Collector Office Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Collector Office Tender

Goods
GEM
Opening Date20 Feb 2024
Closing Date1 Mar 2024
Tender Amount₹ 4,50,00,000 
Auction Start Date5 Mar 2024
Auction End Date7 Mar 2024
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
MANDAP WITHOUT ZOOL-2 DAY , MANDAP WITHOUT ZOOL

240000

-

-

... More
MANDAP WITHOUT ZOOL-3 DAY , MANDAP WITHOUT ZOOL

7000

-

-

... More
MANDAP WITHOUT ZOOL-30 TO 45 DAY , MANDAP WITHOUT ZOOL

5000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-1 DAY , 6 FT HEIGHT

70000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-2 DAY , 6 FT HEIGHT

18000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-3 DAY , 6 FT HEIGHT

1000

-

-

... More
MANDAP SIDE WALL 6 FT HEIGHT-30 TO 45 DAY , 6 FT HEIGHT

3000

-

-

... More
MANDAP SIDE WALL 10 FT HEIGHT-1 DAY , 10 FT HEIGHT

1000

-

-

... More
MANDAP SIDE WALL 10 FT HEIGHT-2 DAY , 10 FT HEIGHT

1000

-

-

... More
TEMPORARY WOODEN RAMP-1 DAY , 1,12- 3 FT WIDTH MINIMUM

1000

-

-

... More
100 MTR BOUNDRY WITH LIME , 1802 POLLING STATION

1850

-

-

... More
STAGE AND STAIR WITH CARPET-1 DAY , STAGE AND STAIR WITH CARPET

16000

-

-

... More
STAGE AND STAIR WITH CARPET-2 DAY , STAGE AND STAIR WITH CARPET

4000

-

-

... More
STAGE AND STAIR WITH CARPET-30 TO 45 DAY , STAGE AND STAIR WITH CARPET

1000

-

-

... More
STAGE BACKDROP-1 DAY , BLUE-WHITE COLOUR

3000

-

-

... More
RED CARPET-1 DAY , RED CARPET

10000

-

-

... More
GREEN FLOORING-1 DAY , GREEN FLOORING

350000

-

-

... More
GREEN FLOORING-2 DAY , GREEN FLOORING

250000

-

-

... More
GREEN FLOORING-3 DAY , GREEN FLOORING

35000

-

-

... More
GREEN FLOORING-30 TO 45 DAY , GREEN FLOORING

35000

-

-

... More
RAJAI-1 DAY , RAJAI

100

-

-

... More
CHADAR-1 DAY , CHADAR

100

-

-

... More
SHETRANJI-1 DAY , SHETRANJI

100

-

-

... More
GADLA-1 DAY , GADLA

10000

-

-

... More
GADLA-2 DAY , GADLA

1000

-

-

... More
GADLA-3 DAY , GADLA

500

-

-

... More
GADLA-30 TO 45 DAY , GADLA

350

-

-

... More
OSHIKU-1 DAY , OSHIKU

100

-

-

... More
DECORATIVE ENTRY GATE-1 DAY , DECORATIVE ENTRY GATE

3000

-

-

... More
DECORATION WITH ARTIFICAL FLOWER-1 DAY , DECORATION WITH ARTIFICAL FLOWER

3000

-

-

... More
WOODEN BARRICATING-1 DAY , 6 FT HEIGHT

25000

-

-

... More
WOODEN BARRICATING-2 DAY , 6 FT HEIGHT

1000

-

-

... More
WOODEN BARRICATING-30 TO 45 DAY , 6 FT HEIGHT

8000

-

-

... More
BARRICATING OF IRON PIPE-1 DAY , 6 FT HEIGHT

2000

-

-

... More
BARRICATING OF IRON PIPE-2 DAY , 6 FT HEIGHT

2000

-

-

... More
BARRICATING OF IRON PIPE-30 TO 45 DAY , 6 FT HEIGHT

2000

-

-

... More
PVC PLASTIC CHAIR-1 DAY , PVC PLASTIC CHAIR

22000

-

-

... More
PVC PLASTIC CHAIR-2 DAY , PVC PLASTIC CHAIR

3000

-

-

... More
PVC PLASTIC CHAIR-3 DAY , PVC PLASTIC CHAIR

500

-

-

... More
PVC PLASTIC CHAIR-30 TO 45 DAY , PVC PLASTIC CHAIR

300

-

-

... More
KUSHAN CHAIR-1 DAY , IRON-WOODEN-PVC

300

-

-

... More
KUSHAN CHAIR-2 DAY , IRON-WOODEN-PVC

100

-

-

... More
KUSHAN CHAIR-30 TO 45 DAY , IRON-WOODEN-PVC

150

-

-

... More
REVOLVING CHAIR-1 DAY , REVOLVING CHAIR

150

-

-

... More
REVOLVING CHAIR-2 DAY , REVOLVING CHAIR

50

-

-

... More
REVOLVING CHAIR-30 TO 45 DAY , REVOLVING CHAIR

50

-

-

... More
TIPOI-1 DAY , STANDRAD SIZE

20

-

-

... More
TIPOI-30 TO 45 DAY , STANDRAD SIZE

10

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-1 DAY , TABLE 3 BY 2 WITHOUT CLOTH

50

-

-

... More
TABLE 3 BY 2 WITHOUT CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITHOUT CLOTH

50

-

-

... More
TABLE 3 BY 2 WITH CLOTH-1 DAY , TABLE 3 BY 2 WITH CLOTH

50

-

-

... More
TABLE 3 BY 2 WITH CLOTH-30 TO 45 DAY , TABLE 3 BY 2 WITH CLOTH

50

-

-

... More
TABLE 4 BY 2 WITHOUT CLOTH-1 DAY , TABLE 4 BY 2 WITHOUT CLOTH

50

-

-

... More
TABLE 4 BY 2 WITHOUT CLOTH-30 TO 45 DAY , TABLE 4 BY 2 WITHOUT CLOTH

50

-

-

... More
TABLE 4 BY 2 WITH CLOTH-1 DAY , TABLE 4 BY 2 WITH CLOTH

4500

-

-

... More
TABLE 4 BY 2 WITH CLOTH-2 DAY , TABLE 4 BY 2 WITH CLOTH

1000

-

-

... More
TABLE 4 BY 2 WITH CLOTH-3 DAY , TABLE 4 BY 2 WITH CLOTH

300

-

-

... More
TABLE 4 BY 2 WITH CLOTH-30 TO 45 DAY , TABLE 4 BY 2 WITH CLOTH

250

-

-

... More
SOFA 1 SEATER-1 DAY , SOFA 1 SEATER

10

-

-

... More
SOFA 1 SEATER-30 TO 45 DAY , SOFA 1 SEATER

10

-

-

... More
SOFA 2 SEATER-1 DAY , SOFA 2 SEATER

30

-

-

... More
SOFA 2 SEATER-30 TO 45 DAY , SOFA 2 SEATER

10

-

-

... More
SOFA 3 SEATER-1 DAY , SOFA 3 SEATER

50

-

-

... More
SOFA 3 SEATER-2 DAY , SOFA 3 SEATER

30

-

-

... More
SOFA 3 SEATER-30 TO 45 DAY , SOFA 3 SEATER

10

-

-

... More
WOODEN PARTITION-1 DAY , WOODEN PARTITION

8000

-

-

... More
WOODEN PARTITION-30 TO 45 DAY , WOODEN PARTITION

3000

-

-

... More
GALVANIZED SHEET PARTITION-1 DAY , GALVANIZED SHEET PARTITION

1000

-

-

... More
GALVANIZED SHEET PARTITION-30 TO 45 DAY , GALVANIZED SHEET PARTITION

100

-

-

... More
GALVANIZED IRON MESH-1 DAY , GALVANIZED IRON MESH

18000

-

-

... More
GALVANIZED IRON MESH-30 TO 45 DAY , GALVANIZED IRON MESH

1500

-

-

... More
WATER GLASS STEEL-1 DAY , WATER GLASS STEEL

50

-

-

... More
WATER GLASS STEEL-2 DAY , WATER GLASS STEEL

50

-

-

... More
WATER GLASS STEEL-30 TO 45 DAY , WATER GLASS STEEL

50

-

-

... More
WATER JUG 20 LTR-1 DAY , WATER JUG 20 LTR

1000

-

-

... More
WATER JUG 20 LTR-30 TO 45 DAY , WATER JUG 20 LTR

100

-

-

... More
TENT-1 DAY , 20 BY 20 BY 10

5

-

-

... More
TENT-30 TO 45 DAY , 20 BY 20 BY 10

30

-

-

... More
DRINKING WATER TANKER-1 DAY , 2000 LTR

10

-

-

... More
LED TUBELIGHT 22 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

100

-

-

... More
LED TUBELIGHT 22 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
LED TUBELIGHT 22 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
FLOOD LIGHT 100 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

350

-

-

... More
FLOOD LIGHT 100 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

450

-

-

... More
FLOOD LIGHT 100 WATT-3 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

40

-

-

... More
FLOOD LIGHT 100 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

200

-

-

... More
HALOGEN 500 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HALOGEN 500 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HALOGEN 500 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HALOGEN 1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HALOGEN 1000 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HALOGEN 1000 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HEAVY SOUND SYSTEM-1 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

21

-

-

... More
HEAVY SOUND SYSTEM-2 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HEAVY SOUND SYSTEM-3 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
HEAVY SOUND SYSTEM-30 TO 45 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SIMPLE SOUND SYSTEM-1 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SIMPLE SOUND SYSTEM-2 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SIMPLE SOUND SYSTEM-30 TO 45 DAY , WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
EXTRA SPEAKER-1000 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

40

-

-

... More
EXTRA SPEAKER-1000 WATT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
EXTRA SPEAKER-1000 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
EXTRA AMPLIFIER 50 WATT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
EXTRA AMPLIFIER 50 WATT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
EXTRA CORDLESS MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

40

-

-

... More
EXTRA CORDLESS MICROPHONE-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
EXTRA CORDLESS MICROPHONE-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
EXTRA COLLAR-BUTTON MIKE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
MICROPHONE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
EXTRA CABINET SPEAKER-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
Pedal Stand Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

1600

-

-

... More
Pedal Stand Fan-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

300

-

-

... More
Pedal Stand Fan-3 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

100

-

-

... More
Pedal Stand Fan-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
Ceiling Fan-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

100

-

-

... More
Ceiling Fan-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

700

-

-

... More
Ceiling Fan-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
HEAVY DUTY AIR CIRCULATOR-1 DAY , JUMBO COOLER, 60 LTR, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
HEAVY DUTY AIR CIRCULATOR-2 DAY , JUMBO COOLER, 60 LTR, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
HEAVY DUTY AIR CIRCULATOR-30 TO 45 DAY , JUMBO COOLER, 60 LTR, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
TEMPORARY PLUG POINT 15AMP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

1500

-

-

... More
TEMPORARY PLUG POINT 15AMP-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

500

-

-

... More
TEMPORARY PLUG POINT 15AMP-3 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

70

-

-

... More
TEMPORARY PLUG POINT 15AMP-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

200

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
GENERATOR SET 125 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

7

-

-

... More
GENERATOR SET 125 KVA-2 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

7

-

-

... More
GENERATOR SET 125 KVA-30 TO 45 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

7

-

-

... More
GENERATOR SET 250 KVA-1 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

1

-

-

... More
GENERATOR SET 250 KVA-2 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

1

-

-

... More
GENERATOR SET 250 KVA-30 TO 45 DAY , WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

1

-

-

... More
PILLAR FOR THE LIGHT 12 TO 15 FEET HEIGHT-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
PILLAR FOR THE LIGHT 12 TO 15 FEET HEIGHT-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

70

-

-

... More
PILLAR FOR THE LIGHT 12 TO 15 FEET HEIGHT-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
DP SWITCH 16-32 AMPERE-1 DAY , MCB-ICDP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

120

-

-

... More
DP SWITCH 16-32 AMPERE-2 DAY , MCB-ICDP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

110

-

-

... More
DP SWITCH 16-32 AMPERE-30 TO 45 DAY , MCB-ICDP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

120

-

-

... More
TP SWITCH 16-32 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

80

-

-

... More
TP SWITCH 16-32 AMPERE-2 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

80

-

-

... More
TP SWITCH 16-32 AMPERE-30 TO 45 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

110

-

-

... More
TP SWITCH 63-200 AMPERE-1 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
TP SWITCH 63-200 AMPERE-2 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
TP SWITCH 63-200 AMPERE-30 TO 45 DAY , MCB-ICTP AS PER SITE REQUIREMENT, WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

30

-

-

... More
BUSBAR 63 TO 100 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
BUSBAR 63 TO 100 AMPERE TILL 1 MTR-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
BUSBAR 200 AMPERE TILL 1 MTR-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
BUSBAR 200 AMPERE TILL 1 MTR-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
BUSBAR 200 AMPERE TILL 1 MTR-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
CHANGE OVER SWITCH 4 POLL 63 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
CHANGE OVER SWITCH 4 POLL 63 AMPERE-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SECTION PEELER 75 BY 60 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SECTION PEELER 75 BY 60 BY 45-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SECTION PEELER 75 BY 60 BY 45-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SECTION PEELER 60 BY 30 BY 45-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SECTION PEELER 60 BY 30 BY 45-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SECTION PEELER 60 BY 30 BY 45-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

25

-

-

... More
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

70

-

-

... More
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

70

-

-

... More
ELCB SWITCH SINGLE PHASE 63 AMPERE DP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
ELCB SWITCH SINGLE PHASE 63 AMPERE DP-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
ELCB SWITCH THREE PHASE 40 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
ELCB SWITCH THREE PHASE 40 AMPERE 4 POLL-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
ELCB SWITCH THREE PHASE 63 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

70

-

-

... More
ELCB SWITCH THREE PHASE 63 AMPERE 4 POLL-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

50

-

-

... More
ELCB SWITCH THREE PHASE 63 AMPERE 4 POLL-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

80

-

-

... More
ELCB SWITCH THREE PHASE 100 AMPERE 4 POLL-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
ELCB SWITCH THREE PHASE 100 AMPERE 4 POLL-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
3.5 KV UPS 4 HOUR BACKUP-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

25

-

-

... More
3.5 KV UPS 4 HOUR BACKUP-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

25

-

-

... More
3.5 KV UPS 4 HOUR BACKUP-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

35

-

-

... More
SPLIT AC 1.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SPLIT AC 1.5 TON-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
SPLIT AC 1.5 TON-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
SPLIT AC 2.5 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
SPLIT AC 2.5 TON-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
TOWER AC 2 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
TOWER AC 2 TON-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

5

-

-

... More
TOWER AC 4 TON-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

40

-

-

... More
TOWER AC 4 TON-2 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
TOWER AC 4 TON-3 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

20

-

-

... More
TOWER AC 4 TON-30 TO 45 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

10

-

-

... More
Ductoable AC unit 5 to 6 Ton-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

7

-

-

... More
Ductoable AC unit 7 to 10 Ton-1 DAY , WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT

7

-

-

... More
TOILET CHEMICAL-1 DAY , TOILET CHEMICAL

5

-

-

... More
TOILET GENERAL-1 DAY , TOILET GENERAL-1 DAY

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.