Directorate General Of Lighthouses And Lightships Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Directorate General Of Lighthouses And Lightships - DGLL Tender

Works
Eprocure
Opening Date27 Dec 2019
Closing Date17 Jan 2020
Tender Amount₹ 61,45,987 
Notes
Download

Costs

Summary

Special Repair To Tower Base And Service Room At Mungra Reef Island Lh In Gok(midsea)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in ordinary rock excavation in trenches for foundations for soft rocks including dressing of sides and ramming of bottoms lift upto 2.00 m incuding getting out the excavated soil, dewatering and disposal of surplus excavated soil as directed within a lead of 50 m, including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges and all other charges etc. complete

22

-

-

... More
Taking away the existing old/scrapped ms trestle tower, ladders, railings, sheets etc by the contractor , including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete

1000

-

-

... More
Drilling 25 mm dia hole in masonry wall upto 500 mm depth and inserting 16 mm dia CRS Fe-500D zinc chromate primer coated bars,sealing the hole with approved quality epoxy mortar of make Hindustan Cibageigy OR EQUIVALENT mixing with silica sand as per manufacturer specification properly to existing Tower as per drawing and direction including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.(Excluding cost of bars).

660

-

-

... More
Providing and applying two or more coats of Nitobond epoxy or Equivalent coating for the bonding of old & new wall surface by brush including preparing the old wall surface with mechanised wire brush,removing the saline substances,all dirt,dust,loose deposites,algee and make surface free from all other type of contamination, including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

216

-

-

... More
Supplying & placing CRS -Fe-500D tor steel reinforcement of approved brand TATA/Vizag/SAIL in position for R.C.C. work including straightening, cutting, bending, fixing and binding with approved 1st quality binding wire as per drawings & as directed, Nitoprime Zincrich primer of Fosroc or Equivalent shall be applied before placing the reinf. in position including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

7073

-

-

... More
Providing and laying R.C.C. 1:1:2 (1Cement: 1 River sand: 2 stone aggregate of 20 mm nominal size) for R.C.C. work of tower base & plinth,SUPERSTRUCTURE including batching, mixing with FOSROC CONPLAST UW or equivalent as per manufacturer spcification, laying, compacting ,cost of centering, steel shuttering, full finishing to the exposed faces, including cost of delay, damage, loss to the work or re-work for tidal condition, cost of supply of all materials, labours, tools & plants, curing & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

-

-

-

... More
RCC Work up to 1.50 Mtr.

50

-

-

... More
RCC work above 1.50 Mtr.

92

-

-

... More
Laying the existing spilled and spreaded CC blocks of size 250x250x450 in position as per drawing & direction in RCC work at the base portion of the tower including collecting, carrying , lifting & placing the blocks ,including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

150

-

-

... More
Providing and fixing ready made recycled teakwood door with frame (.75x2.00m) including all brass fittings and fixtures, including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

1

-

-

... More
Supply,fabrication & erection,Fixing of GI ladder ,GI Hand railing ,as per drawing including grouting the legs, Hot dip galvanizing 120 micron to all steel material, including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

1228

-

-

... More
Applying Deckgaurd S or equivalent approved paint two or more coat upto full cover the surface evently of brand Fosroc Fairmate with primer (Nitozinc fosroc), application method as pr manufacturers specification to the concrete and steel surface with required shade as directed including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour, all tools & plants, Sea going Flat bottom Barge (Self Propelled) with working boat charges all & other charges etc. complete.

365

-

-

... More
Providing Flat bottom Barge (Self Propelled) with small boat as per approved specifications by the Department and approved by GMB/MMD for camping of menpower ,civil materials, supervisery staff in boat near mungra reef area and stay provision at Jodiya setting up tents, 3 KVA Gen set , bedding ,drinking water,construction water etc including the cost of Fuel charges crew charges and hire charges etc complete for the period until entire completion of the work including cost of delay, damage, loss to the work or re-work for tidal condition,supply of all materials, labours, tools & plants, scaffolding & working in island with labour etc all complete.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.