Directorate General Of Lighthouses And Lightships Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Directorate General Of Lighthouses And Lightships - DGLL Tender

Works
Civil And Construction
Eprocure
Opening Date15 Jan 2021
Closing Date4 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying cement concrete 1:1.5:3 (1 cement:1.5 coarse river sand:3 graded stone aggregate 20 mm nominal down size) RCC works for Lighthouse Tower (for all heights) including mixing, laying, compacting, vibrating, levelling, curing, etc all as per standard specification and as required including cost of all materials, tools & plants, labours, transportation , scaffolding and all other charges etc.complete but excluding the cost of reinforcement and shuttering.

0.59

-

-

... More
Centering and shuttering (with shuttering oil)including strutting,propping etc and removal of form work for all heights including supply of all materials( binding wire,nails),labours,tools & plants,transportation,(lead& lift)scaffolding and all other charges etc.complete for all heights as per Instruction and direction of Engineer-In-Charge.

25.11

-

-

... More
Providing and fixing Granite stone 12 to18 mm thick gang saw mirror polished ,premoulded and prepolished,machine cut for Lighthouse Tower Landing,Tread Riser & platforms of required size,approved shade,colour and texture laid over 20 mm thick base cement mortar(1:4(1 cement:4 coarse river sand),joints treated with white cement mixed with matching pigment,epoxy touch ups,including rubbing,curing,moulding and polishing to edges to give high gloss finish etc.complete at all levels including cost of all materials,labour,tools & plants,transportation and all other charges etc., complete as per standard specification ans as per Instruction & direction of Engineer-In-Charge.

206.66

-

-

... More
Providing and Laying (water proofing)china mosaic flooring over terrace (after removing terrace topping)using broken pieces of full white/colour glazed tiles laid over 20 mm/as per require thick cement mortar in 1:4(1 cement:4 coarse sand) to maintain proper slope with water proofing compound on plain or curved,slope surface to be tampered to bring mortar cement cream up to surface with using white cement for filling of joints roughening of china mosaic is done after cleaning,preparing remove loose plaster with wire brush and water and all visible crakes a routed out/making V-Shape grooveand then filled with cement and water proofing chemical with cement slurry including the cost of all materials,labours,tools & plants and all other charges etc complete as per instruction and direction of Engineer-In-Charge.

428.59

-

-

... More
Applying two or more coats of Synthetic Enamel Paint of approved 1 rst quality -High Glossy -Berger/Asian brand over a coat of primer for all heights of Light House Tower to give an even shade including throughly cleaning the surface to remove all dirt,dust ,mortar draps and other foreign matter etc., including cost of all materials,labours,brushes,transportation,scaffolding and ladder safety measures and all other charges etc.,complete as per instruction & direction of Engineer-In-Charge.

873.12

-

-

... More
Applying One or more coats of Synthetic Enamel Paint of approved 1 rst quality Berger/Asian brand over existing surface of painted surface for Light House Tower and staff qtr door,window to give an even shade including throughly cleaning the surface to remove all dirt,dust ,mortar draps and other foreign matter etc., including cost of all materials,labours,brushes,transportation,scaffolding and ladder safety measures and all other charges etc.,complete as per instruction of Engineer-In-Charge.

901.38

-

-

... More
Replacement of old broken glass panels with new 3.5/4 mm thk frosted /plane window glass panes fixed with clay,pins,teakwood beading etc including removing/disposing of old crack/damaged window glass up to all heights of bldgs /Light House Tower,all as directed and all as per standard specification, including cost of all materials,labours ,tools & plants,scafolding, ,transportation (including lead & lift) etc.complete as per instruction & direction of Engineer-In-Charge.

2.33

-

-

... More
Applying Two or more coats of weather coat Exterior Emulsion Paint of approved brand & colour of top quality (BERGER(Antidust)/ASIAN(Apex Ultima)) on new/old wall surface( including coat of primer new/old surface) at all heights to give an even shade ,all as per standard specification and as directed including throughly brooming the surface to remove all dirt,dust,mortar draps ,loose paint and other foreign matter including the cost of all labour,materials,scafolding,tools & plants,transporttion (including lead & lift) etc complete as per instruction and direction of Engineer-In-Charge.

5343.76

-

-

... More
Providing & Fixing broken glass panes in uniform pattern on top of existing compound wall after plaster of 20 mm or more in 1:6 (1 cement:6 river sand) for fixing glass panes(with proper finish) after removing of existing paint and hacking the top surface(before plaster) top of compound wall including curing supply of all labours,materials,scaffolding,transportation ,tools,& plants and all other charges etc complete as per instruction& direction by the Engineer-In-Charge

280.57

-

-

... More
Jungle Clearance including uprooting rank vegetation,grass,shrubs,saplings and trees girth up to 300 mm etc.(cutting & levelling)and disposal/removal of debris as directed,including supply of all labours,tools & plants and all other charges etc.complete as per instruction & direction of Engineer-In-Charge.

1860.9

-

-

... More
Brick work with burnt clay bricks of approved quality of class designation 7.5 in cement mortar 1:6 ( 1 cement : 6 river sand) for superstructure (up to all specified heights)as per standard specification and as directed including cost of all materials, transportation, scaffolding, labour, tools & plants,curing and all other charges etc.complete as per instruction & direction of Engineer-In-Charge.

14.91

-

-

... More
15 mm thick cement plaster on Masonry/RCC work in cement mortar 1:4 (1 Cement :4 river sand) in line & level at all heights as per standard specifications and as directed including making of grooves/raindrip/patt wherever required,supply of all labours,tools & plants ,hacking(over RCC surface) curing,materials,tools & plants,scaffolding and all other charges etc complete as per instruction & direction of Engineer-In-Charge.

190.03

-

-

... More
Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 coarse river sand: 3 graded stone aggregate 20mm nominal down size) -All work up to Plinth level for specified area including mixing laying,compacting,levelling,curing, etc.all as per standard speciffication and as required including cost of all materials,tools & plants, labours , transportation(lead & lifts),scaffolding and all other charges etc. complete but excluding the cost of reinforcement and shuttering etc complete as per instruction and direction of Engineer-In-Charge

0.88

-

-

... More
Earth work in excavation( (Hydraulic excavator/manual means ) in trenches for foundation in all type of soils including back filling and disposal pf surplus excavated soil as directed within a lead of 500m all as per standard specifications and as directed including cost of all Labours, tools & plants and all other charges etc.complete.

-

-

-

... More
All kind of soil not exceeding 30 cm in depth but exceeding 1.50 m in width as well as 10 sqm on plan.

12.54

-

-

... More
Providing and Laying base P.C.C in CC 1:4:8 ( 1cement:4coarse river sand : 8 graded stone aggregate 20 mm nominal down size)All work up to Plinth level for concrete work (excluding shuttering) including mixing,laying,compacting,levelling,curing etc.,all as per standard specification and as required,including cost of all materials,tools & plants,labours,lead & lifts and all other charges etc complete.as per instruction and direction of Engineer-In-Charge.

0.16

-

-

... More
Demolishing of RCC work manually/mechanical means including stacking of steel bars and disposal of 50.0 metres lead as per direction of Engineer-In-Charge for all heights including the cost of all labours,materials,scaffolding,tools ,plants,transportation (including lead & lift) from site etc complete.

0.43

-

-

... More
Demolishing of Masonry work in cement mortar manually/by mechanically means including stacking of serviceable material and disposal of unserviceable material with in 50.0 metres lead as per direction of Engineer-In-Charge including the cost of all labours,materials,scaffolding,tools ,plants,transportation (including lead & lift) from site etc complete for all heights.

1.87

-

-

... More
Providing and Applying white cement based putty of average thickness 1 mm,of approved brand and manufacturer over the plastered wall surface(old/new) to prepare the surface even and smooth etc complete for all heightsof Lighthouse Tower & staff Qtrs) as per direction of Engineer-In-Charge including supply of all labours/painters,tools & plants,materials,scaffolding,transportation and all other charges etc complete.

52.08

-

-

... More
Applying Distemper(one or more coats) with 1rst quality acrylic distemper(Readymix)of (Asian/Berger brand)having VOC content less than 50 grams/ltr of approved brand and manufacture to give an even shade on old surface of staff qtrs & Lighthouse Tower for all heights including throughly brooming the surface to remove all dirt,dust,mortar draps and other foreign matter etc including cost of labour,materials,scaffolding,transportation etc complete. as per instruction & direction of Engineer-In-Charge.

2394.53

-

-

... More
Providing ,Laying & fixing PVC Pipes (6kg/sq.cm) of approved brand and manufacturer for rain water / sewer pipe line laid from roof of the building/kitchen/ toilet/ bathroom etc including providing necessary fixture & fittings like Tee,Shoe, Elbow, Socket,Bend (Long/Short/Shoe/Plug/plug bend,Y),PVC Cowl (wherever reuired chipping/ making of hole in walls & plugging of holes),Clamp at 1.00 m spacing,Screws (Brass),solution(excluding the cost of excavation) including the cost of all labours, materials,scafolding, tools,plants & transportation (including lead &lift) to site etc complete.for all heights.

-

-

-

... More
100 mm dia pipe

43

-

-

... More
50 dia pipe

20.8

-

-

... More
Supplying Plumber for repair & maintenance of staff Qtrs plumbing accessories like shower with nose,pillar tap,bib cock(long & short body),geysor pipe,connector pipe,angle/stop cock, valve ,water supply & sewer line etc as per instruction & direction of Engineer -In- Charge which includines removing ,cleaning & refixing & testing of accessories with required materials like teflon tape etc for staff Qtrs & Office building .

9

-

-

... More
Providing and fixing ISI marked flush door shutters(after removing old one) of Century/equivalent approved make conforming to IS: 2202(Part I) non decorative type,core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws including supply of all labours (carpenter), materials, transportation, tools & plants etc complete as direction of Engineer-In -Charge for staff qtrs

8.13

-

-

... More
Applying white/colour wash(one or more coats) over old surface to give an even shade up to all heights including throughly brooming the surface to remove all dirt,dust,mortar draps and other foreign matter etc including cost of labour,materials,scaffolding,transportation etc complete. as per instruction & direction of Engineer-In-Charge.

66.13

-

-

... More
Repairing of cracks for wall surface of Lighthouse Tower & staff Qtrs after making U/V-shape groove size of 25x25 mm and then priming the surface with integral crystalline slurry @ 0.05 kg per running meter and while the surface is tacky then filling the groove up to top edge with crystalline mortar @ 1.50 kg per running meter .Once crystalline mortar is touch dry then finally applying two coats of integral crystalline slurry @ 0.05 kg per running meter per coat on treated surface etc complete as per instruction & direction of Engineer-In-Charge including cost of all labours,tools,plants,materials,curing etc ,complete.

40.8

-

-

... More
Providing ,Supplying,Straightening,cutting,bending,binding and placing in position tested torr steel reinforcement/TMT bars of Grade Fe 500D of approved quality (TATA TISCON/SAIL/VIZAG)as per drawings and specification & as directed for all heights including supply of all labours,tools,materials(binding wire ,nails) etc.complete.( for staff qtrs ) etc.

70.4

-

-

... More
Dismantling of old damaged Hand Railing of Lighthouse Tower ( Including RCC Pillars ) carefully without damaging existing structure including stacking of serviceable materials and disposal of unseriviceable materials with in lead of 500 m including all charges for labour,materials,tools & plants,safty measures , transportation and all other charges etc complete.as per Instruction &direction of Engineer-In-Charge.

28

-

-

... More
Taking away the scrap reinforcement from dismantled RCC structure from the site on buy back by the contractor after stacking serviceable materials as proper and as directed at site and disposal of unserviceable materials with in a lead of 100 mtrs including the cost of all labour charges ,lift & lead loading and unloading, transportation, tools & plants,weighing charges and all other charges etc., complete as per Instruction &direction of Engineer-In- Charge.

225

-

-

... More
Providing and Fixing Stainless Steel Angle flat(of approved quality) for damaged joints of door/window with brass screws including the cost of all labour,materials,tools,plants,transportation etc complete as per instruction & direction of Engineer-In-Charge.

-

-

-

... More
Stainless Steel Angle flat of size 75x75 mm (for window)

664

-

-

... More
Stainless Steel Angle flat of size 100x100 mm (for door)

568

-

-

... More
Painting to Staff Qtr furniture (like cot,table chair,dinning table,T-Poi,Meat safe etc)with One or more coats of synthtic enamel paint of Asian/Berger brand (1rst quality)of approved colour including the cost of all labours,materials(paint,brush,sand paper etc),tools & plants ,lead ,lift (removing & placing as per direction) and all other charges etc.complete as per instruction & direction of Engineer-In-Charge.

94

-

-

... More
Providing and fixing Netlon mesh for window/door/Vent. /Meat safe of staff qtrs and wherever directed including fixing with 1 st quality teak wood with screws including cost of all materials,labours,transportation,tools&plants etc complete for staff qtrs .,as per direction of Engineer -In-Charge.

4.8

-

-

... More
Providing /Cutting and fixing 12 mm tk furniture ply of Century/equivalent brand for staff qtrs furniture including supply of all materials,carpenter/labour,tools &plants, transportation (lead &lift) and all other charges etc complete as per instruction and direction of Engineer-In-Charge.

8.1

-

-

... More
Cleaning of Septic Tank including removing and fixing of top cover fo staff qtrs including supply of all labour,materials,tools,plants,(lead & lift) and all other charges etc complete as per instruction and direction of Engineer-In-Charge.

8

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.