Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 1,14,000Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_GOA_786341_1Bid Award Id
ViewTender No
NHP/GOA/RFQ/Works/08Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://https://goawrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
CEILING PANELS -False ceiling panels are designed to fit within each other and suspended by threaded tension bars with adjustable turnbuckles fastened to the overhead support at fixed intervals, Standard Ceiling Panels are 50 mm thick and have a composite construction of two skins of PPGI / PPGI over an frame work with a sealed and insulated interior.
a.(SS+PCGI: One side SS sheet & other side PCGI Sheet-CEILING PANELS) Load bearing walk on clean room double skin ceiling(Thickness - 80/50 mm) with PIR infill material sandwiched between the panels including making provision for HVAC SA/RA, electrical light fixtures, sleeves utilities (Pendants, Sleeves) etc. by providing required sizes of cutout/opening etc. complete.
b. (PPGI+PPGI sheet Both Side-CEILING PANELS) Load bearing walk on clean room double skin ceiling(Thickness - 80/50 mm) with PIR infill material sandwiched between the panels including making provision for HVAC SA/RA, electrical light fixtures, sleeves utilities (Pendants, Sleeves) etc. by providing required sizes of cutout/opening etc. complete.
-
-
-
CEILING PANEL OF 50 MM THICK (0.6mm PCGI/PCGI)-Providing of ceiling 50mm thick with using 0.6mm thick PPGI sheet on both side finished with PUF insulation. GI Suspension Rod for hanging Ceiling Panel above 1mt will (GI Profile)
80
-
-
Coving
-
-
-
The Aluminium Powder coated coving of required radius/size shall be fixed on Aluminium frame work of angle and flats.
150
-
-
The Aluminium Powder coated coving of required radius/size shall be fixed on Aluminium frame work of angle and flats. The required jointing fixtures like 2D/3D shall be fixed at required locations. Corners caps should be fixed at all corners. The coving shall be wall to wall. The workmanship as regards line, level and plumb should be of high standard.
56
-
-
Providing and fixing cuts out in ceiling panels for light fixtures & Diffusers complete
22
-
-
Providing and Fixing cut out in walls panels for electrical and gas sockets
15
-
-
PVC Conduit pipe
55
-
-
Doors/Windows/View Panels in CRP Work -Doors are designed to fit flush into the wall panel system on both sides and are supplied in different dimensions. Doors are fabricated from GI Powdered coated Sheets. Shutter has sheet thickness of 0.8mm and the frame of 1.2mm. Standard 50/80/100 mm panel has frame width of 50/60/80 mm and shutter width of 41mm. Doors are available in various sizes as per the requirement of the client. The following accessories are a part of the door: Shutter Thickness: 41 mm thick, S.S Ball Bearing Hinges, Stainless Steel 'D' type of handles on Both Side, Stainless steel push plates on push side. - SS 304, Door Closer Standard arm (Make GIZO) Full Plane Toughened View Glass along with Black border and silicon sealant , Both side key operated locking arrangement Automatic door bottom seal at the bottom ,Stainless Steel kick plates SS 304 (not required), Filler material : PUF ,Concealed Tower Bolt (Only for Double Door)
-
-
-
Flush Double door (D1) 1000X2100mm (Clear opening) including SS hinges & flush view panel 450x700 mm flush to partition wall panels including required ironmongery and automatic door closer.(TS-73 - Dorma or eq.)
2
-
-
Flush Single door (D3) 900X2100mm (Clear opening) including SS hinges & flush view panel 450x700 mm flush to partition wall panels including required ironmongery and automatic door closer.(TS73/TS-68 Dorma or eq.)
5
-
-
Flush Double door (D2) 750 X2100mm (Clear opening) including SS hinges & flush view panel 300x700 mm flush to partition wall panels with frosted glass including required ironmongery and automatic door closer.(TS-68 Dorma or eq.)
8
-
-
LIGHTS -Lights ( Cutouts ) Extra afterwards
-
-
-
Cutouts (600 x 600 mm)
25
-
-
Cutouts (300 x 300 mm)
24
-
-
Cutouts (600 x 300 mm) FLP
25
-
-
Electrical Modular switch boards
50
-
-
Electrical Industrial Socket Outlets
25
-
-
Door Interlock System Included
12
-
-
Epoxy flooring
-
-
-
Providing & applying of 3mm Golssy finish based flooring with epoxy system, including surface preparation with diamond grinding followed by application of high build epoxy based primer 200 micron which is further followed by Screed 1800 Micron & topping of finish epoxy PU coat 1mm Micron as per CIPY Polyurethane pvt ltd recommendation
90
-
-
Two part Rasine, One Part Harner, One motor sand, Putty finishing, Top coat PU coating
160
-
-
AAS Chemical (Lab Section)
-
-
-
Dismantling, Removing and Resizing and Reusing for Modification Alteration to Existing laboratory of Aluminium Partition and re fitting for NABL Accreditation at Data Centre Laboratory at Sinchai Bhawan complex Porvorim. With material complete. As per standard Specification and engineer incharge. Standard lab SPECIFICATION
50
-
-
Providing with Aluminium partition, particles Boards with 5mm thick Aluminium Frames with white powder coated , 5 mm Glass , Door with hinges and powder coated with lock door closure and accessories for Modification Alteration to Existing laboratory partition for NABL Accreditation at Data Centre Laboratory at Sinchai Bhawan complex Porvorim. With material complete. As per standard Specification and engineer incharge . Standard lab SPECIFICATION
357.03
-
-
Labour Charges for installation and fixing at site with complete at Sinchai Bhawan Porvorim Modification Alteration to Existing laboratory partition for NABL Accreditation at Data Centre Laboratory at Sinchai Bhawan complex Porvorim. Providing, supplying and fixing with Labour charges with Aluminium Partitions, Particle Boards accessories Complete at Sinchai Bhawan. With material complete. As per standard Specification and engineer incharge . Standard lab SPECIFICATION
357.03
-
-
Gas Bank ( Campus Ground Floor)
-
-
-
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : a) All kinds of soil
0.63
-
-
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
0.63
-
-
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :a) All works upto plinth level.
0.63
-
-
Providing and fixing with M S Square bars of fully water proof samco brand PVC-WPS shield sandwiched along with 10mm thick thermocol sheet and 12mm fully water proof DU’K brand plywood cutted into different sizes as per requirement of the designed gas chamber providing fully water resistant, fire resistant and heat resistant to the gas chamber as per the specification design and instructions of the Engineer Incharge
157
-
-
providing Fixing with MS Square tube with M.S.Wire mesh 25*25*2.90- 4 feet machine cutted into various sizes to cover the exposed areas of GAS CHAMBER to create heat sink and ventilation to the GAS CHAMBER as per the design and specification as directed by the Engineer incharge.
165
-
-
Providing 0.45mm brick red JSW colouron+ sheet along with celing base to hold fully water resistant heat resistant and fire resistant PVC-WPS shield for the designed GAS Chamber to create the safest environment as directed by the engineer in charge
73.41
-
-
Spray Painting of the GAS CHAMBER using compressor with two coats of RED OXIDE and two coats of oil paint Asian paint brand of desired colour as instructed by the engineer incharge
622.22
-
-
Providing and fixing of led Electrical 25 watt light along with wires and switch etc .as directed by the engineer in charge
16
-
-
Providing and fixing of ceiling fan along with wires and switch etc .as directed by the engineer in charge
18
-
-
Providing and fixing exhaust fan creating prevention before entering the lab premises as per standard Specification & as directed by the engineer in charge.
3
-
-
Rates quoted by Contractor for each item should be inclusive of GST
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements