Water Resources Department Tender

View complete overview of Goa WRD Tender

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Aug 2024
Closing Date21 Aug 2024
Tender Amount₹ 1,46,83,252 
Notes
Download

Costs

  • EMD

    ₹ 2,93,665
  • Document Cost

    ₹ 8,000
  • Tender Fee

    ₹ 6,000

Summary

Construction Of Protection Wall From Bagwada Bridge To Pramod Mhadeshwar House At Morlem

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & Laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering shuttering and finishing in: b) In retaining walls, return walls (any thk) including attached pilasters, columns, piers, abutments, pillars, post, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.

995

-

-

... More
Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundations, footings, bases for columns and mass concrete.

360

-

-

... More
Centering and shuttering including struttings, propping etc. and removal of formworks for: b) vertical surfaces such as retaining walls, return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.

1269

-

-

... More
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge :- 110 mm dia

601

-

-

... More
Providing and Fixing construction joint with 20 mm thick thermocol sheets at specific intervals in Retaining wall.

148

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 as per MORTH specification 305.

1219

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.