Village Panchayat Tender
View complete overview of Goa Village Panchayat Tender
Costs
EMD
₹ 17,172Document Cost
₹ 3,000Tender Fee
₹ 1,717
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_VP_11421_1Bid Award Id
ViewTender No
VPP/Tender Notice/2023-24/558Tender Authority
Village Panchayat ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
10.05
15569
1549.2
... More
Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and
finishing in:
-
-
-
... More
a)All works upto plinth level
8.04
51673
6427
... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 5 (1 cement : 5 coarse sand) in foundation and basement.
75.68
391871
5178
... More
12mm cement plaster 1:5 (1 cement : 5 fine sand)
436.48
96898
222
... More
Refilling the pipeline/foundation trenches plinth sides,foundation etc.with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
139.39
30442
218.4
... More
Providing and laying factory made Shot blasted cement concrete interlocking paver block of minimum M35/M40 grade made by heavyduty block making machine with strong vibratory compaction and of aprpoved size and design / shape laid in 50 mm thick compacted bed of coarse sand, filling the joints with coarse sand, etc. all complete as per the direction of Engineer.- in I, Wave, Rectangular, Square etc. shapes. The products should comply to IS 15658:2006 and manfucatured by ISO9001: 2008 certified plant.The shot blasting should be done using 0.4-0.5mm dia steel shots with a speed of 3200 rpm.a) 60 mm thick in all colours except grey (M35 grade)
101.48
185830
1831.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements