Water Resources Department Tender
Calculate bid estimation of Goa WRD Tender
Costs
EMD
₹ 13,451Document Cost
₹ 3,000Tender Fee
₹ 1,345
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRD_19186_1Bid Award Id
ViewTender No
WDXII/TECH/F10/17e/2024-25 /sr5Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge. A) 110mm Dia.
46
-
-
... More
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock,ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, stritting and bracing, removal of stump and other deleterious matter, dresing of sides and bottom, providng barricading, danger lightining, guarding etc and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge complete.
113.4
-
-