Water Resources Department Tender
View complete overview of Goa WRD Tender
Costs
EMD
₹ 13,910Document Cost
₹ 3,000Tender Fee
₹ 1,391
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_17422_1Tender No
6-9/WDI/WRD/ASW/2024-25/e-09/3Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Centering & shuttering including Strutting, Propping & removal of forms for : i) Foundations, footings, bases for columns and mass concrete.
83
-
-
Providing and fixing of weep holes with rigid PVC make laid in position with a required slope and level while laying pipe of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer-in-charge. (B) 75 mm dia
15
-
-
Providing and fixing in position S.S. hand rail in main stair case, and landing as per approved design shown in the drawing including bending handrail pipe to proper shape in curves with specials, etc. complete.
17.5
-
-
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.
1
-
-
Precast plain cement chequered tiles 22 mm thick of required shades laid in floors, treads of steps and landing on 20 mm thick bed of Cement mortar 1:4 (1cement : 4 coarse sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete. a) Light shade using white cement
62
-
-
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a)Upto 2.5 meters long pile
45
-
-
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) a)Upto 2.5 meters long pile
45
-
-
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
11
-
-