Indian Army Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Indian Army - OSCC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Oct 2024
Closing Date18 Nov 2024
Tender Amount₹ 3,89,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SCHEDULE ‘A’ PART- III ( INTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-III (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 90

1

122600

-

... More
SCHEDULE ‘A’ PART- IV (EOT CRANES) Lump sum price worked out by the contractor for "EOT CRANES" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-IV (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 94

1

7000000

-

... More
SCHEDULE ‘A’ PART- V (FURNITURE) Lump sum price worked out by the contractor for "FURNITURE" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-V (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 95

1

370700

-

... More
SCHEDULE ‘A’ PART- VI (EXTERNAL ELECTRIC SUPPLY) Lump sum price worked out by the contractor for "EXTERNAL ELECTRIC SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VI (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 96

1

1536500

-

... More
SCHEDULE ‘A’ PART- VII (EXTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 99

1

972000

-

... More
SCHEDULE ‘A’ PART- VIII (FIRE FIGHTING) Lump sum price worked out by the contractor for "FIRE FIGHTING" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VIII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 102

1

44000

-

... More
SCHEDULE ‘A’ PART-IX (SUMMER APPLIANCES) Lump sum price worked out by the contractor for "SUMMER APPLIANCES" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-IX (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 103

1

248600

-

... More
SCHEDULE ‘A’ PART-X (AIR COMPRESSOR) Lump sum price worked out by the contractor for "AIR COMPRESSOR" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-X (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 104

1

1049500

-

... More
SCHEDULE ‘A’ PART-XI (LIGHTING PROTECTION) Lump sum price worked out by the contractor for "LIGHTING PROTECTION" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XI (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 106

1

302000

-

... More
SCHEDULE ‘A’ PART-XII (SEWAGE DISPOSAL) Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 107

1

492800

-

... More
SCHEDULE ‘A’ PART-XIII (AREA DRAINAGE) Lump sum price worked out by the contractor for "AREA DRAINAGE" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XIII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 110

1

401900

-

... More
NOTE APPLICABLE FOR ALL ITEMS :- If rate quoted for similar/identical items in same part of Sch ‘A’ is at variance, the lowest rate quoted shall only be considered for payment to the contractor. The quantities mentioned in the schedules and BoQ are minimum that needs to be provided, any addition in quantities, item, a superior design/mix as necessitated by the vetted design from IIT/NIT or as per the prevalent ground condition shall be deemed to be catered by the bidder as part of Lump sum contract of entire scope of bid. No deviation from quoted amount shall be considered.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.