Water Resources Department Tender

View complete overview of Goa WRD Tender

Water Resources Department - WRD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date30 Jan 2024
Closing Date14 Feb 2024
Tender Amount₹ 13,37,295 
Notes
Download

Costs

  • EMD

    ₹ 26,750
  • Document Cost

    ₹ 3,000
  • Tender Fee

    ₹ 2,675

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including strutting, propping and removal of forms for : a) Foundations, footings, bases for columns

10.4

-

-

... More
b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.

68.7

-

-

... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level

8

-

-

... More
b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.

47.24

-

-

... More
Centering and shuttering including strutting, propping and removal of forms for : xiii)Suspended floors, roofs landings, shelves & their supports

56.14

-

-

... More
Reinforced cement concrete work (1:1½:3) (1 cement:1½ coarse sand: 3 graded granitic or basaltic aggregate 20mm nominal size)in suspended floors, roofs, landings, shelves and their supports and balconies upto floor five level including finishing and plastering the ceiling with C.M. (1:3) (1 cement: 3 fine sand) of thickness not exceeding 6mm to give a smooth and even surface but excluding the cost of centering and shuttering

13.9

-

-

... More
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.

1251

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.