Zilla Panchayat Tender
View complete overview of Goa Zilla Panchayat Tender
Costs
EMD
₹ 9,900Document Cost
₹ 2,000Tender Fee
₹ 990
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZP_14505_1Bid Award Id
ViewTender No
NGZP/37/23-24/39/1518/L5Tender Authority
Zilla Panchayat ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :
-
-
-
All works upto plinth level
59.48
394649
6635
Centering and shuttering including struttings, propping etc. and removal of formwork for :
-
-
-
Foundations, footings, bases for columns and mass concrete.
178.97
72840
407
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge
-
-
-
B) 75 mm dia
12
2220
185
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
9.75
2388
245
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements