Water Resources Department Tender

View complete overview of Goa WRD Tender

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date6 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 22,85,566 
Notes
Download

Costs

  • EMD

    ₹ 45,711
  • Document Cost

    ₹ 3,000
  • Tender Fee

    ₹ 4,571

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : a)All kinds of soil

54.26

-

-

... More
Earthwork in embankment with soil cement mix 300 mm thick with 10% cement and 90% approved material ( contractor’s earth ) including all lifts, leads, laying in layers not exceeding 100 mm thickness, controlled method of compaction as approved by Engineer-in-charge to the required dry density at requisite moisture etc. complete.

43.41

-

-

... More
Providing construction joints in canal lining with in situ sleepers in case of bed pre cast in case of sides both of size 150 X 75 mm section in cement concrete 1 : 1½ : 3 ( 1 cement : 1½ coarse sand : 3 graded granitic or basaltic stone aggregate of 20 mm nominal size ) incl. Centering and shuttering, curing etc. complete and using bitumen and sealing compound of approved quality in joints as specified and directed by Engineer in charge.

118.16

-

-

... More
Providing and laying in position 50 mm thick cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering and finishing etc. for preparing sub grade for laying RCC Canal lining .

1016.18

-

-

... More
Centering & shuttering incl strutting, propping & removal of formwork for a) Foundations, Footings, Bases for columns

32.82

-

-

... More
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers(Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.

3375.73

-

-

... More
Providing and laying in position 100 mm thick (1 : 1.5:3) reinforced cement concrete lining (1 cement : 1.5 coarse sand:3 graded granitic or basaltic stone aggregate of 20mm nominal size) excl cost of centering , shuttering and reinforcement, but incl waterproofing compound of approved quality with ramming and consolidating curing and finishing the surface with cement mortar 1:3 (1 cement ;3 fine sand) 6 mm thick as specified and directed by Engineer in charge etc complete with all leads and lifts

1033.9

-

-

... More
Neat cement punning

1033.9

-

-

... More
Providing & laying cement concrete 1: 1.5: 3 (1cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level

0.59

-

-

... More
Construction of Embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, breaking clods, spreading, watering, rolling each layer of 300 mm in depth by wooden or steel rammer including rolling top most layer with steel rammers & dressing up in embankment of roads, canals, marginal banks, & guide banks etc complete.

52.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.