Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 47,329Document Cost
₹ 3,000Tender Fee
₹ 4,733
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_13912_1Bid Award Id
ViewTender No
WDXII/TECH/F10/22e/2023-24/sr1Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing & laying cement concrete 1: 2: 4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
166.98
-
-
Laterite Boulder masonary in cement mortor 1:3 in foundation
93.84
-
-
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a) Upto 2.5 meters long pile
230
-
-
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured): a) Upto 2.5 meters long pile Metre
230
-
-
Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. : b) Moorum
103.5
-
-
b)In tees, angles, flats and channels
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements