Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 16,310Document Cost
₹ 3,000Tender Fee
₹ 1,631
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WRD_5517_1Bid Award Id
ViewTender No
WDX/Accts/2022-23/e-02 Sr 01Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : a)All kinds of soil
61.28
-
-
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
15.56
-
-
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:complete. a)All works upto plinth level
7.78
-
-
Centering and shuttering including struttings, propping etc. and removal of formwork for : c)Columns, Pillars ,piers, abutm-ents, posts and strut, square, rectangular, polygon in plan. etc.
308.08
-
-
Pre-cast cement concrete solid block masonry of compressive strength 70 kg / cm2 in cement mortar 1:4 (1 cement : 4 corase sand ) in foundation and plinth size of blocks (30 x 20 x 15) in foundation and plinth
2.08
-
-
Providing High yield strength steel
reinforcement bar (HYSD)/TMT steel
reinforcement bar from secondary producers(Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes
whose compressive strength is not less than that of surrounding concrete in the structural member.
510.99
-
-
Providing & laying cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size)excluding cost of centering, shuttering and finishing in: b)In retaining walls , return walls(any thk)
including attached pilasters,columns,piers,abutments, pillars, posts, struts, buttresses,string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
20.26
-
-
Providing and laying in position (1:2:4)reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement. (1 cement:2 coarse sand:4 graded stone agg 20mm nominal size) b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses,fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level
10.23
-
-
Transportation and Carriage of various diameters R.C.C. full round pipes including collars from stack place at Quepem to site e)300mmØ half round RCC pipes Rate for 100mts 2246.35+(5x160.38)=3048.25/2 =1524.13
12.5
-
-
h)450mmØ half round RCC pipes Rate for 100mts 5455.41+(5x389.49)=7402.86/2 =3701.43
37.5
-
-
i ) 600,700,750,800 mm dia Rate for 100mts 7637.58+(5x545.28)=10363.98/2 =5181.99
15
-
-
Laying in position and jointing true to line and level R.C.C. half round pipes with cement mortar 1:2 ( 1 cement : 2 fine sand ) including cleaning if any, all leads and lifts, curing etc. complete as per the direction of Engineer-in-charge. a)750mmØ half round RCC pipes
45
-
-
b)450mmØ half round RCC pipes
222.5
-
-
c)300mmØ half round RCC pipes
160
-
-
Cleaning and rectifying the old joints in HRP including jointing the pipes true to line and level with cement mortar 1 : 2 ( 1 cement : 2 fine sand ) curing etc. complete as per the direction of Engineer-in-charge. a)750mmØ half round RCC pipes
150
-
-
b)450mmØ half round RCC pipes
300
-
-
c)300mmØ half round RCC pipes
75
-
-
12mm cement plaster 1:4 (1 cement : 4 fine sand)
136.38
-
-
Neat Cement punning
136.38
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements