Water Resources Department Tender

View complete overview of Goa WRD Tender

Water Resources Department - WRD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date21 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 3,66,66,445 
Notes
Download

Costs

  • EMD

    ₹ 7,33,329
  • Document Cost

    ₹ 15,000
  • Tender Fee

    ₹ 6,000

Summary

Strengthening Of Existing Saline Bund To Protect Betkator Khazan In Village Betki In V.p. Borim Of Shiroda Constituency

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Driving down wooden piles of 200mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) a) Upto 2.50m long pile

4950

-

-

... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.

526.5

-

-

... More
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.

2082.12

-

-

... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.

1388.24

-

-

... More
Laterite boulder masonry in Cement concrete 1:3:6 (1 Cement: 3 Coarse sand: 6 graded stone aggregate of 20mm size) in foundation

2131.27

-

-

... More
Earthwork in Embankment with approved earth (Contractor earth)/moorum including spreading the earth in layers not exceeding 250mm, in depth, breaking clods, rolling each layer with half ton roller or wooden or steel hammer including fifting up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer-in-Charge

3694.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.