Water Resources Department Tender

View complete overview of Goa WRD Tender

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Mar 2025
Closing Date3 Apr 2025
Tender Amount₹ 13,26,132 
Notes
Download

Costs

  • EMD

    ₹ 26,530
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,652

Summary

Construction Of Flood Protection Wall For Sy. No.9/1 And 9/2 At Calvim, V.p. Aldona In Aldona Consituency.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

19

-

-

... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level

98

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.

144

-

-

... More
Laterite boulder masonry in cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate of 20 mm nominal size ) in foundation.

48

-

-

... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.

24

-

-

... More
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge: b) 75 mm dia

16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.