Sewage And Infrastructure Development Corporation Of Goa Limited Tender

View complete overview of Goa SIDCGL Tender

Sewage And Infrastructure Development Corporation Of Goa Limited - SIDCGL Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Nov 2024
Closing Date29 Nov 2024
Tender Amount₹ 8,09,04,453 
Notes
Download

Costs

  • EMD

    ₹ 16,18,090
  • Document Cost

    ₹ 25,000
  • Tender Fee

    ₹ 6,000

Summary

Providing, Laying, Testing And Commi. Of Sewerage Network By Horizontal Directional Drilling (hdd) Including Const. Of Manholes, Provision Of Rd Crossing For Hsc And Reinstatement Of Rd In Durbhat Vill. Of Pondatal. And Its Surr. Areas Zone1 Ph3

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
200 mm

2099.6

145

304442

... More
Conducting ground penetrating radar survey in corridor of 4-6 meter width to deduct buried untilities like pipes,cables etc. in such corridor with information of locations & depth to the top of various untilities detected. Work to be conducted using 500 MHz & 300 MHz antenna for best possible resolution & penetration. along the 6 mt wide road corridor

2099.6

69

144872.4

... More
Conducting Sesmic Refraction Survey to determine stratigraphy along proposed route i.e. soil wethered rock, rock interfaces. Detection of faults ,fractures ,shears zones etc.,in the investigated area.Geophone spacing 5m, test to be conducted using 24 channel signal enhancement type seismograph 5m Geophone Spacing & for projects having minimum length of 115m

2099.6

371

778951.6

... More
Conducting Electrical Tomography tp determine shallow stratigraphy along the route, presence of voids, saturation zones , water table & other geogical features having contrast in resistivity with the surrounding soils. Electrode spacing 5 meters , minimum electrode spread of 60electodes 5m. Electrode spacing & for projects having a minimum length of 300m

2099.6

258

541696.8

... More
Excavation of Shafts for pipe jacking/ramming purpose in soil inclusive of all shuttering, strutting, and shoring and maiunttaining the shafts during construction operation and backfilling the same after the complition of work

-

-

-

... More
For Shafts of 7.5mX5m upto a depth of 5m in all type of soil

537.12

1725

926532

... More
Beyond 5m dep up to 7.5mtr.

256.5

2070

530955

... More
Closed planking in trenches including strutting and shoring packing cavaties (wherever required) complete for sewerage works in saturated soil strata

-

-

-

... More
for works of depth of upto 1.5 m

204.8

689

141107.2

... More
for works of depth of upto 3.0 m

57.6

835

48096

... More
for works of depth of upto 4.5 m

1368.9

1193

1633097.7

... More
for works of depth of upto 6.0 m

1134

1276

1446984

... More
for works of depth of upto 7.5 m

-

-

-

... More
Refilling the pipeline/foundation trenches plinth sides,foundation etc with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth directed by Engineer-in-charge

786.44

245

192677.51

... More
Installation of HDPE product pipe by HDD method including preparing & setting up the plant & equipment preparing new pipe work material, installing new pipe work & commissioning by HDD operation including all related civil & mechanical works like excavation ,shoring strutting etc. drilling,stringing, reaming & pulling back the new pipe work on the designed bore path alignment by using approved guidence system, proper disposal of drilling fluid & restoration of site including backfilling of excavation & holes by approved material to 95% of original density after completion all inclusive as per indSTT:101-2007 : code of practice for Horizontal Directional Drilling technique suiting indian conditions.

-

-

-

... More
(i) All types of Soil(Except Mixed strata & rocks) - 200 mm

419.92

3393

1424788.56

... More
(ii) Other types of Soil / Mixed Strata - 200 mm

1049.8

8395

8813071

... More
(iii) Rocks - 200 mm

629.88

25242

15899430.96

... More
Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour , tools etc, and disposing the excavated excess material from the trench to a distance of 1000 meters, including making level the trench surface by utilising the serviciable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer incharge.

198.6

397

78844.2

... More
Construction of Composite type Manholes of various diameters and depth , as per the detailed specification of items of work annexed with

-

-

-

... More
i) 1200mm dia x upto 2000mm depth

16

169001

2704016

... More
ii) 1200mm dia x 2000 to 2300mm depth

1

186090

186090

... More
iii) 1500mm dia x 2300 to 2500mm depth

1

312039

312039

... More
iv) 1500mm dia x 2500 to 3000mm depth

1

312039

312039

... More
v) 1500mm dia x 3000 to 3500mm depth

16

421907

6750512

... More
vi) 1500mm dia x 3500 to 4000mm depth

11

485878

5344658

... More
vii) 1500mm dia x 4000 to 4500mm depth

12

540464

6485568

... More
viii) 1500mm dia x 4500 to 5000mm depth

6

633687

3802122

... More
ix) 1500mm dia x 5000 to 5500mm depth

9

700402

6303618

... More
x) 1500mm dia x 5500 to 6000mm depth

6

732231

4393386

... More
xi) 1500mm dia x 6000 to 6500mm depth

-

-

-

... More
xii) 1500mm dia x 6500 to 7000mm depth

-

-

-

... More
xiii) 1500mm dia x 7000 to 7500mm depth

-

-

-

... More
Hydrophillic swellable water bar: Providing water stop swellable barat pipe-concrete joint (20X10 mm thick) to avoid infiltration and exfiltration leakages of approve make MC Waterstop SW-IN. or equivalent

-

-

-

... More
i) 200 mm

142.2

552

78494.4

... More
Providing,Laying and jointing of Rigid PVC pipes for using underground drainage and sewerage system confirming to IS : 15328 - 2003 stifness class SN-8 (8 KN/m2,SDR -34) including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) in all types of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 5km including Bed concrete 1:3:6 (1 cement:3 coarse sand:6 graded granitic a basaltic stone aggregate 40mm nominal size) including rubble packing and Refilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in charge. a)160mm OD

790

4145

3274550

... More
Construction of manhole rectangular (On Road) in shape including cement concrete 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) foundation thickness of concrete 20cms and offset 10cms on both sides and first class brick work with bricks class designation 100kg/cm2 in cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including fixing in man-hole at 30cm c / c in 20x 20x15cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) and 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement and making channel in cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20m nominal size) neatly finished complete as per standard design.Inside size 0.90x0.60m and 1.00m deep (with RCC chamber/Manhole cover with frame M-30 concrete grade clear opening (size in mm), 600 x 900 mm clear opening Medium Duty 20 MT load bearing capacity) including fixing with cement concrete 1:2:4 ( 1 cement :2 coarse sand : 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar,including Cutting the bituminous road for laying of pipeline in trenches, including earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 5km. including supply and fixing of sewer trap inside chamber and Refilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km, reinstating the road surafce by rubble packing with hard laterite stone & providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40mm nominal size) and disposal of surplus earth as directed by the Engineer in charge including rubble packing etc complete. For Chamber on road: Inside size 0.90 x 0.60m and 1.00m deep

79

40248

3179592

... More
Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc.(Measurements shall be considered on finished item) .

516.42

1867

964156.14

... More
Providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the Engineer-in-Charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m. per 100 sq.m. including Providing and laying seal coat sealing the voids in a bituminious surface laid with F.E loader with 1 Cu.m. bucket capacity to the specified levels, grade and cross fall using Type A seal coat with 0.98 kg/sqm of bitumen of grade as per MoRT&H specifications clause 513.

1721.4

631

1086203.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.