Village Panchayat Tender

View complete overview of Goa Village Panchayat Tender

Village Panchayat Tender

Works
Civil And Construction
Eprocure
Opening Date25 Sep 2024
Closing Date11 Oct 2024
Tender Amount₹ 5,10,803 
Notes
Download

Costs

  • EMD

    ₹ 10,216
  • Document Cost

    ₹ 3,000
  • Tender Fee

    ₹ 1,022

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cementconcrete 1:2:4 (1 cement : 2 coarse sand: 4graded granitic or basaltic stone aggregate 40 mnominal size) excluding cost of centering,shuttering and finishing :a) All works upto plinth level

43.79

290546

6635

... More
Centering and shuttering including struttings,propping etc. and removal of formwork for : Foundations, Footings, Bases for columns.

104.52

42539

407

... More
Providing and laying in position cementconcrete 1:2:4 (1 cement : 2 coarse sand: 4graded granitic or basaltic stone aggregate 40 mnominal size) excluding cost of centering,shuttering and finishing b)In retaining walls , return walls(any thk)including attached pilasters, columns, piers,abutments, pillars, posts, struts, buttresses,string or lacing courses, parapets, coping bedblocks, anchor blocks, plain window sills, filletsetc, upto floor five level.

7.96

59238

7442

... More
Centering and shuttering including struttings,propping etc. and removal of formwork for : ) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses,fillets, etc.

47.06

22541

479

... More
Providing and fixing eepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining retaining structure complete as directed by the wall, wing wall and earthEngineer in charge a) 110 mm dia

15.6

5662

363

... More
Refilling th pipeline/foundation trenches plinth sides, foundation etc. with avalilable excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 50m and all lifts and disposal of surplus earth as directed by Engineer in charge

18.2

4459

245

... More
Providing and fixing 40 mm dia G.I. Pipe railing in 3 rows completes with G.I. Fittings incl. Painting of pipes and fittings with white paint of approved quality incl. A priming coat with a ready mixed primer for new works incl. Providing R.C.C. 1:2:4 rail posts of size 0.15 x 0.15 x 1.00 M with base of 0.25 x 0.25 x 0.3 m at every 2 mts intervals and double rail post with a bar drawings inclusive of cost of reinforcement etc. all complete including white wash washing of rail posts etc. all complete.

26

25246

971

... More
18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge.

11.1

3651

329

... More
Finishing wall with superior quality waterproofing cement paint (super snow hem or equivalent) of required shade on new work (three or more coats) to give an even shade.

11.1

1143

103



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.