Border Security Force Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Border Security Force - BSF Tender

Works
Furnitures and Fixtures
Eprocure
Opening Date6 Jan 2024
Closing Date19 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Dry Dock Repair Of Mechanized Boat Sindhu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In side passenger cabin and pilot house side wall required lamination and FRP work.

1

-

-

... More
All FRP body to be checked and required to be repaired as per IRS recommendation/approved.

1

-

-

... More
i) Complete destructive side fender to be replaced.

1

-

-

... More
ii) All side portable pneumatic fender to be replaced.

1

-

-

... More
All railing to be check, defective and damaged portion to be replaced.

1

-

-

... More
ANCHORING SYSTEM 35 Mtr SS anchor chain 10 mm dia to be provided.

1

-

-

... More
20 Kgs grapnel anchor with rope approximate 19 mm x 120 feet.

1

-

-

... More
Anchor winch and lifting motor required to be replaced.

1

-

-

... More
CABIN Pilot, passenger seat with back rest and hand rest foam & Rexene to be replaced.

1

-

-

... More
WINDOW CURTAIN All side window glasses curtain required new fitting with curtain. Curtain holder required to be installed.

1

-

-

... More
WIPER i) Window Wiper along with blades and holder to be replaced.

1

-

-

... More
Window Wiper water spray system to be checked and defective item to be replaced.

1

-

-

... More
Window Wiper motor to be replaced.

1

-

-

... More
MAIN ENGINE AND ENGINE ROOM Main Engine Make and Types- 2 x Cummins, QSB 6.7 4801D1 Ref No QSB6.7 4801NT, Power: 473 HP 3000 RPM. Both the main engine required major overhauling. Other maintenance of main engines and its system to be carried out as per the schedules prescribed by OEM/ Manufacture. Engine Srl No. 74090192 (Stbd) & 74090187 (Port) Engine Model No.-QSB 6.7 INT 473 HP Run Hours (Port) – 7600.00 Hrs, (Stbd)- 7600 Hrs i) Both main engines require ‘D’ check maintenance as per OEM schedule by the authorized service agencies of Cummins Engine.

1

-

-

... More
All sea water line and valve required cleaning by chemical and pressure test. If any found damage/poor condition required to be replaced

1

-

-

... More
Both main engine and gear box mounting and vibration pad required to be replaced.

1

-

-

... More
Both main engines inter cooler and oil cooler required to be replaced with new.

1

-

-

... More
Battery of both main engine-02 x 02 (180 AH)=04 Nos, DG Set-01 no (120AH) and emergency battery-(180 AH)=02 Nos required to be replaced.

1

-

-

... More
Convertor of 24-volt DC to 13.7-volt 10 AMP required replaced.

1

-

-

... More
All destructive safety device required to be replaced

1

-

-

... More
Engine room fan/blower to be serviced.

1

-

-

... More
Blige pump shaft installed and impeller bearing to be replaced and fire pump required to be serviced.

1

-

-

... More
Bilge/fire line with valve required servicing/cleaning by chemical and pressure test if any found damage /poor condition required to be replaced.

1

-

-

... More
Electrical fire pump/ Bilge pump checked and defective item to be replaced.

1

-

-

... More
Complete hose pipe to be checked and damaged hose pipe required to be replaced.

1

-

-

... More
Fire hydrant, hose & nozzle required to be serviced.

1

-

-

... More
Engine alarms check and make functional.

1

-

-

... More
Engine operational instruments servicing and to be functional

1

-

-

... More
Flexible fuel line with clamp required to be replaced.

1

-

-

... More
Turbocharger to be serviced.

1

-

-

... More
Fuel pump servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation.

1

-

-

... More
Injector (calibration and pressure testing) required.

1

-

-

... More
Defective silencer pipes /flanges/mufflers required to be replaced.

1

-

-

... More
Both main engine Exhaust manifold with clamp required to be replaced & inlet manifold decarburization.

1

-

-

... More
Heat exchanger tube to be servicing.

1

-

-

... More
Fresh water pump kit to be replaced

1

-

-

... More
Both Self-starter required to be replaced.

1

-

-

... More
Sea water cooling valve of both main engine required to be replaced.

1

-

-

... More
All retaining /non-retaining /delivery valves required to be replaced.

1

-

-

... More
Over board discharge valve, sea suction valve to be over hauling and pressure tested.

1

-

-

... More
Wheel gaskets and nuts and bolts of retaining valve and non-retaining valve and discharge valve to be replaced

1

-

-

... More
DG SET 8 KVA DG set required to be replaced with new version

1

-

-

... More
8 KVA alternator required to be replaced

1

-

-

... More
DG set sea water cooling strainer required replaced

1

-

-

... More
one ½’ new mono block pump is required to be provided for use in emergency basis

1

-

-

... More
FIRE ALARM All fire alarm system to be checked and be made operational and horn system made with 24 volt stainless steel small size dual ( marine grade) is required replaced.

1

-

-

... More
Defective wiring, switches, cables and sensors of fire alarm required replaced.

1

-

-

... More
BLOWERS All blower and exhaust motor to be serviced .

1

-

-

... More
Blower and exhaust fan base required to be repaired.

1

-

-

... More
STEERING SYSTEM:- Hydraulic steering system to be serviced and water seal of rudder to be replaced.

1

-

-

... More
GEAR BOX Both M/E gear box coupling oil seal required to be replaced.

1

-

-

... More
Recommended gear oil as per OEM to be replaced

1

-

-

... More
Gear oil cooler with sensor to be replaced.

1

-

-

... More
Hydro force 12 volt of gear box required replaced.

1

-

-

... More
PROPULSION UNIT Propeller shaft to be replaced

1

-

-

... More
Rudder to be replaced.

1

-

-

... More
Rudder shaft with seal required to be replaced.

1

-

-

... More
Both ‘P’ bracket required re-fitted with proper alignment.

1

-

-

... More
Propeller required to be replaced with proper alignment.

1

-

-

... More
‘P’ bracket bush and gallon bush required to be replaced.

1

-

-

... More
Complete unit alignment with gear box, engine, propeller shaft and propeller

1

-

-

... More
SPECIAL EQUIPMENT GPS system required checking/servicing with wiring

1

-

-

... More
All navigation lights, deck light/wheel house light & crew cabin light to be made operational and defective items be replaced

1

-

-

... More
Defective bulbs, switches wiring to be replaced 24 Volt and 230 Volt.

1

-

-

... More
Deck panel board defective switches and lights required to be replaced.

1

-

-

... More
ECHO SOUNDER Echo sounder required to be calibrated by authorized dealer and defective item to be replaced

1

-

-

... More
SEARCH LIGHTS Search light required to be replaced as new version/LED system.

1

-

-

... More
Flood lights required replace with (LED).

1

-

-

... More
Rubber packing of Hatch cover of engine room, wheel house, crew cabin and front deck required to be replaced.

1

-

-

... More
Magnetic compass required to be checked/serviced

1

-

-

... More
LIFE SAVING EQUIPMENT Life raft required newly to install in roof of boat if IRS permit

1

-

-

... More
Hazardous duty life jackets to be replaced.( 6 Nos)

1

-

-

... More
Life buoys SOLAS approved with 30 Mtr life lines to be replaced. (4 Nos)

1

-

-

... More
Life raft to be serviced and refilled. (02 Nos)

1

-

-

... More
Distress signals of the vessel should be replaced. - 01 set

1

-

-

... More
FIRE FIGHTING EQUIPMENT’S: All fire extinguishers required to be replaced as per FFA plan 6.5kg CO2 type fire extinguisher to be replaced ( 01 No)

1

-

-

... More
i) 6 kg DCP type fire extinguisher to be replaced ( 01 No)

1

-

-

... More
9 ltr Foam (Mechanical type) fire extinguisher to be replaced( 04 Nos)

1

-

-

... More
TANKS Black water tank (sewage tank) should be cleaned properly

1

-

-

... More
All tank air vent required to be replaced.

1

-

-

... More
TOILET Toilet system required servicing.

1

-

-

... More
AC & VENTILATIONS Air conditioning unit required servicing/overhauling and defective item to be replaced

1

-

-

... More
Refilling of refrigeration gas.

1

-

-

... More
Operating panel board check and defective items replace

1

-

-

... More
AC cooling pump required to be replaced.

1

-

-

... More
MISCELLANEOUS All DC bunks fans to be replaced

1

-

-

... More
All water tight door seal rubber packing required to be replaced and testing to be carried

1

-

-

... More
All door defective locking system required to be replaced.

1

-

-

... More
Water leakage from wheel house roof and crew cabin wall side required repair, if required any sunmica to be replaced

1

-

-

... More
Manual bilge pump required to be replaced.

1

-

-

... More
New fuel tank require with stainless steel metal SS-316 grade, 1000 ltr capacity at mid of the boat in place existing two fuel tank to reduce their load and exact requirement.

1

-

-

... More
Visual/manual fuel pipe measuring system may be installed outside the tank to check the fuel level. The fuel supply line to both main engine and DG set be made complete.

1

-

-

... More
1 KVA Invertor UPS system required to be provided for emergency lighting.

1

-

-

... More
PLUMBING WORK All plumbing line of toilet to be cleaned & operational.

1

-

-

... More
Discharge motor be serviced and made operational defective parts be replaced.

1

-

-

... More
Toilet sink motor required to be repaired

1

-

-

... More
Toilet flushing system required repaired

1

-

-

... More
ELECTRIC SIDE Insulation resistance (merger test) and OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional. All electronic components, controls and wiring used on engine and the boats are to be marine version complying with IP 65 rating. All electrical cable line laying in cable tray.

1

-

-

... More
All electrical panel board with line required checking and be in functional condition.

1

-

-

... More
Complete DC line required to be replaced.

1

-

-

... More
Cabin and exhaust fans with toilet exhaust fan be checked and servicing and make  operational. (Defective parts required to be replaced.)

1

-

-

... More
Multi Bty isolator 24Volt DC, 80 AMP 3in, 2 Out required to be provided.

1

-

-

... More
PAINTING Under water hull surface cleaning and painting Pen guard HB primer (Epoxy primer) 01 Coat – 100 Micron (DFT) Safe guard universal ES grey tie coat 01 Coat – 100 Micron (DFT) Sea Quantum pro-u light red- 01 coat – 150 micron (DFT) (Silyl Acrylate Anti-fouling self-polishing paint) Sea quantum pro-u-dark red – 01 coat – 150 micron (DFT) (Silyl Acrylate anti-Fouling self-polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fauling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required as per international maritime organization (IMO) scheme

1

-

-

... More
All above water painting as vessel requirement Above water level complete cleaning surface finishing and lamination wherever required and painting as per vessel painting scheme.

1

-

-

... More
All vessel outer body required painting Vessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme

1

-

-

... More
LMG & MMG fitting and LMG & MMG Protection shilled NIJ – level-III & safety guard of gun mount required re-fitted

1

-

-

... More
Bollard and cleat checked and serviced.

1

-

-

... More
Charges for Dry docking /Piloting/Inspection & Insurance

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.