split on staging or on formation / ballast bed to correct gauge and alignment as per standard drawing on all types of rails over PSC sleepers at specified locations, duly leading special size sleepers, switches, crossings, fittings, fastenings etc. with maximum lead of 250m & all lift and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete and as directed by engineer in-charge.
Note: (Rail cutting and Drilling shall be paid separately)
1 in 8½ Turnout
3
-
49559.89
Dismantling of existing BG turnouts and trap switches with all types of rails on other than PSC sleeper layout, removing fish plates & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat & countable manner, as directed by Engineer in-charge : Under Conditions not requiring Traffic Block - 1 in 8½ Turnout
2
-
34364.93
Dismantling of existing BG turnouts and trap switches with all types of rails on other than PSC sleeper layout, removing fish plates & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat & countable manner, as directed by Engineer in-charge : Under Conditions not requiring Traffic Block - Extra over Items 071031 to 071035 and 071037 to 071041 for PSC sleeper layout
2
-
15772.28
Insertion of concrete sleepers in Turnouts in lead and crossing portions (excluding switch portion) as per standard drawing under traffic; carrying out required ballasting with available ballast, stacking of released materials and boxing, packing & supporting track and maintaining track parameters, as directed by engineer in-charge for passing trains safely at 20 kmph speed for - 1 in 8½ Turnout
1
-
31279.64
Laying 52Kg / 60Kg rails during traffic block on existing PSC Turnout, excluding switch portion, i.e. laying lead & crossing portions including cutting, drilling etc. and fixing all components - lead rails, crossing, check rail etc. alongwith re-spacing of sleepers as per standard drawing and making turnout
fit for safe passage of traffic at 20 kmph speed for - 1 in 8½ Turnout
1
-
27618.39
Assembling & insertion of all types of Switch Assembly on Broad Gauge with 52Kg / 60Kg rails & PSC sleepers on temporary staging, built with railway's sleepers, rails etc. at indicated location including cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling etc. including preparation for operation of traffic block & inserting Switch portion during traffic block by removing all ballast, muck etc. upto required level, attending track parameters including lifting, spreading of deficient ballast from adjoining track, if required, packing etc. complete as directed by engineer in-charge, so as to make track fit for 20 kmph speed for - 1 in 8½ Turnouts
1
-
37580.62
Fabrication, supply and fixing of hand operated lever boxes with pull rod of 33mm dia to Drg.No. MA3040 including lead, lift, loading, unloading, tools and plants, transportation, crossing of track wherever necessary as directed by Engineer-in-charge at site.
NOTE: 1. Rate including Fabrication, Supply and Fixing of hand operated boxes.
2. Spring point lever (Self reversing type) as per drawing no. TMC-12 (Sheet 1,2,3).
2
-
16847.31
Fabrication, supply and fixing of MS lock pins/bolts for stock and tongue rails made out of MS 40mm dia of length 200mm with head cutting, lathe machining, milling, drilling, welding the rod with MS flat of 6mm thick of suitable size as required at site with MS split pins/bolts and supplying of remaining ancillary materials required at for locking, including all taxes, lead, lift, loading and un loading , tools and plants, transportation, crossing of track whenever necessary etc., complete and as directed by Engineer-in-charge at site.
2
-
1212.71
Running out / Putting of railway's stone ballast from existing stacks available along alignment either on top of cutting or on formation or at toe of bank by head leads or by any other means and spreading to the required profile with contractor's labour, tools & plants, as directed by Engineer in-charge.
{Payment shall be made based on ballast stack measurement} For lead upto 50m and lift up to 5m
4632
-
133.51
Extra over item no. 081051 for each additional lead of 50m or part thereof when total lead exceeds
50m, but upto 250m for each Cum.
4071
-
35.14
Miscellaneous WR USSOR ITEMS 2019(Lump sum)
500000
-
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements