Department Of Revenue Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Department Of Revenue Tender

Goods
Electrical Goods and Equipments
Electrical and Electronics
GEM
Opening Date21 Feb 2024
Closing Date2 Mar 2024
Tender Amount₹ 1,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
MANDAP WITHOUT ZOOL-30 TO 45 DAY , MANDAP WITHOUT ZOOL-30 TO 45 DAY

1500

-

-

... More
WATERPROOF MANDAP WITHOUT ZOOL-1 DAY , WATERPROOF MANDAP WITHOUT ZOOL-1 DAY

3000

-

-

... More
WATERPROOF MANDAP WITHOUT ZOOL-2 DAY , WATERPROOF MANDAP WITHOUT ZOOL-2 DAY

3000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-1 DAY , MANDAP SIDE WALL 6 FT HEIGHT-1 DAY

9000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-2 DAY , MANDAP SIDE WALL 6 FT HEIGHT-2 DAY

6000

-

-

... More
MANDAP SIDE WALL 10 FT HEIGHT-1 DAY , MANDAP SIDE WALL 10 FT HEIGHT-1 DAY

9000

-

-

... More
MANDAP SIDE WALL 10 FT HEIGHT-2 DAY , MANDAP SIDE WALL 10 FT HEIGHT-2 DAY

6000

-

-

... More
TEMPORARY WOODEN RAMP-1 DAY for Polling Station 1.12 minimum 3 Feet width , TEMPORARY WOODEN RAMP-1 DAY for Polling Station 1.12 minimum 3 Feet width

15

-

-

... More
100 MTR BOUNDRY WITH LIME at Polling Station , 101 MTR BOUNDRY WITH LIME at Polling Station

436

-

-

... More
STAGE AND STAIR WITH CARPET-1 DAY , STAGE AND STAIR WITH CARPET-1 DAY

1500

-

-

... More
STAGE BACKDROP Cloth-1 DAY BLUE-WHITE-COLOUR , STAGE BACKDROP Cloth-1 DAY BLUE-WHITE-COLOUR

3000

-

-

... More
RED CARPET-1 DAY only for Model PS , RED CARPET-1 DAY only for Model PS

600

-

-

... More
GREEN FLOORING-1 DAY , GREEN FLOORING-1 DAY

150000

-

-

... More
GREEN FLOORING-2 DAY , GREEN FLOORING-2 DAY

30000

-

-

... More
GREEN FLOORING-30 TO 45 DAY , GREEN FLOORING-30 TO 45 DAY

1500

-

-

... More
RAJAI-1 DAY , RAJAI-1 DAY

7500

-

-

... More
CHADAR-1 DAY , CHADAR-1 DAY

7500

-

-

... More
SHETRANJI-1 DAY , SHETRANJI-1 DAY

60

-

-

... More
GADLA-1 DAY , GADLA-1 DAY

7500

-

-

... More
GADLA-2 DAY , GADLA-2 DAY

150

-

-

... More
GADLA-3 DAY , GADLA-3 DAY

150

-

-

... More
GADLA-30 TO 45 DAY , GADLA-30 TO 45 DAY

30

-

-

... More
OSHIKU-1 DAY , OSHIKU-1 DAY

7500

-

-

... More
OSHIKU-2 DAY , OSHIKU-2 DAY

30

-

-

... More
OSHIKU-30 TO 45 DAY , OSHIKU-30 TO 45 DAY

30

-

-

... More
DECORATIVE ENTRY GATE-1 DAY for only Model PS , DECORATIVE ENTRY GATE-1 DAY for only Model PS

810

-

-

... More
DECORATION WITH ARTIFICAL FLOWER-1 DAY , DECORATION WITH ARTIFICAL FLOWER-1 DAY

810

-

-

... More
BARRICATING OF IRON PIPE-1 DAY 6 FT HEIGHT , BARRICATING OF IRON PIPE-1 DAY 6 FT HEIGHT

1500

-

-

... More
PVC PLASTIC CHAIR-1 DAY , PVC PLASTIC CHAIR-1 DAY

7500

-

-

... More
PVC PLASTIC CHAIR-2 DAY , PVC PLASTIC CHAIR-2 DAY

1500

-

-

... More
PVC PLASTIC CHAIR-3 to 6 DAYS , PVC PLASTIC CHAIR-3 to 6 DAYS

300

-

-

... More
PVC PLASTIC CHAIR-30 TO 45 DAYS , PVC PLASTIC CHAIR-30 TO 45 DAYS

150

-

-

... More
KUSHAN CHAIR IRON or Plastic or Wooden only for Model PS -1 DAY , KUSHAN CHAIR IRON or Plastic or Wooden only for Model PS -1 DAY

90

-

-

... More
REVOLVING CHAIR-1 DAY , REVOLVING CHAIR-1 DAY

15

-

-

... More
REVOLVING CHAIR-2 DAY , REVOLVING CHAIR-2 DAY

9

-

-

... More
REVOLVING CHAIR-3 DAY , REVOLVING CHAIR-3 DAY

9

-

-

... More
TIPOI STANDRAD SIZE-1 DAY , TIPOI STANDRAD SIZE-1 DAY

15

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-1 DAY , TABLE 3 BY 2 WITHOUT CLOTH-1 DAY

750

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-2 DAY , TABLE 3 BY 2 WITHOUT CLOTH-2 DAY

30

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-3 DAY , TABLE 3 BY 2 WITHOUT CLOTH-3 DAY

30

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITHOUT CLOTH-30 TO 45 DAY

30

-

-

... More
TABLE 3 BY 2 WITH CLOTH-1 DAY , TABLE 3 BY 2 WITH CLOTH-1 DAY

300

-

-

... More
TABLE 3 BY 2 WITH CLOTH-2 DAY , TABLE 3 BY 2 WITH CLOTH-2 DAY

30

-

-

... More
TABLE 3 BY 2 WITH CLOTH-3 DAY , TABLE 3 BY 2 WITH CLOTH-3 DAY

30

-

-

... More
TABLE 3 BY 2 WITH CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITH CLOTH-30 TO 45 DAY

30

-

-

... More
TABLE 4 BY 2 WITHOUT CLOTH-1 DAY , TABLE 4 BY 2 WITHOUT CLOTH-1 DAY

750

-

-

... More
TABLE 4 BY 2 WITH CLOTH-1 DAY , TABLE 4 BY 2 WITH CLOTH-1 DAY

300

-

-

... More
DIAS TABLE-1 DAY , DIAS TABLE-1 DAY

30

-

-

... More
LEATHER SOFA 1 SEATER-1 DAY , LEATHER SOFA 1 SEATER-1 DAY

15

-

-

... More
LEATHER SOFA 1 SEATER-2 DAY , LEATHER SOFA 1 SEATER-2 DAY

6

-

-

... More
LEATHER SOFA 2 SEATER-1 DAY , LEATHER SOFA 2 SEATER-1 DAY

6

-

-

... More
LEATHER SOFA 2 SEATER-2 DAY , LEATHER SOFA 2 SEATER-2 DAY

6

-

-

... More
LEATHER SOFA 2 SEATER-3 TO 6 DAY , LEATHER SOFA 2 SEATER-6 DAY

6

-

-

... More
WOODEN PARTITION with Labour Charge -30 TO 45 DAY , WOODEN PARTITION with Labour Charge -30 TO 45 DAY

900

-

-

... More
GALVANIZED SHEET PARTITION with Cloth-1 DAY , GALVANIZED SHEET PARTITION with Cloth-1 DAY

300

-

-

... More
WATER GLASS STEEL-1 DAY , WATER GLASS STEEL-1 DAY

300

-

-

... More
WATER JUG 20 LTR-1 DAY , WATER JUG 20 LTR-1 DAY

300

-

-

... More
TENT 20 BY 20 BY 10 for Checkpost -30 TO 45 DAY , TENT 20 BY 20 BY 10 for Checkpost -30 TO 45 DAY

15

-

-

... More
DRINKING WATER TANKER 2000 LTR-1 DAY , DRINKING WATER TANKER 2000 LTR-1 DAY

15

-

-

... More
LED TUBELIGHT 22 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
LED TUBELIGHT 22 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
LED TUBELIGHT 22 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
FLOOD LIGHT 100 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

150

-

-

... More
FLOOD LIGHT 100 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

60

-

-

... More
HALOGEN 500 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

60

-

-

... More
HALOGEN 500 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

60

-

-

... More
HALOGEN 1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
HALOGEN 1000 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
HALOGEN 1000 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
SOUND SYSTEM-1 DAY , WITH 1 SPEAKER, 1 EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

36

-

-

... More
EXTRA SPEAKER-1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
EXTRA AMPLIFIER 50 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

6

-

-

... More
EXTRA CORDLESS MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
EXTRA COLLAR-BUTTON MIKE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

9

-

-

... More
MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
Pedal Stand Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

150

-

-

... More
Ceiling Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

300

-

-

... More
HEAVY DUTY AIR CIRCULATOR-1 DAY , JUMBO AIR COOLER WITH WATER FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
TEMPORARY PLUG POINT 5 AMP Or 15AMP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

300

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

6

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

3

-

-

... More
GENERATOR SET 125 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

6

-

-

... More
GENERATOR SET 250 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

3

-

-

... More
PILLAR FOR THE LIGHT 12 TO 15 FEET HEIGHT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

60

-

-

... More
DP SWITCH 16-32 AMPERE-1 DAY , MCB-ICDP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
TP SWITCH 16-32 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
TP SWITCH 63-200 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
BUSBAR 63 TO 100 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
BUSBAR 200 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

15

-

-

... More
CHANGE OVER SWITCH 4 POLL 63 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

12

-

-

... More
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

12

-

-

... More
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

12

-

-

... More
SECTION PEELER 75 BY 60 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

9

-

-

... More
SECTION PEELER 60 BY 30 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

9

-

-

... More
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
ELCB SWITCH SINGLE PHASE 63 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
ELCB SWITCH THREE PHASE 40 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
ELCB SWITCH THREE PHASE 63 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
ELCB SWITCH THREE PHASE 100 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

9

-

-

... More
3.5 KV UPS 4 HOUR BACKUP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

6

-

-

... More
SPLIT AC 1.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

3

-

-

... More
SPLIT AC 2.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

3

-

-

... More
TOWER AC 2 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

3

-

-

... More
PENAL BOX 500 AMP -1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

9

-

-

... More
Drinking Water Empty Barrel 200 LTR-1 DAY , DRinking Water Empty Barrel 200 LTR

60

-

-

... More
Labour Manpower for 8 Hours , Labour Manpower for 8 Hours

600

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.