Sewage And Infrastructure Development Corporation Of Goa Limited Tender
View complete overview of Goa SIDCGL Tender
Costs
EMD
₹ 88,355Document Cost
₹ 6,000Tender Fee
₹ 6,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SIDCG_22071_1Bid Award Id
ViewTender No
SIDCL/Admn-7/F.No.TN-03/ 143/ 25-26 Dt 17/04/2025 Ln13Tender Authority
Sewage And Infrastructure Development Corporation Of Goa Limited ViewPurchaser Address
-Website
http://eprocure.goa.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plugging of manhole both from upstream and pumping of Sewage from upstream or downstream sides while carrying out rectification of the Sewerlines /removing chokeup with sand bags and removing the same plugging after completion of the said work and making way for the smooth flow of sewage as directed by Engineer-in-charge.
2
14002
28004
... More
2.10m to 2.40m
36
1452
52272
... More
1.80m to 2.10m
36
1335
48060
... More
Earthwork in excavation over areas in saturated soil (exceeding 0.30 m depth up to a depth of 0.60 m) including disposal of excavated earth,upto a lift of 1.5 m & within a lead of 50m to be neatly dressed leveled, as directed by the Departmental Officer. excluding planking, timbering in trenches and dewatering. Extra for earthwork excavated in saturated soil for every 0.30 m. depth or part thereof over 0.60 m. depth. Extra for additional depth of 1.5 m or part thereof in saturated soil . For Bypass of existing sewer line 250 mm dia
-
-
-
... More
250 mm Dia HDPE
25
174
4350
... More
250 mm Dia HDPE
150
1983
297450
... More
Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour, tools, etc. and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviceable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer in charge. Rural Roads
30
410
12300
... More
1.50m to 1.80m
36
1218
43848
... More
Add extra for excavation in or under water and on liquid mud including cost of pumping and complete (extra rate per cu.m. of excavation qty. in saturated soil strata considering actual water table level during the construction as datum )
-
-
-
... More
Excavation work up to 1.5m depth from datum (measured from saturated soil/ strata level).
108
448
48384
... More
0.60 to 0.90m
36
806
29016
... More
Conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying true to line and level and perfect linking for joints for P.V.C / H.D.P.E complete in all respects as per the direction of the engineer in-charge
-
-
-
... More
Providing 2mm thick M.S clamp welded with ISA 25x25x6mm at ends including appliation of bonding solution such as SR solvent of fevicol or Dr fixit or any other equivalent product including fixing with necessary nut, bolts and applying a coat of red oxide etc. complete as per directed by Engineer-in-charge. 250 mm Dia
10
1635
16350
... More
2.40m to 2.70m
36
1569
56484
... More
3) 1500mm dia x 2300 to 2500mm depth
2
274135
548270
... More
For works of depth up to 1.50 m
450
689
310050
... More
0.90m to 1.20m
36
923
33228
... More
Closed planking in trenches including strutting and shoring packing cavaties (wherever required) complete for sewerage works in saturated soil strata
-
-
-
... More
Excavation work upto 3.00m. depth from datum (measured from saturated soil/ strata level).
144
781
112464
... More
Refilling the pipeline/foundation trenches plinth sides,foundation etc with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 m and all lifts and disposal of surplus earth directed by Engineer-in-charge.
233.58
245
57226.7
... More
Supplying, of HDPE pipes at store or site of work including loading unloading, stacking, transit insurance etc. complete bearing ISI mark & conforming to IS: 14333- 2022 & made from PE 100 resin Class IV (6 kg/cm2)
-
-
-
... More
250 mm Dia HDPE
150
10
1500
... More
Providing and laying in design & pattern factory made chamfered edge Cement Concrete paver blocks ( C. C. paver blocks) of M35/M40 strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of fine sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with river/manufactured sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. complete as per manufacturer’s specifications & direction of Engineer. b.60mm thick with Red/ Black colour (M35 grade)
75
1122
84150
... More
for works of depth of upto 3.0 m
900
835
751500
... More
a.Manhole upto 2.00m depth
3
1124
3372
... More
Jointing of HDPE pipes by heating the two ends of the pipe with electrically heated mirror, to the required temperature, including the hire charges of heating mirror and the generator set for the electricity for the heating mirror etc complete as per the direction of the engineer in- charge
-
-
-
... More
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
45
2211
99495
... More
4) 1500mm dia x 2500 to 3000mm depth
2
321597
643194
... More
TRANSPORTATION AND CARRIAGE OF MATERIALS( A) By tipper truck including loading, unloading and stacking ( ii ) Earth
90.42
398
36061.05
... More
Construction of Composite type Manholes of various diameters and depth , as per the detailed specification of items of work annexed with
-
-
-
... More
Providing and laying in position cement concrete below foundation M15(1:2:4) (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : 250 mm dia
38.06
6810
259203.92
... More
1) 1200mm dia x upto 2000mm depth
1
170389
170389
... More
Desilting the gritty and silt deposits from manholes including necessary arrangements for lifting the deposits taking out and disposal within 5 K.m.s. as directed by the Engineer-in-charge
-
-
-
... More
b.Manhole upto 3.00m depth
1
1148
1148
... More
Hiring of grabber including Driver, Diesel, oil labour etc.
1
8800
8800
... More
1.2m to 1.50m
36
1040
37440