Sewage And Infrastructure Development Corporation Of Goa Limited Tender

View complete overview of Goa SIDCGL Tender

Sewage And Infrastructure Development Corporation Of Goa Limited - SIDCGL Tender

Works
Civil And Construction
Eprocure
Opening Date19 Jan 2024
Closing Date2 Feb 2024
Tender Amount₹ 35,58,30,330 
Notes
Download

Costs

  • EMD

    ₹ 71,16,610
  • Document Cost

    ₹ 30,000
  • Tender Fee

    ₹ 6,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Receiving Chamber

1

1272000

1272000

... More
Coarse Screen Channels – Mechanical + Manual

1

2685000

2685000

... More
Raw Sewage Sump & Pump House

1

10260000

10260000

... More
Mechanical works

1

8379000

8379000

... More
Construction, Supply, Installation, Testing and Commissioning of 7.5 MLD STP consisting of Primary Treatment Units, Biological Sequential Batch Reactor (SBR) Process Units, Chlorination Units, Sludge Dewatering Units, Treated Sewage Pumping Station & Disposal to nearby Drain , Interconnecting Piping with required Gates & Valves, Roads & Pathways, Plant Drains & Storm Water Drains, Boundary Wall and other Miscellaneous Works etc. complete including all associated Civil, Mechanical, Electrical and Instrumentation Works.

-

-

-

... More
Inlet Chamber

1

688000

688000

... More
Fine Screen Channels – Mechanical + Manual

1

1019000

1019000

... More
Grit Chambers - Mechanical

1

1959000

1959000

... More
SBR Basins

1

56992000

56992000

... More
Chlorination Tank & Chlorinator cum Chlorine Tonner House

1

14998000

14998000

... More
SBR Air Blower House cum Administrative / MCC & Control Building

1

16264000

16264000

... More
Sludge Sump & Pump House

1

5008000

5008000

... More
Centrifuge House

1

3220000

3220000

... More
HT Substation

1

7678000

7678000

... More
Effluent Disposal Line

1

2489000

2489000

... More
Plant Utilities including Security Cabin, Roads & Pathways, Plant Drains & Storm Water Drains, Horticulture Landscaping maintaining aesthetic of premises and other Miscellaneous Works

1

5907500

5907500

... More
MECHANICAL WORKS

1

79769000

79769000

... More
Electrical Works (including HT as well as LT Works) and Instrumentation Works complete.

1

19814000

19814000

... More
SITE FILLING (OVERALL PLOT AREA)

1

20107000

20107000

... More
COMPOUND WALL

1

6823000

6823000

... More
RETAINING WALL

1

39610000

39610000

... More
Soil Stabilization work, Pilling work if required

1

34500000

34500000

... More
Operation and Maintenance of the various Units of 7.5 MLD Capacity Raw Sewage Pumping Station and 7.5 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology as a whole including Supply of Chemical and Consumables, Disposal of Plant Residuals (e.g. Screenings, Grit and Dewatered Sludge), Manpower required, General Maintenance of Civil Structures, Preventive and Breakdown Maintenance of Mechanical Equipments, Electrical Items, Field Instruments etc., Cost of Collection, Analysis, Reporting, Monitoring and Maintaining Record of Samples from the Raw Sewage and Treated Sewage daily collected at least for one time a day from the Entry and Exit of the STP Units thereon (excluding Power) as mentioned in the Tender.

-

-

-

... More
O & M for 2 Year

24

9600000

400000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.