Department Of Revenue Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Department Of Revenue Tender
Electrical Goods and Equipments
Electrical and Electronics
GEM
Opening Date21 Feb 2024
Closing Date2 Mar 2024
Tender Amount₹ 1,00,00,000
Costs
EMD
₹ 3,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2024/B/4669525Bid Award Id
ViewTender No
GEM/2024/B/4669525Tender Authority
Department Of Revenue ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
mandap-furniture-2024_-_group_a_2024-02-21-13-25-03_57a0d509e12e5dde10f987dd15298ae0.pdf
mandap_group_1_-_mandap_2024-02-21-13-25-03_65ffc226a2bc15bbf4a6c19328be1b32.csv
BOQ Items
MANDAP WITHOUT ZOOL-30 TO 45 DAY , MANDAP WITHOUT ZOOL-30 TO 45 DAY
1500
-
-
WATERPROOF MANDAP WITHOUT ZOOL-1 DAY , WATERPROOF MANDAP WITHOUT ZOOL-1 DAY
3000
-
-
WATERPROOF MANDAP WITHOUT ZOOL-2 DAY , WATERPROOF MANDAP WITHOUT ZOOL-2 DAY
3000
-
-
MANDAP SIDE WALL 6 FT HEIGHT-1 DAY , MANDAP SIDE WALL 6 FT HEIGHT-1 DAY
9000
-
-
MANDAP SIDE WALL 6 FT HEIGHT-2 DAY , MANDAP SIDE WALL 6 FT HEIGHT-2 DAY
6000
-
-
MANDAP SIDE WALL 10 FT HEIGHT-1 DAY , MANDAP SIDE WALL 10 FT HEIGHT-1 DAY
9000
-
-
MANDAP SIDE WALL 10 FT HEIGHT-2 DAY , MANDAP SIDE WALL 10 FT HEIGHT-2 DAY
6000
-
-
TEMPORARY WOODEN RAMP-1 DAY for Polling Station 1.12 minimum 3 Feet width , TEMPORARY WOODEN RAMP-1 DAY for Polling Station 1.12 minimum 3 Feet width
15
-
-
100 MTR BOUNDRY WITH LIME at Polling Station , 101 MTR BOUNDRY WITH LIME at Polling Station
474
-
-
STAGE AND STAIR WITH CARPET-1 DAY , STAGE AND STAIR WITH CARPET-1 DAY
1500
-
-
STAGE BACKDROP Cloth-1 DAY BLUE-WHITE-COLOUR , STAGE BACKDROP Cloth-1 DAY BLUE-WHITE-COLOUR
3000
-
-
RED CARPET-1 DAY only for Model PS , RED CARPET-1 DAY only for Model PS
600
-
-
GREEN FLOORING-1 DAY , GREEN FLOORING-1 DAY
150000
-
-
GREEN FLOORING-2 DAY , GREEN FLOORING-2 DAY
30000
-
-
GREEN FLOORING-30 TO 45 DAY , GREEN FLOORING-30 TO 45 DAY
1500
-
-
RAJAI-1 DAY , RAJAI-1 DAY
7500
-
-
CHADAR-1 DAY , CHADAR-1 DAY
7500
-
-
SHETRANJI-1 DAY , SHETRANJI-1 DAY
60
-
-
GADLA-1 DAY , GADLA-1 DAY
7500
-
-
GADLA-2 DAY , GADLA-2 DAY
150
-
-
GADLA-3 DAY , GADLA-3 DAY
150
-
-
GADLA-30 TO 45 DAY , GADLA-30 TO 45 DAY
30
-
-
OSHIKU-1 DAY , OSHIKU-1 DAY
7500
-
-
OSHIKU-2 DAY , OSHIKU-2 DAY
30
-
-
OSHIKU-30 TO 45 DAY , OSHIKU-30 TO 45 DAY
30
-
-
DECORATIVE ENTRY GATE-1 DAY for only Model PS , DECORATIVE ENTRY GATE-1 DAY for only Model PS
810
-
-
DECORATION WITH ARTIFICAL FLOWER-1 DAY , DECORATION WITH ARTIFICAL FLOWER-1 DAY
810
-
-
BARRICATING OF IRON PIPE-1 DAY 6 FT HEIGHT , BARRICATING OF IRON PIPE-1 DAY 6 FT HEIGHT
1500
-
-
PVC PLASTIC CHAIR-1 DAY , PVC PLASTIC CHAIR-1 DAY
7500
-
-
PVC PLASTIC CHAIR-2 DAY , PVC PLASTIC CHAIR-2 DAY
1500
-
-
PVC PLASTIC CHAIR-3 to 6 DAYS , PVC PLASTIC CHAIR-3 to 6 DAYS
300
-
-
PVC PLASTIC CHAIR-30 TO 45 DAYS , PVC PLASTIC CHAIR-30 TO 45 DAYS
150
-
-
KUSHAN CHAIR IRON or Plastic or Wooden only for Model PS -1 DAY , KUSHAN CHAIR IRON or Plastic or Wooden only for Model PS -1 DAY
90
-
-
REVOLVING CHAIR-1 DAY , REVOLVING CHAIR-1 DAY
15
-
-
REVOLVING CHAIR-2 DAY , REVOLVING CHAIR-2 DAY
9
-
-
REVOLVING CHAIR-3 DAY , REVOLVING CHAIR-3 DAY
9
-
-
TIPOI STANDRAD SIZE-1 DAY , TIPOI STANDRAD SIZE-1 DAY
15
-
-
TABLE 3 BY 2 WITHOUT CLOTH-1 DAY , TABLE 3 BY 2 WITHOUT CLOTH-1 DAY
750
-
-
TABLE 3 BY 2 WITHOUT CLOTH-2 DAY , TABLE 3 BY 2 WITHOUT CLOTH-2 DAY
30
-
-
TABLE 3 BY 2 WITHOUT CLOTH-3 DAY , TABLE 3 BY 2 WITHOUT CLOTH-3 DAY
30
-
-
TABLE 3 BY 2 WITHOUT CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITHOUT CLOTH-30 TO 45 DAY
30
-
-
TABLE 3 BY 2 WITH CLOTH-1 DAY , TABLE 3 BY 2 WITH CLOTH-1 DAY
300
-
-
TABLE 3 BY 2 WITH CLOTH-2 DAY , TABLE 3 BY 2 WITH CLOTH-2 DAY
30
-
-
TABLE 3 BY 2 WITH CLOTH-3 DAY , TABLE 3 BY 2 WITH CLOTH-3 DAY
30
-
-
TABLE 3 BY 2 WITH CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITH CLOTH-30 TO 45 DAY
30
-
-
TABLE 4 BY 2 WITHOUT CLOTH-1 DAY , TABLE 4 BY 2 WITHOUT CLOTH-1 DAY
750
-
-
TABLE 4 BY 2 WITH CLOTH-1 DAY , TABLE 4 BY 2 WITH CLOTH-1 DAY
300
-
-
DIAS TABLE-1 DAY , DIAS TABLE-1 DAY
30
-
-
LEATHER SOFA 1 SEATER-1 DAY , LEATHER SOFA 1 SEATER-1 DAY
15
-
-
LEATHER SOFA 1 SEATER-2 DAY , LEATHER SOFA 1 SEATER-2 DAY
6
-
-
LEATHER SOFA 2 SEATER-1 DAY , LEATHER SOFA 2 SEATER-1 DAY
6
-
-
LEATHER SOFA 2 SEATER-2 DAY , LEATHER SOFA 2 SEATER-2 DAY
6
-
-
LEATHER SOFA 2 SEATER-3 TO 6 DAY , LEATHER SOFA 2 SEATER-6 DAY
6
-
-
WOODEN PARTITION with Labour Charge -30 TO 45 DAY , WOODEN PARTITION with Labour Charge -30 TO 45 DAY
900
-
-
GALVANIZED SHEET PARTITION with Cloth-1 DAY , GALVANIZED SHEET PARTITION with Cloth-1 DAY
300
-
-
WATER GLASS STEEL-1 DAY , WATER GLASS STEEL-1 DAY
300
-
-
WATER JUG 20 LTR-1 DAY , WATER JUG 20 LTR-1 DAY
300
-
-
TENT 20 BY 20 BY 10 for Checkpost -30 TO 45 DAY , TENT 20 BY 20 BY 10 for Checkpost -30 TO 45 DAY
15
-
-
DRINKING WATER TANKER 2000 LTR-1 DAY , DRINKING WATER TANKER 2000 LTR-1 DAY
15
-
-
LED TUBELIGHT 22 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
LED TUBELIGHT 22 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
LED TUBELIGHT 22 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
FLOOD LIGHT 100 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
150
-
-
FLOOD LIGHT 100 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
60
-
-
HALOGEN 500 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
60
-
-
HALOGEN 500 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
60
-
-
HALOGEN 1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
HALOGEN 1000 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
HALOGEN 1000 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
SOUND SYSTEM-1 DAY , WITH 1 SPEAKER, 1 EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT
36
-
-
EXTRA SPEAKER-1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
EXTRA AMPLIFIER 50 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
6
-
-
EXTRA CORDLESS MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
EXTRA COLLAR-BUTTON MIKE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
9
-
-
MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
Pedal Stand Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
150
-
-
Ceiling Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
300
-
-
HEAVY DUTY AIR CIRCULATOR-1 DAY , JUMBO AIR COOLER WITH WATER FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
TEMPORARY PLUG POINT 5 AMP Or 15AMP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
300
-
-
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
6
-
-
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3
-
-
GENERATOR SET 125 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
6
-
-
GENERATOR SET 250 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3
-
-
PILLAR FOR THE LIGHT 12 TO 15 FEET HEIGHT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
60
-
-
DP SWITCH 16-32 AMPERE-1 DAY , MCB-ICDP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
TP SWITCH 16-32 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
TP SWITCH 63-200 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
BUSBAR 63 TO 100 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
BUSBAR 200 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
15
-
-
CHANGE OVER SWITCH 4 POLL 63 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
12
-
-
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
12
-
-
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
12
-
-
SECTION PEELER 75 BY 60 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
9
-
-
SECTION PEELER 60 BY 30 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
9
-
-
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
ELCB SWITCH SINGLE PHASE 63 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
ELCB SWITCH THREE PHASE 40 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
ELCB SWITCH THREE PHASE 63 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
30
-
-
ELCB SWITCH THREE PHASE 100 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
9
-
-
3.5 KV UPS 4 HOUR BACKUP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
6
-
-
SPLIT AC 1.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3
-
-
SPLIT AC 2.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3
-
-
TOWER AC 2 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3
-
-
PENAL BOX 500 AMP -1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
9
-
-
Drinking Water Empty Barrel 200 LTR-1 DAY , DRinking Water Empty Barrel 200 LTR
60
-
-
Labour Manpower for 8 Hours , Labour Manpower for 8 Hours
600
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements