Village Panchayat Tender

View complete overview of Goa Village Panchayat Tender

Village Panchayat Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Date20 Dec 2024
Tender Amount₹ 19,10,907 
Notes
Download

Costs

  • EMD

    ₹ 38,218
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 3,822

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:

-

-

-

... More
a) All work s upto plinth level.

24.54

6810

167117.4

... More
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement.

217.82

5186

1129614.52

... More
Centering & shuttering including Strutting, Propping & removal of forms for :

-

-

-

... More
i) Foundations, Footings, Bases for columns

9.7

407

3947.9

... More
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earthin layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 Mand all lifts and disposal of surplus earth as directed by Engineer in Charge.

39.69

245

9724.05

... More
12mm cement plaster 1:4 (1 cement : 4 fine sand)

1224.75

223

273119.25

... More
White washing with whiting on new work ( three or more coats) to give an even shade.

1224.75

58

71035.5

... More
Distempering two or more coats with oil bound washable distemper of approved brand and manufacture and of required shade on new work over and including a priming coat with distemper primer of approved brand and manufacture to give an even shade.

1224.75

124

151869

... More
Providing and fixing prefabricated compound gate of G.I. pipes 40 – 50 mm dia (medium) with 12mm M.S. square bars of G.I. pipes grill work as per drawing including providing & fixing locking arrangements, pintals, hold fast embedded in cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 granitic or basaltic aggreate 20mm nominal size) including applying priming coat with ready mixed red lead paint and painting 2 or more coats with superior ready mixed paint of approved brand and manufacture in all shades as per direction complete.

6

5352

32112



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.