Forest Department Tender
... More
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Forest Department Tender
Civil And Construction
Building Construction
Opening Date27 Jan 2023
Closing Date13 Feb 2023
Tender Amount₹ 26,44,459
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
387091Bid Award Id
ViewTender No
03/2022-23/S3Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://forests.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of FSO Quarters;Coursed Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
34.57
-
164824
... More
Construction of FSO Quarters;Skirting with 4" wide high with 12mm thick Polished Shabad stone blue veriety stone of 1st. Quality of size not exceeding 0.457m X0.457m laid over C.C. Flooring bed set over 20mm thick C.M.(1:3) prop base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed with neat cement paste, including seignourage, cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as mixing mortar, dressing, laying, lift charges, curring etc, complete for finished item of work as per SS, but excluding cost of C.C.bed.
9.11
-
9931
... More
Construction of FSO Quarters;SANITARY CHARGES 06% OF TOTAL COST
-
-
142303
... More
Construction of FSO Quarters;DOOR:Tomber shall be of the kind as specified , may be teak, shisham,sal,deodar etc. the timber shall be of best quality, well seasoned and free from sap, knots, warps, cracks, and other defects.all wood work shall be planed,and neatly and truly finished to the exact dimensions.All joints shall be neat and strong, truly and accurately fitted, and glued before beig fitted together.Chaukhats: The chaukhats shall be properly framed and joined by mortise and tenon joint with hard wooden pins, and the joints shall be coated with white lead before being fited together . The chaukhats shall be of sectionas per drawing , may be 7.5 x 10 cm , 10 x 10 cm , 8x12 cm or similar section. for fouble leaves the chaukhats shall be of 8 x 12cm section. Concealed faces of chaukhats shall be painted with two coats of coaltar or solignum and the other faces shall be painted with a prime coat before fixing is positon.Shutters or leaves:The shutters may be panelled , glazed part panelled and part glazed battened, or venetian as specified. the thickness of shutters shall be (11/2" to 2) 3cm to 5cm as specified . the styles, rails and penels shall be planed and neatly and trulu finishedto the exact dimensions. The styles and rails shall be ramed properly and accurately with morties and tenon joint and fixed with wooden pins. Panels shall be of one piece with out any joint and shall be fixed with 12mm (1/2") insertions into the rails provided with mouldings as per design. The thickness of panels shall be 12mm to 25 mm (1/2' to 1') as specified. all rails over 15cm (6') in width shall have double tenon.no tenon shall be exceeded one - forth of thickness of the plant. for glazed windows sash bars shall not be less than 40 * 40 mm and glasses shll be fixed with nails and putty or with wooden beading over felf as specified. all joints shall be glued before being fitted.fittings. All doors shall be provided with handle on both sides and all windows with handles on the inner sides. one of the door of each room shall be provided with sliding bolts on the outer side for locking. necessary hinges, tower bolts, hook bolts, stops for keeping the leaves ipen, a dn also wooden block o prevent leaves strick the jambs of wall, etc shall be provided the fittings may be of iron, brass or oxidized as specified as approved quality screws shall be suitable length and correct diameter and shall be fixed with screw driver and not by hammering.
6
-
91524
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns.
4.76
-
64689
... More
Construction of FSO Quarters;Vibrated Plain Cement Concrete (1:3:6) proportion (cement) fine aggregate Coarse aggregate for foundation using 40mm size Hard Broken Granite Metal (SS.5) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water including machaine mixing and Vibrating Charges, Seneriage charges etc to site, including of all materials, and all labour charges etc., complete for finished item of work as per SS of APSS fpr levelling Course.For Bed under Column Footing & CRs Walls
13.09
-
70642
... More
Construction of FSO Quarters;Painting to New walls with 2 coats of water proof cement paint of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal walls .(APSS No. 911) - C Ceiling
163.2
-
28723
... More
Construction of FSO Quarters;Providing & fixing non skid ceremic tiles for flooringover and inclusive of 20 mm thick base plaster in cement mortar 1:8 (1 cement : 8 Coarse sand) including a floating cement slurry inclding grouting/ filling te joints with white cemnt slurry mixed with matching pigment, curing cleaning and leaving/ making necessary holes for sanitay connecton complete but including cost of cement and tiles in all heights/level. sabe above for skirting in all heights/level.
3.78
-
4326
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth Beam.
4.59
-
62924
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Column Footings.
14.75
-
149237
... More
Construction of FSO Quarters;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
37.32
-
21777
... More
Construction of FSO Quarters;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for finished item of work. (APSS 901,903 & 904) - A) Internal
195.93
-
95957
... More
Construction of FSO Quarters;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
52.26
-
26248
... More
Construction of FSO Quarters;Supplying and fixing of fully glazed anodised aluminium hinged type window with fan light as per drawing using standard outer frame 38.5x 33x21x2.5mm thk: and central mullion of size59(3mm)x33(2.5mm)x25(3mm) and shutters made of anodised Aluminium Z section24.5(3mm)x33(4m m)x21(3mm) using 5mm thk: glass fitted with suitable aluminium glazing clips and rubber beading incl: supplying and fixing friction hinges (2no. Per shutter), handle with lock(1no Per shutter), incl: cost and conveyance to site of aluminium sections, glass, rubber beading, fixtures etc., incl: labour charges for manufacturing window, fixing in position using wooden blocks and sheet metal screws etc., complete for finished item (sections confirming to IS 1948-67) and as per consultants TBSC - M -I-01
14.67
-
94137
... More
Construction of FSO Quarters;S& F sintex PVC doors for all toilets of supplying of PVC door having Chowkat frame of hollow PVC section 100 * 50 mm having wall thickness of 2.5mm reinforcement with 24.5 x 32.5mm steel tuber on GI J channel and outside self built feed section corner to fixed by aluminium cleats with necessary screws, chowkat to be fixed to wall by 4" screws: Door shutter to be made of single panel shutter of 25mm th. Provided with Keyless lock,100mm Aluminium Tower bolt , fixed to the frame by 3nos PC MS BUtt hinges incl all incedental charges for fixing dorr furniture incl. Cost of harware for finished item of work size as per consultants appraoval tatal all floors. TBSC-L-III-02
4.75
-
11842
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams
6.27
-
83003
... More
Construction of FSO Quarters;Painting to New Externalwalls with 2 coats of water proof cement paint of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal walls .(APSS No. 911) - B External
198.46
-
34992
... More
Construction of FSO Quarters;Brick Masonary in CM(1:6) prop using 2nd class brick having a crushing strength not less than 35 Kg/ Sqcm including cost and conveyance of material and water to work site seigniorage and all operational, incidental labour charges such as mixing mortor, constructing masonary, lift charges, curing etc complete for finished item of work as per SS . 9" thick brick walls - A) 9 " BRICK WALL NORTH & SOUTH
26.68
-
227478
... More
Construction of FSO Quarters;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
3912.15
-
360188
... More
Construction of FSO Quarters;ELECTRICAL CHARGES 5.5% OF TOTAL COST
-
-
130444
... More
Construction of FSO Quarters;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation
94.08
-
39452
... More
Construction of FSO Quarters;Painting to New Externalwalls with 2 coats of water proof cement paint of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal walls .(APSS No. 911) - A internal
195.93
-
60730
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Roof Slab
147.77
-
245276
... More
Construction of FSO Quarters;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for finished item of work. (APSS 901,903 & 904) - D) Deductions
125.82
-
61620
... More
Construction of FSO Quarters;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
21.71
-
8003
... More
Construction of FSO Quarters;Providing impervious coat to exposed RCC roof slab surface with CM(1:3),20 mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excuding conveyance charges of materials and including all operational, incedental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
137.36
-
74784
... More
Construction of FSO Quarters;Providing Anti termite treatment for pre-construction at basement level of the building over Basement sand fill as per manufactures specification & as specified in IS 613 (part-II) 1981 using Chlorifiriphos 20% EC diluted to 1% EC by adding water I.e 1:20 ratio and poured uniformly in to sand fill with the help og mug at a spacing of 30Cm intervals both the directions including cost and conveyance of all materials and labour charges etc., complete inder 10 years guarantee at site of work as directed. for all taxes. TBSC-Q-VI-22
88.09
-
12245
... More
Construction of FSO Quarters;Ventilators Glazed ventilator as per drawing using anodised aluminium sections of 900 x 600 mm 100mm Aluminium Tower clips and rubber beading including supply and fixing of nos. frictions hinges, 2nos.ISI marked anodised aluminium tower bolts75mm long including cost and conveyance of all materials to site, fixtures in position using wooden blocks & sheet metals screws etc.(complete for finished items(confirm IS-1946-1961 and as approved by consultant) TBSC - M -III-04
0.36
-
1529
... More
Construction of FSO Quarters;Brick Masonary in CM(1:6) prop using 2nd class brick having a crushing strength not less than 35 Kg/ Sqcm including cost and conveyance of material and water to work site seigniorage and all operational, incidental labour charges such as mixing mortor, constructing masonary, lift charges, curing etc complete for finished item of work as per SS . 9" thick brick walls - B) 4.5 BRICK WAL
5.02
-
42801
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Lintels
0.69
-
9844
... More
Construction of FSO Quarters;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Chajjas - Sunshades (0.60 mts wide sunshades 75mm thick at fixed end and 50mm thick at free end).
19.4
-
22036
... More
Construction of FSO Quarters;Vibrated Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed
11.1
-
55880
... More
Construction of FSO Quarters;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970) Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing concrete in Concrete Mixer, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for fixing of Doors and Windows and Steps
0.3
-
1636
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements