Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 45,615Document Cost
₹ 3,000Tender Fee
₹ 4,562
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_17052_1Bid Award Id
ViewTender No
WDII/TECH/F17/11e/2024-25/SN4Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
51.36
-
-
Centering and shuttering including struttings, propping etc. and removal of formwork for :
Foundations, footings, bases for columns and mass concrete.
103.6
-
-
vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
99.2
-
-
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
All works upto plinth level
72
-
-
In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
55.85
-
-
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level.
19.95
-
-
Centering & shuttering including Strutting, Propping & removal of forms for :
Suspended floors, roofs landings, shelves & their supports
51.87
-
-
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
4149.6
-
-
Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows complete with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete.
14
-
-
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
87.6
-
-