Border Security Force Tender
Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.
Costs
EMD
₹ 3,02,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dry Dock Repair Of Mechanized Boat Sindhu
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSF_789167_1Bid Award Id
ViewTender No
WW/Bhuj/M/881/DDR-MB Sindhu/2024/163 dt.05.01.24Tender Authority
Border Security Force ViewPurchaser Address
-Website
http://http://bsf.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
In side passenger cabin and pilot house side wall required lamination and FRP work.
1
-
-
All FRP body to be checked and required to be repaired as per IRS recommendation/approved.
1
-
-
i) Complete destructive side fender to be replaced.
1
-
-
ii) All side portable pneumatic fender to be replaced.
1
-
-
All railing to be check, defective and damaged portion to be replaced.
1
-
-
ANCHORING SYSTEM 35 Mtr SS anchor chain 10 mm dia to be provided.
1
-
-
20 Kgs grapnel anchor with rope approximate 19 mm x 120 feet.
1
-
-
Anchor winch and lifting motor required to be replaced.
1
-
-
CABIN
Pilot, passenger seat with back rest and hand rest foam & Rexene to be replaced.
1
-
-
WINDOW CURTAIN All side window glasses curtain required new fitting with curtain. Curtain holder required to be installed.
1
-
-
WIPER
i) Window Wiper along with blades and holder to be replaced.
1
-
-
Window Wiper water spray system to be checked and defective item to be replaced.
1
-
-
Window Wiper motor to be replaced.
1
-
-
MAIN ENGINE AND ENGINE ROOM Main Engine Make and Types- 2 x Cummins, QSB 6.7 4801D1
Ref No QSB6.7 4801NT, Power: 473 HP 3000 RPM. Both the main engine required major overhauling. Other maintenance of main engines and its system to be carried out as per the schedules prescribed by OEM/ Manufacture. Engine Srl No. 74090192 (Stbd) & 74090187 (Port) Engine Model No.-QSB 6.7 INT 473 HP Run Hours (Port) – 7600.00 Hrs, (Stbd)- 7600 Hrs i) Both main engines require ‘D’ check maintenance as per OEM schedule by the authorized service agencies of Cummins Engine.
1
-
-
All sea water line and valve required cleaning by chemical and pressure test. If any found damage/poor condition required to be replaced
1
-
-
Both main engine and gear box mounting and vibration pad required to be replaced.
1
-
-
Both main engines inter cooler and oil cooler required to be replaced with new.
1
-
-
Battery of both main engine-02 x 02 (180 AH)=04 Nos, DG Set-01 no (120AH) and emergency battery-(180 AH)=02 Nos required to be replaced.
1
-
-
Convertor of 24-volt DC to 13.7-volt 10 AMP required replaced.
1
-
-
All destructive safety device required to be replaced
1
-
-
Engine room fan/blower to be serviced.
1
-
-
Blige pump shaft installed and impeller bearing to be replaced and fire pump required to be serviced.
1
-
-
Bilge/fire line with valve required servicing/cleaning by chemical and pressure test if any found damage /poor condition required to be replaced.
1
-
-
Electrical fire pump/ Bilge pump checked and defective item to be replaced.
1
-
-
Complete hose pipe to be checked and damaged hose pipe required to be replaced.
1
-
-
Fire hydrant, hose & nozzle required to be serviced.
1
-
-
Engine alarms check and make functional.
1
-
-
Engine operational instruments servicing and to be functional
1
-
-
Flexible fuel line with clamp required to be replaced.
1
-
-
Turbocharger to be serviced.
1
-
-
Fuel pump servicing & calibration and adjustment as
per specified fuel pressure for marine engine regulation.
1
-
-
Injector (calibration and pressure testing) required.
1
-
-
Defective silencer pipes /flanges/mufflers required to be replaced.
1
-
-
Both main engine Exhaust manifold with clamp required to be replaced & inlet manifold decarburization.
1
-
-
Heat exchanger tube to be servicing.
1
-
-
Fresh water pump kit to be replaced
1
-
-
Both Self-starter required to be replaced.
1
-
-
Sea water cooling valve of both main engine required to be replaced.
1
-
-
All retaining /non-retaining /delivery valves required to be replaced.
1
-
-
Over board discharge valve, sea suction valve to be over hauling and pressure tested.
1
-
-
Wheel gaskets and nuts and bolts of retaining valve and non-retaining valve and discharge valve to be replaced
1
-
-
DG SET 8 KVA DG set required to be replaced with new version
1
-
-
8 KVA alternator required to be replaced
1
-
-
DG set sea water cooling strainer required replaced
1
-
-
one ½’ new mono block pump is required to be provided for use in emergency basis
1
-
-
FIRE ALARM
All fire alarm system to be checked and be made operational and horn system made with 24 volt stainless steel small size dual ( marine grade) is required replaced.
1
-
-
Defective wiring, switches, cables and sensors of fire alarm required replaced.
1
-
-
BLOWERS All blower and exhaust motor to be serviced .
1
-
-
Blower and exhaust fan base required to be repaired.
1
-
-
STEERING SYSTEM:- Hydraulic steering system to be serviced and water seal of rudder to be replaced.
1
-
-
GEAR BOX Both M/E gear box coupling oil seal required to be replaced.
1
-
-
Recommended gear oil as per OEM to be replaced
1
-
-
Gear oil cooler with sensor to be replaced.
1
-
-
Hydro force 12 volt of gear box required replaced.
1
-
-
PROPULSION UNIT Propeller shaft to be replaced
1
-
-
Rudder to be replaced.
1
-
-
Rudder shaft with seal required to be replaced.
1
-
-
Both ‘P’ bracket required re-fitted with proper alignment.
1
-
-
Propeller required to be replaced with proper alignment.
1
-
-
‘P’ bracket bush and gallon bush required to be replaced.
1
-
-
Complete unit alignment with gear box, engine, propeller shaft and propeller
1
-
-
SPECIAL EQUIPMENT
GPS system required checking/servicing with wiring
1
-
-
All navigation lights, deck light/wheel house light & crew cabin light to be made operational and defective items be replaced
1
-
-
Defective bulbs, switches wiring to be replaced 24 Volt and 230 Volt.
1
-
-
Deck panel board defective switches and lights required to be replaced.
1
-
-
ECHO SOUNDER Echo sounder required to be calibrated by authorized dealer and defective item to be replaced
1
-
-
SEARCH LIGHTS
Search light required to be replaced as new version/LED system.
1
-
-
Flood lights required replace with (LED).
1
-
-
Rubber packing of Hatch cover of engine room, wheel house, crew cabin and front deck required to be replaced.
1
-
-
Magnetic compass required to be checked/serviced
1
-
-
LIFE SAVING EQUIPMENT Life raft required newly to install in roof of boat if IRS permit
1
-
-
Hazardous duty life jackets to be replaced.( 6 Nos)
1
-
-
Life buoys SOLAS approved with 30 Mtr life lines to be replaced. (4 Nos)
1
-
-
Life raft to be serviced and refilled. (02 Nos)
1
-
-
Distress signals of the vessel should be replaced. - 01 set
1
-
-
FIRE FIGHTING EQUIPMENT’S:
All fire extinguishers required to be replaced as per FFA plan 6.5kg CO2 type fire extinguisher to be replaced ( 01 No)
1
-
-
i) 6 kg DCP type fire extinguisher to be replaced ( 01 No)
1
-
-
9 ltr Foam (Mechanical type) fire extinguisher to be replaced( 04 Nos)
1
-
-
TANKS
Black water tank (sewage tank) should be cleaned properly
1
-
-
All tank air vent required to be replaced.
1
-
-
TOILET
Toilet system required servicing.
1
-
-
AC & VENTILATIONS
Air conditioning unit required servicing/overhauling and defective item to be replaced
1
-
-
Refilling of refrigeration gas.
1
-
-
Operating panel board check and defective items replace
1
-
-
AC cooling pump required to be replaced.
1
-
-
MISCELLANEOUS
All DC bunks fans to be replaced
1
-
-
All water tight door seal rubber packing required to be replaced and testing to be carried
1
-
-
All door defective locking system required to be replaced.
1
-
-
Water leakage from wheel house roof and crew cabin wall side required repair, if required any sunmica to be replaced
1
-
-
Manual bilge pump required to be replaced.
1
-
-
New fuel tank require with stainless steel metal SS-316 grade, 1000 ltr capacity at mid of the boat in place existing two fuel tank to
reduce their load and exact requirement.
1
-
-
Visual/manual fuel pipe measuring system may be installed outside the tank to check the fuel level. The fuel supply line to both main engine and DG set be made complete.
1
-
-
1 KVA Invertor UPS system required to be provided for emergency lighting.
1
-
-
PLUMBING WORK
All plumbing line of toilet to be cleaned & operational.
1
-
-
Discharge motor be serviced and made operational defective parts be replaced.
1
-
-
Toilet sink motor required to be repaired
1
-
-
Toilet flushing system required repaired
1
-
-
ELECTRIC SIDE
Insulation resistance (merger test) and OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional. All electronic components, controls and wiring used on engine and the boats are to be marine version complying with IP 65 rating. All electrical cable line laying in cable tray.
1
-
-
All electrical panel board with line required checking and be in functional condition.
1
-
-
Complete DC line required to be replaced.
1
-
-
Cabin and exhaust fans with toilet exhaust fan be checked and servicing and make operational. (Defective parts required to be replaced.)
1
-
-
Multi Bty isolator 24Volt DC, 80 AMP 3in, 2 Out required to be provided.
1
-
-
PAINTING
Under water hull surface cleaning and painting Pen guard HB primer (Epoxy primer) 01 Coat – 100 Micron (DFT)
Safe guard universal ES grey tie coat 01 Coat – 100 Micron (DFT) Sea Quantum pro-u light red- 01 coat – 150 micron (DFT) (Silyl Acrylate Anti-fouling self-polishing paint) Sea quantum pro-u-dark red – 01 coat – 150 micron (DFT) (Silyl Acrylate anti-Fouling self-polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fauling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required as per international maritime organization (IMO) scheme
1
-
-
All above water painting as vessel requirement Above water level complete cleaning surface finishing and lamination wherever required and painting as per vessel painting scheme.
1
-
-
All vessel outer body required painting Vessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme
1
-
-
LMG & MMG fitting and LMG & MMG Protection shilled NIJ – level-III & safety guard of gun mount required re-fitted
1
-
-
Bollard and cleat checked and serviced.
1
-
-
Charges for Dry docking /Piloting/Inspection & Insurance
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements