Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 19,512Document Cost
₹ 3,000Tender Fee
₹ 1,951
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_18190_1Bid Award Id
ViewTender No
WDX/Accts./2024-25/e-03 sr 02Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dissembly and assembly of Kirloskar 170 HP Removal of pump impellor and shifting to workshop for machining sleeve inclusive of transportation. Fitment of bearings. Replacing with new grease. Changing gland packing. Cleaning and painting the pump inclusive of oil paper, cleaning cloth, nuts and bolts etc. (Cost of bearings not included, consumables cost included)
4
-
-
Bearings for Pump 6319 ZZ C3
8
-
-
Sleeve for Pump
8
-
-
Copuling pin bush for Pump
4
-
-
Shifting of Horizontal Pump & Motor Three phase AC Induction motor Kirloskar pump and motor 170 HP from Godown to Foundation 01 and 02 for installtion and removing back and shifting to godown.
4
-
-
Laser alignment of motors inclusive of shims etc. complete under supervision of Mechanical engineer from Industrial Training Institute.
4
-
-
Cleaning of starter of control pannel including cleaning of bushes, contactors and megger testing. (Pump No 1,2). Motor termination leads to be checked and providing Thick copper washer required for better contact as cable is heating. Dressing of cables, Checking power contacts of power contactor. Replacement of power contactor if contacts are worn out.. Main Panel control wiring to be checked. Checking of local push button stations of motor starters. Checking earth connections of all equipments.
3
-
-
Vibration monitoring of pump & motor.(3 visits that is December, February and May)
3
-
-
Visit charges for Breakdown calls / routine maintenance during operation of pump motor.
5
-
-
Servicing of chain block with spares including removal and refittment of chain block, disassembly, replacement of spares like friction washer, load wheel, safety latch, bearing etc.
1
-
-
Thermography of electrical instn allatio including Transformer(3 visits that is December, February and May)
3
-
-
Servicing of pump at Gawaliwada site. Monoblock Pump-Motor- Three phase AC Induction motor Make: Kirloskar 10 HP 1450 RPM.Removal and refitment of pump, Dissembly and assembly of electric motor 10 HP. Cleaning the winding with solvant and varnishing. Painting the motor. Replacing with new bearing and grease. Wrapping the insulation wherever necessary and refit.
2
-
-
Bearings for Motor
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements