Zilla Panchayat Tender
View complete overview of Goa Zilla Panchayat Tender
Costs
EMD
₹ 23,751Document Cost
₹ 5,000Tender Fee
₹ 2,375
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZP_18481_1Bid Award Id
ViewTender No
3/6/SGZP/2024-25/TN-161/L5Tender Authority
Zilla Panchayat ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead
of 50 m.
a)All kinds of soil
72
291
20952
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
14.4
2211
31838.4
... More
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering,
shuttering and finishing : a)All works upto plinth level
30.6
6635
203031
... More
Centering and shuttering including struttings, propping etc. and removal of formwork for :(a) Foundations, footings, bases for columns and mass concrete.
120
407
48840
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements